About this opportunity

The U.S. Army Corps of Engineers, New York District is conducting market research through a Sources Sought notice to determine qualified small-business interest in constructing a power generation facility with microgrid at Joint Base McGuire-Dix-Lakehurst, Burlington County, New Jersey, with solicitation release planned for late June 2026 and award targeted for September 2026. Responses are due by July 15, 2026. No set-aside has been identified; the Government will use this market research to inform whether to pursue a small-business set-aside or full and open competition.

The project magnitude is between $5 million and $15 million. Work is performed at Joint Base McGuire-Dix-Lakehurst (with contracting oversight at USACE District New York, 26 Federal Plaza, New York). The scope includes a 400-kilowatt photovoltaic array, a 1.5-megawatt battery energy storage system, two 500-kilowatt natural gas generators, a microgrid controller, electrical support infrastructure, fire suppression systems, utilities, communications, site improvements, and associated support facilities. The facility will be designed as permanent construction in accordance with Department of Defense standards and Unified Facilities Criteria, incorporating antiterrorism and force protection requirements.

The procurement method is Invitation for Bids using sealed bidding. Contract duration is 730 calendar days with phased work. NAICS code 236220 applies (Commercial & Institutional Building Construction).

Respondents must submit two past projects of similar scope completed within seven years, including airfield pavement, airfield lighting, photovoltaic systems, battery storage, switchboards, or natural gas generators. Verification of small-business status, CAGE Code, SAM Unique Entity Identifier, compliance with FAR clause 52.219-14 subcontracting limitations, and bonding capacity is required. Responses should be emailed to Michael.L.McCue@usace.army.mil.

Notice text

2 versions

Update #2 · Latest ·

The U.S. Army Corps of Engineers, New York District is issuing this Market Research, Sources Sought Notice to determine if there is an adequate number of interested and qualified social-economic, small businesses having the capability and bonding capacity for the following effort. The procurement method for this solicitation will be Invitation for Bids, sealed bidding.

This market research is for the construction of a project at McGuire AFB, Burlington County, NJ, part of the Joint Base-MDL, New Jersey.   The project magnitude is between $5- $15 million. 

Responses to this Sources Sought will be used by the Government for Market Research analysis only, as an aid in its making of the appropriate acquisition decision(s); such as; use of a small business set aside; or a small business set-aside within a specific socio-economic category or full and open competition.

This project is planned for advertisement starting in late June 2026, with an award planned for by September 2026.

The contract duration will be 730 calendar days for the entire project with phasing work involved.  The North American Industry Classification System (NAICS) code is for general construction; 236220 for Commercial & Institutional Facilities.

All interested businesses should notify this office in writing by e-mail and provide a response to the questions below –

  1. Prior Construction Performance – Submit / provide a brief description of two (2) past performed projects, completed in the last seven (7) years (defined as turned over to the customer by this response due date), for a same or similar scope.  Similar scope includes electrical and communication construction, such as constructing/installing Photovoltaic systems, PV’s, switchboards, BESS, and/or NG generators, etc. Indicate in the description if the project was completed on time or if delays were incurred state why.   
  1. Provide a statement verifying the Prime Contractor is capable to performance the scope of work and will not be in violation of far clause 52.219-14

The intent of this project is to construct a new 400 KW photovoltaic array (PV) in conjunction with a battery energy

storage system (BESS) at 1.5 MW, microgrid controller, two 500kW natural gas generators. The necessary electrical

support infrastructure will be installed to connect the PV array and BESS to the EVCF and building 678 through the

existing building transformer. This will provide redundancy in the electrical distribution system and the black start

ability to switch between grid power, on base resilient power, and generators at the critical facilities. These will all be

interconnected and controlled by a microgrid control system constructed by this project. The project also will include

fire suppression system, all utilities, communications, site improvements, and associated support facilities. The

facility will be compatible with applicable Department of Defense, Air Force, and base design standards. In addition,

local materials and construction techniques shall be used where cost effective. The facility will be designed as

permanent construction in accordance with Unified Facilities Criteria 1-200-01, General Building Requirements. This

project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities

Criteria 4-010-01.

52.219-14 Limitations on Subcontracting

52.219-14 (e)

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract

performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

Provide identification and verification of the company as Small Business for NAICS Code 236220.  Also include if you fall within any socio-economic categories.

Provide the Company CAGE Code and System for Award Management (SAM) Unique Entity Identifier (UEI) Number.

The interested contractor must indicate, and demonstrate their capability of obtaining performance and payment bonds for a project in the dollar amount (price or range) listed previously, above, in the description.  

All interested businesses should submit their responses in writing by e-mail. The due date for responses is 14 days from this announcement. All responses should be emailed to: Michael.L.McCue@usace.army.mil

Update #1 ·

The U.S. Army Corps of Engineers, New York District is issuing this Market Research, Sources Sought Notice to determine if there is an adequate number of interested and qualified social-economic, small businesses having the capability and bonding capacity for the following effort. The procurement method for this solicitation will be Invitation for Bids, sealed bidding.

This market research is for the construction of a project at McGuire AFB, Burlington County, NJ, part of the Joint Base-MDL, New Jersey.   The project magnitude is between $5- $15 million. 

Responses to this Sources Sought will be used by the Government for Market Research analysis only, as an aid in its making of the appropriate acquisition decision(s); such as; use of a small business set aside; or a small business set-aside within a specific socio-economic category or full and open competition.

This project is planned for advertisement starting in late June 2026, with an award planned for by September 2026.

The contract duration will be 730 calendar days for the entire project with phasing work involved.  The North American Industry Classification System (NAICS) code is for general construction; 236220 for Commercial & Institutional Facilities.

All interested businesses should notify this office in writing by e-mail and provide a response to the questions below –

  1. Prior Construction Performance – Submit / provide a brief description of two (2) past performed projects, completed in the last seven (7) years (defined as turned over to the customer by this response due date), for a same or similar scope.  Similar scope includes construction of airfield pavement, airfield lighting and/or other airfield construction.. Indicate in the description if the project was completed on time or if delays were incurred state why.   
  1. Provide a statement verifying the Prime Contractor is capable to performance the scope of work and will not be in violation of far clause 52.219-14

The intent of this project is to construct a new 400 KW photovoltaic array (PV) in conjunction with a battery energy

storage system (BESS) at 1.5 MW, microgrid controller, two 500kW natural gas generators. The necessary electrical

support infrastructure will be installed to connect the PV array and BESS to the EVCF and building 678 through the

existing building transformer. This will provide redundancy in the electrical distribution system and the black start

ability to switch between grid power, on base resilient power, and generators at the critical facilities. These will all be

interconnected and controlled by a microgrid control system constructed by this project. The project also will include

fire suppression system, all utilities, communications, site improvements, and associated support facilities. The

facility will be compatible with applicable Department of Defense, Air Force, and base design standards. In addition,

local materials and construction techniques shall be used where cost effective. The facility will be designed as

permanent construction in accordance with Unified Facilities Criteria 1-200-01, General Building Requirements. This

project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities

Criteria 4-010-01.

52.219-14 Limitations on Subcontracting

52.219-14 (e)

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract

performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

Provide identification and verification of the company as Small Business for NAICS Code 236220.  Also include if you fall within any socio-economic categories.

Provide the Company CAGE Code and System for Award Management (SAM) Unique Entity Identifier (UEI) Number.

The interested contractor must indicate, and demonstrate their capability of obtaining performance and payment bonds for a project in the dollar amount (price or range) listed previously, above, in the description.  

All interested businesses should submit their responses in writing by e-mail. The due date for responses is 14 days from this announcement. All responses should be emailed to: Michael.L.McCue@usace.army.mil

Files

File Type Posted
2- Sources Sought Eval -Microgrid.pdf PDF
2- Sources Sought Eval -Microgrid.docx DOCX document

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJ Joint Base MDL, New Jersey, United States · NAICS 236220 ENDIST Louisville Total Small Business
Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL). Joint Base MDL, New Jersey 08733, United States · NAICS 236220 ENDIST New York No set-aside
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business
Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot Texarkana, Texas 75501, United States · NAICS 238210 ENDIST Fort Worth No set-aside
106 CE electrical loop repair 150 Old Riverhead Rd Westhampton Beach, NY 11978 11978 · NAICS 238210 New York National Guard No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors