Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB)
Closed Solicitation Posted
A newer special notice was posted. See the latest special notice from .
- Solicitation number
- W912HP22R6000
- Agency
- ENDIST Charleston US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The Charleston District of the U.S. Army Corps of Engineers seeks to award two Multiple Award Task Order Contracts to provide general construction services with an emphasis on fire protection at various Defense Distribution Depots supported by the Defense Logistics Agency Installation Support. The MATOC pools will include up to five contractors each, with one pool covering facilities east of the Mississippi River and the other covering facilities west. Task orders will generally range from $3,500 to $20 million. Proposals are due by January 25, 2022 and will be evaluated based on technical qualifications and past performance.
This is a 100% set-aside for small businesses. The primary NAICS code is 238210 and PSC code R499. Each MATOC pool will have a capacity of $49.5 million to be shared among awardees. Work will include construction, fire protection systems, and associated professional services performed at Defense Distribution Depots nationwide. The period of performance for task orders issued under the MATOCs will be one base year with four option years.
Notice text
6 versions
Update #6 · Latest ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Amendment 0001 posted 16 December 2021
Attachments listed in the solicitation are being uploaded as separate attachments for ease of use, Posted 5 January 2022
Amendment 0002 Posted as of 7 January 2022
Amendment 0003 Posted as of 21 January 2022 - New proposal submission instructions
Amendment 0004 Posted as of 3 August 2022 - Solicitation is being put on hold
Update #5 ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Amendment 0001 posted 16 December 2021
Attachments listed in the solicitation are being uploaded as separate attachments for ease of use, Posted 5 January 2022
Amendment 0002 Posted as of 7 January 2022
Amendment 0003 Posted as of 21 January 2022 - New proposal submission instructions
Update #4 ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Amendment 0001 posted 16 December 2021
Attachments listed in the solicitation are being uploaded as separate attachments for ease of use, Posted 5 January 2022
Amendment 0002 Posted as of 7 January 2022
Update #3 ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Amendment 0001 posted 16 December 2021
Attachments listed in the solicitation are being uploaded as separate attachments for ease of use, Posted 5 January 2022
Update #2 ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Amendment 0001 posted 16 December 2021
Update #1 ·
The Charleston District has a requirement from the Defense Logistics Agency (DLA) to provide general construction w ith an emphasis on fire protection at various Defense Distribution Depots, supported by DLA Installation Support for Distribution. The Charleston District intends to aw ard tw o (2) Multiple Aw ard Task Order Contracts (MATOC) for general construction w ith an emphasis on f ire protection activities. MATOC “A” w ill primarily cover facilities east of the Mississippi River and MATOC “B” w ill primarily cover facilities w est of the Mississippi River. Each MATOC pool w ill each include a target of five (5) contractors. Task orders w ill generally range from the simplified acquisition threshold to $20M, but on occasion there may be a need for a task order outside this range. Only firm-fixed price (FFP) task orders w ill be allow ed under these tw o (2) MATOCs. The total value of the solicited capacity w ill be equally divided betw een the tw o MATOC pools ($49,500,00 of capacity each). This acquisition w ill be set-aside 100% for small business concerns.
Attachments
Notice history
| Notice | Type | Posted |
|---|---|---|
| W912HP22R6000 Fire Protection Amendment 0006 | Special Notice | |
| Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB) Amendment 0005 Phase TWO | Special Notice | |
| Diving Services for the Cooper River Rediversion Project | Solicitation | |
| Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB) | Solicitation | |
| Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity