Attachment 0001 RIPD E4000-25-2-18 - Cooling Tower rev2.docx
DOCX document 51 KB Posted
- Attached to
- Cooling Towers at RIA-JMTC Federal contract opportunity
- Solicitation number
- W519TC25Q2175
About this file
This document is a Purchase Description for two replacement cooling towers for the Rock Island Arsenal Joint Manufacturing Technology Center (RIA-JMTC) located in Building 212. The project requires procuring two Marley AQ496M2SAF cooling tower units (or equivalent) constructed of 304 Stainless Steel, with specific technical requirements including a maximum operating weight of 4,800 lbs per cell, variable frequency drive (VFD) fan motors, mesh screens, and a reverse flow switch. The units must produce a combined flow of at least 920 gpm, have an airflow of 86,000 cfm, and a total heat load of 4,569,500 Btu/hr.
The solicitation (W519TC25Q2175) includes a mandatory site visit scheduled for 10:00 AM Central Time on 19 March 2025 at Rock Island Arsenal, with vendors required to pre-register and comply with specific access and safety requirements. The contractor will be responsible for delivery, installation, removal of existing units, training, and providing service/support capabilities, including on-site response within 48 hours of notification. Final acceptance will be contingent upon successful performance testing, installation, training completion, and government inspection. The project is being executed by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC25Q2175 conformed.pdf | ||
| W519TC25Q2175-0001.pdf | ||
| Visitor Safety Brief.pdf | ||
| W519TC25Q2175.pdf | ||
| Attachment 0002 25-2-18 CDRL - Cooling Towers.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ROCK ISLAND ARSENAL | RIPD: E4000-25-2-18 |
| PURCHASE DESCRIPTION | DATE: 5-Feb-25 |
25-2-18 COOLING TOWERS
| 1. | GENERAL SYSTEM DESCRIPTION | 2 |
| 2. | STANDARDS AND PUBLICATIONS | 2 |
| 2.1 | Clarification | 2 |
| 2.2 | National Standards and Specifications | 2 |
| 3. | DESIGN | 3 |
| 3.1 | Ownership | 3 |
| 3.2 | General Design Standards | 3 |
| 3.3 | Safety, Security and Environmental | 6 |
| 3.4 | Responsibilities | 9 |
| 4. | QTY (2) Cooling Towers | 9 |
| 4.1 | Current System: | 9 |
| 4.2 | Dimensions: | 9 |
| 4.3 | Construction: | 10 |
| 4.4 | Capacities: | 10 |
| 4.3 | APPROVAL/SHIPPING | 10 |
| 4.4 | Shipping | 10 |
| 4.5 | Installation | 11 |
| 4.6 | Completion | 12 |
| 5. | TRAINING | 12 |
| 5.1 | Schedule | 13 |
| 5.2 | Location | 13 |
| 5.3 | Type | 13 |
| 6. | SERVICE | 13 |
| 6.1 | Service/Support Requirements | 13 |
GENERAL SYSTEM DESCRIPTION
· Rock Island Arsenal Joint Manufacturing Technology Center utilizes cooling towers to provide chilled water to cool the Arc Furnaces in the foundry of Building 212. Cooling towers operate in a water loop that consists of a pumping system that pumps water up to the tower which then cascades down a system of ribs where it is fan cooled and chilled before returning to the main sump where it is then pumped out to where cool water is required. After the cool water is heated up by process, it is returned to the system loop where it is re-pumped up to the cooling towers to be cycled again.
STANDARDS AND PUBLICATIONS
Clarification Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal. Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.
National Standards and Specifications The following specifications in effect on the Date of Invitation for Bid/Request for Proposal form a part of this purchase description. In the case of conflicting requirements, the more stringent shall apply. This may not be an all-encompassing list. The contractor shall conform to all local and federal codes and standards applicable to the equipment they are providing based on location and purpose of equipment. It is not the responsibility of the government to make modifications to ensure compliance.
Occupational Safety and Health Act of 1970 (OSHA).
American Society of Testing and Materials (ASTM).
American Society of Mechanical Engineers (ASME).
American National Standards Institute (ANSI).
National Electrical Manufacturers Association Standards (NEMA).
Electronic Industries Association (EIA).
Institute of Electrical and Electronics Engineers (IEEE).
American Code for Information Exchange (ASCII).
American Welding Society (AWS).
American Gear Manufacturers Association (AGMA).
National Fire Protection Association (NFPA).
1.1.1.1 NFPA-70 National Electrical Code
1.1.1.2 NFPA-79 Electrical Standard for Industrial Machinery.
International Standards Organization (ISO).
CTI certification per STD-201
DESIGN
Ownership This equipment is a standard product of the manufacturer and shall require either no change or minor design changes to meet requirements of these specifications. Therefore, ownership of the design will remain with the manufacturer.
General Design Standards DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.
UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English-US system or both the English-US and the metric systems, unless otherwise specified in this document.
ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable): Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).
DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.
ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.
UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.
UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.
UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:
1.1.1.3 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.
1.1.1.4 If, due to contractor caused problems, the equipment or components of the equipment must be moved or removed and replaced, by RIA after initial placement, the contractor shall be billed for such work at current RIA labor and overhead rates.
CONDUIT: Flexible conduit is not permitted in exposed areas. All wires, cables, and hoses will be enclosed by rigid, oil-proof protection, except where flexibility is necessary for operation of the equipment. Flexible wires, cables and hoses shall be arranged to prevent draping or tripping hazards.
SERVICE ACCESS: Components subject to periodic adjustment, replacement, or servicing shall be readily accessible. Meaning that experienced personnel can access the part after no more than 30-min of labor. If any special tools or equipment are necessary to access these components, said equipment will be supplied as part of the system and provided with a proper storage location within the system.
DEFLECTION: The system shall recover from distortion and deflection at no load. The machine and its components shall be sufficiently rigid that work piece finish and tolerances are not impaired by machine vibration.
NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.
COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.
REPLACEMENT COMPONENTS: All replaceable components shall be manufactured to definite standards for tolerance, clearance, and finish, enabling components to be field installed without further machining.
CASTINGS AND FORGINGS: All castings and forgings shall be free of defects, scale, and mismatching. No process such as welding, peening, plugging, or filling shall be used for reclaiming any defective part for use in this equipment without the prior written consent of the contracting officer.
SURFACE BUILDING AND COATINGS: Welding, brazing, soldering, coating or plating shall be employed only where specified in the original design. These operations may not be employed as a means of reclaiming a defective part.
FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.
CLEANING AND DEBURRING: All surfaces of castings, forgings, molded parts, stampings, and welded components shall be cleaned and free from sand, dirt, fins, flash, scale, flux, and other harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as specified herein, the condition and finish of all surfaces shall be commensurate with the manufacturer’s commercial practice.
FILTRATION/REGULATION: Equipment requiring filtered or regulated energy sources shall be supplied with the components necessary to perform this function. E.g. the equipment shall be supplied with a Filter, Regulator, Lubricator (FRL) device, if filtered, lubricated, regulated pressurized air is required for the efficient, proper operation of the equipment. These devices shall be located on the equipment side of the lockout devices at the points of first connections.
DIALS AND GAUGES: All scales, dials, and gauges shall be manufactured of corrosion and oil resistant material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.
FOUNDATION: A separate foundation is required to meet alignment tolerances and/or support the equipment floor load, or provide isolation of the system. Installation of the foundation shall be the responsibility of the contractor. See 6.2.1 and 6.2.2 for further information. The contractor shall be responsible for all anchoring mechanisms and supplies/materials required for install. In this instance, the contractor can reuse the existing support structure only if the existing support structure matches to they type of equipment being installed. In any other case, a new support structure must be provided. It is not the responsibility of the government to ensure compatibility nor is it the responsibility of the government to ensure the support structure can handle the load. This is the responsibility of the contractor.
Safety, Security and Environmental SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.
1.1.1.5 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.
1.1.1.5.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The JMTC Representative/ COR shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.
1.1.1.5.2 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti-Terrorism Training.
1.1.1.5.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.
1.1.1.5.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.
1.1.1.6 Security Training: The contractor shall complete the following training:
1.1.1.6.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete. The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.
1.1.1.6.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.
1.1.1.7 For Contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks onsite, or remotely or (2) Remote access via logon, to a DoD network using DoD-approved remote access procedures, or (3) Physical access to multiple DoD facilities or multiple Non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6-months, or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractors needing a NACI or equivalent investigation or higher investigation will coordinate this investigation through their COR. Contractor personnel shall turn in CAC cards upon completion of their contractual obligations, or at the request by the COR, or at the request of the Contracting Officer.
FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.
REAL ID: Starting 03-May-2025 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.
FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation Fire Regulations, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the installation Fire Marshall for use of open flame devices, such as torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment, in, on, or within 15-ft of the building. The contractor shall be liable for any fire loss to the Government properly attributable to negligence on the part of the contractor, including failure to comp1y with fire prevention measure described by the terms of this purchase description.
INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.
MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.
SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including conforming to confined space work requirements when applicable.
SAFETY LOCKOUTS: Each point of first connection shall be designed and constructed to allow the utility to be completely isolated from the equipment. This isolation shall be insured by application of a standard key locking padlock. The device(s) shall only be lockable in the de-energized (OFF) condition.
TRAPPED ENERGY: Means shall be provided for the controlled release of stored energy. This energy may be in the form of, but not limited to, air and hydraulic pressure accumulators, capacitors, springs, counter balances and flywheels. When appropriate, a label shall be affixed to the stored energy source to identify the hazard.
WORKING RANGE: Hydraulic and pneumatic components shall be selected, which cannot be adjusted outside the safe working range of the circuit and/or equipment.
Responsibilities SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.
QTY (2) Cooling Towers Equipment: The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication.
Current System:
Currently, RIA-JMTC utilizes (2) Marley Aquatowers installed on the roof of the pumphouse on the west side of Building 212. One is a right handed unit and one is a left handing unit installed in a piping network with a remote sump and pumps located in the pumphouse. The contractor shall be responsible for the provision and installation of two replacement units to integrate into the current system.
Dimensions:
COMPONENT WEIGHT: The units shall have a max operating weight of 4800lbs. per cell. The total weight of the two sides of the cooling system shall be 9,600 lbs. This number is based on the current system in which there is structural steel already in place to support the current system.
SUPPORT STRUCTURE: There is currently an existing cooling tower system loop in operation at the site of this project installation. Part of the existing system is the support structure that is currently in place on the roof of the pumphouse on the west side of the foundry in B212. The contractor shall examine the current structural steel and determine if the current system can be reused to support the replacement cooling towers. If the current system cannot be used, then it is the responsibility of the contractor to provide a sufficient support structure for the provided solution. The constraints for this portion of the requirement are the footprint of the pumphouse roof as well as the roof loading. It is the responsibility of the contractor to determine if the current structural steel is sufficient to support their system.
Construction:
COOLING TOWER: The cooling tower units shall be constructed of 304 Stainless Steel. The units shall include a bottom outlet for pipe connection to match the currently installed system. One unit shall be designed as a left hand unit and one unit shall be a right hand unit to match the installation set-up of the current system. The units shall be Marley AQ496M2SAF units or equivalent.
VFD: The fan motor shall include a VFD to allow for varying fan speeds necessary for different cooling rates. The current system is a full-on, full-off system which can introduce ice if the water is overcooled. The VFD shall also provide single phase protection in the event of power leg drop out.
MESH SCREENS: The units shall be designed in such a way that there is a rigid grate system installed to protect the internal cooling mesh from large obstructions such as birds. There shall also be a finer mesh installed over the top of that to protect against floating debris such as cotton, leaves, bugs etc. The mesh systems shall be fastened in such a way that they can be removed in the event that internal components need to be serviced i.e bolted or fastened as opposed to welded.
REVERSE FLOW SWITCH: The unit shall be equipped with a reverse flow switch that when engaged, will cycle the flow in reverse to assist with de-icing by running warmed water through the system.
ELECTRICAL: The contractor shall be responsible for tying the units in to the current electrical system set-up. If new controllers for the new units are required, then it is the responsibility of the contractor to provide and install those.
Capacities:
FLOW: The 2 units combined shall produce a flow of at least 920 gpm.
FAN: The fans on the unit shall have a speed of 563 rpm with a motor speed of at least 1800 rpm.
AIRFLOW: Each unit shall have an airflow of at least 43000 cfm for a total of at least 86000 cfm.
HEAT LOAD: Total heat load shall be at least 4,569,500 Btu/hr
1. APPROVAL/SHIPPING
Shipping RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.
SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 am (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.
RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN: Mr. Robert Mcclure TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.
ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.
Installation SITE PREPARATION EXECUTION: The contractor will be solely responsible for site preparation except as specifically excluded in this document. This includes but is not limited to excavation, foundation work, and surface preparation. This work may be performed through the use of a sub-contractor, but the specification, supervision, and certification of the work remains the responsibility of the primary contractor.
PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.
LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation/start-up of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.
1.2.1.1 Any lubricants, coolants, oils etc. required for initial start-up and operation shall be the responsibility of the contractor to provide.
1.2.1.2 Any anchoring mechanisms/materials shall be the responsibility of the contractor to provide. If RIA-JMTC is installation the foundation, JMTC will be responsible for the installation of the contractor provided anchoring mechanisms in preparation for machine placement.
1.2.1.3 Any decking, stairs, rail systems, or other specialized operator/machine interfaces shall be provided by the contractor for use at the install location DISPOSAL OF OLD UNITS: The contractor shall be responsible for the removal and disposal of the units being replaced.
SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.
OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.
LIABILITY: In any case, the equipment remains the property of the contractor, and the contractor shall assume all responsibility and liability for the equipment and the work performed upon it. The government shall be held harmless for any damage done to the equipment at any time up until final acceptance of the equipment by Rock Island Arsenal, except in the case of intentional damage and/or gross negligence on the part of Rock Island Arsenal personnel.
SET-UP: The contractor shall be responsible for set-up and connection of the equipment beyond connections of the utilities to the points of first connection.
SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safe guards, various precautions, and plant protection measures. At all times during the execution of this SOW, the contractor will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal Island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the Island.
Delivery Hours or Service Hours: Service calls, equipment installation, training, and equipment delivery (where the contractor offloads) will only be allowed from 0600 – 1530, Monday through Thursday, except for Government Holidays. Deliveries of items where the contractor has opted for Government “off-loading option”, must be received before 1200 hours. These hours are subject to change, however, the Government will notify the contractor of such changes. The vendor will contact the designated Performance Certifier/ COR to obtain an electronic key for their representative (i.e. delivery driver) in order to have access to the facility. Deliveries and service calls outside the normal hours stated above will be coordinated with the Performance Certifier/ COR to address any emergency situations."
Completion Final acceptance of the equipment shall occur after the following:
1.2.1.4 Set-up completion by the contractor.
1.2.1.5 Successful completion of performance testing at Rock Island Arsenal.
1.2.1.6 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.
1.2.1.7 All required training is complete.
1.2.1.8 Complete documentation packages are delivered.
TRAINING
The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.
Schedule Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).
Location All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.
Type Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.
MAINTENANCE: Mechanical and electrical control and diagnostic maintenance training shall be provided by the contractor. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for (2) personnel.
SERVICE
Service/Support Requirements The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:
STAFF: Staffed by qualified, English speaking personnel fully knowledgeable in the service/repair of the equipment offered.
TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.
ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.
MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.
PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.