Copan Toe Drain Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912BV22R0032
Agency
ENDIST Tulsa US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z2KA Repair Or Alteration Of Dams
Place of performance
Copan, Oklahoma 74022, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a firm-fixed price construction contract to replace the toe drain system and remove and replace road culverts on the Copan dam toe road in Copan, Oklahoma. The U.S. Army Corps of Engineers Engineering District Tulsa will evaluate proposals received under this total small business set-aside using a tradeoff process, with evaluation criteria of past performance, technical approach, key personnel, experience, and price. Proposals are due no later than August 5, 2022.

The work will be performed under NAICS code 237990, with a PSC code R499. The place of performance is Copan, Oklahoma 74022. The replacement of approximately 6,000 linear feet of pipe and construction of manholes and culverts must be completed within 300 calendar days of the notice to proceed. The total estimated value ranges from $5-10 million.

Notice text

7 versions

Update #7 · Latest ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0003 - This amendment updates the Wage Determination, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0004 - This amendment extends the date that proposals are due for this requirement and provides a picture of the disposal area, please see attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0005 - Proposals for this requirement have been extended to 5 August 2022 at 10:00 AM CST, please see attachments for full details.*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0006 - This amendment *Amendment 0006 - This Amendment is to provide a revised specification section 00 11 00, 01 20 00, and various drawings, please see attachments for full details.*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Update #6 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0003 - This amendment updates the Wage Determination, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0004 - This amendment extends the date that proposals are due for this requirement and provides a picture of the disposal area, please see attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0005 - Proposals for this requirement have been extended to 5 August 2022 at 10:00 AM CST, please see attachments for full details.*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Update #5 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0003 - This amendment updates the Wage Determination, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0004 - This amendment extends the date that proposals are due for this requirement and provides a picture of the disposal area, please see attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* 

Update #4 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.* *Amendment 0003 - This amendment updates the Wage Determination, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Update #3 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*  *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Update #2 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Update #1 ·

Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV22R0032' to obtain more details.*

Attachments

Files attached to this notice, newest first
File Type Posted
W912BV22R0032_Copan Toe Drain_AM0006.pdf PDF
W912BV22R0020_AM0005.pdf PDF
W912BV22R0032_AM0003.pdf PDF
W912BV22R0032_0002.pdf PDF
W912BV22R0032_AM0001.pdf PDF
Copan Lake Foundation Report No. 3.pdf PDF
Copan Lake Foundation Report No. 1.pdf PDF
Copan TD 100PCT 29APR2022.pdf PDF
Copan Lake Foundation Report No. 2.pdf PDF
W912BV22R0032_RFP Package.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Copan Toe Drain Replacement Award Award Notice
Copan Toe Drain Replacement This notice · Latest solicitation Solicitation
Copan Toe Drain Replacement Pre-Solicitation
Copan Toe Drain Replacement Original Pre-Solicitation