Cooling Towers at RIA-JMTC

Closed Solicitation Posted

Solicitation number
W519TC25Q2175
Agency
ACC Rock Island Army Contracting Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
PSC
3680 Foundry Machinery, Related Equipment And Supplies
Place of performance
Rock Island, Illinois 61299, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Materiel Command Contracting Command at Rock Island Arsenal is seeking to procure two cooling towers for the Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC). The solicitation, numbered W519TC25Q2175, requires vendors to provide and install two Marley AQ496M2SAF cooling tower units or equivalent, with specific technical requirements including 304 Stainless Steel construction and a combined flow of at least 920 gpm. The procurement will use a Lowest Price Technically Acceptable (LPTA) source selection process, with evaluation criteria focusing on technical factors such as experience, published data, references, compliance statements, equipment identification, and warranty. A mandatory site visit is scheduled for 19 March 2025 at 10:00 AM, where vendors must have safety shoes and eye protection and obtain advance reservations. The quote submission deadline is 11:00 AM on 22 April 2025, with proposals expected to remain valid for 60 days.

The solicitation was originally set aside for small businesses but has been amended to remove the set-aside designation, opening the competition to all vendors. The project is located in Rock Island, IL, with the cooling towers to be installed in Building 212 of the RIA-JMTC complex. Contractors will be responsible for delivery, installation, removal of existing units, training, and providing service support capabilities, including on-site response within 48 hours of notification. The government intends to award a single Firm Fixed Price (FFP) contract, with delivery expected within 77 days of contract award. The total heat load requirement is 4,569,500 Btu/hr, with each cooling tower unit having a maximum operating weight of 4,800 lbs per cell and variable frequency drive (VFD) fan motors. Final acceptance will be contingent upon successful performance testing, installation, training completion, and government inspection.

Notice text

2 versions

Update #2 · Latest ·

Action is re-open for initial and revised quotes.

A site visit is scheduled for 10:00AM Central Time on 19 March 2025, at Rock Island Arsenal - Joint
Manufacturing and Technology Center (RIA-JMTC). Vendors and Government representatives will meet at the
Pedistrian Gate 8 on the south side of Building 211 (JMTC Complex). Vendors must have safety shoes and eye protection. Reservations for this site visit are mandatory for all attendees at least two business days prior to the site visit. If you currently have badge access you still must make a reservation for the site visit in order for the government to control the number of attendees at any given time. You will not be allowed to attend without a reservation regardless of installation access.

All attendees without badge access must complete and return the Rock Island Arsenal Access Request Form no later
than two business days prior to the site visit and return the form to: Contract Specialist, John Jacobsen, at
john.e.jacobsen16.civ@army.mil

Update #1 ·

A site visit is scheduled for 10:00AM Central Time on 19 March 2025, at Rock Island Arsenal - Joint
Manufacturing and Technology Center (RIA-JMTC). Vendors and Government representatives will meet at the
Pedistrian Gate 8 on the south side of Building 211 (JMTC Complex). Vendors must have safety shoes and eye protection. Reservations for this site visit are mandatory for all attendees at least two business days prior to the site visit. If you currently have badge access you still must make a reservation for the site visit in order for the government to control the number of attendees at any given time. You will not be allowed to attend without a reservation regardless of installation access.

All attendees without badge access must complete and return the Rock Island Arsenal Access Request Form no later
than two business days prior to the site visit and return the form to: Contract Specialist, John Jacobsen, at
john.e.jacobsen16.civ@army.mil

Attachments

Files attached to this notice, newest first
File Type Posted
W519TC25Q2175 conformed.pdf PDF
W519TC25Q2175-0001.pdf PDF
Attachment 0002 25-2-18 CDRL - Cooling Towers.docx DOCX document
Visitor Safety Brief.pdf PDF
Attachment 0001 RIPD E4000-25-2-18 - Cooling Tower rev2.docx DOCX document
W519TC25Q2175.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity