Construct Blast Fence
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S6M-25-B-A011
- Agency
-
Alabama National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Birmingham, Alabama 35217, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Alabama Army National Guard's 117th Air Refueling Wing is soliciting construction services to demolish existing blast deflectors and construct two new full power jet blast deflectors sized to accommodate KC-135 aircraft engine run-ups at Sumpter Smith National Guard Base in Birmingham, Alabama. The project includes constructing new concrete paving systems, relocating existing flight line security lighting poles, and repositioning flight line fuel system emergency shutoff controls. Contractors must provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for completion. The contract will be awarded to the responsible bidder whose proposal is most advantageous to the government based on price considerations. A pre-bid conference was held on August 12, 2025, with questions accepted until August 26, 2025, and proposals due by September 4, 2025 at 2:00 PM CDT.
This procurement is set aside 100% for small businesses under NAICS code 236220 with a size standard of $45,000,000. The project magnitude ranges between $1,000,000 and $5,000,000, with nine contractors submitting bids ranging from approximately $1.2 million to $2.3 million based on the bid abstract. The contract duration is 210 calendar days after Notice to Proceed, structured in two phases: 120 days for material procurement and 90 days for on-site construction. Work will be performed at the 117th Air Refueling Wing, Sumpter Smith National Guard Base, located at 5401 East Lake Blvd, Birmingham, Alabama, with strict requirements including government escort, Foreign Object Debris prevention protocols, and limited work hours during Air National Guard normal working hours Tuesday through Friday from 0700-1730. Contractors must comply with subcontracting limitations under FAR clause 52.219-14, ensuring no more than 85% of the contract amount is paid to non-similarly situated subcontractors.
Notice text
4 versions
Update #4 · Latest ·
OF-1419 Bid Abstract
Request for Information 22 Aug 2025
Pre-bid slides and Roster 12 Aug 2025
Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of two new full power jet blast deflectors, sized to accommodate full engine run-ups for the KC-135 aircraft. The project will include but not be limited to the construction of new concrete paving systems, the relocation of existing flight line security lighting pole, and the relocation of flight line fuel system emergency shutoff controls.
The work is required at the117th Air Refueling Wing, Sumter Smith National Guard Base, 5401 East Lake Blvd, Birmingham Alabama, 35217.
The contract duration is 210 calendar days after Notice to Proceed. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236220 which equates to a size standard of $45,000,000.00.
Project magnitude is between $1,000,000 and $5,000,000.
The date for the pre-bid conference is August 12, 2025, 10:00 am local time, the location to be provided in the solicitation.
Interested contractors are highly encouraged to attend the pre-bid conference and shall follow conference registration and base access requirements shown in the solicitation.
A site visit will follow the pre-bid conference.
All questions for the pre-bid conference must be submitted by August 26, 2025, at 12:00 PM local time via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil .
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will not have sole source/brand name items.
Update #3 ·
Request for Information 22 Aug 2025
Pre-bid slides and Roster 12 Aug 2025
Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of two new full power jet blast deflectors, sized to accommodate full engine run-ups for the KC-135 aircraft. The project will include but not be limited to the construction of new concrete paving systems, the relocation of existing flight line security lighting pole, and the relocation of flight line fuel system emergency shutoff controls.
The work is required at the117th Air Refueling Wing, Sumter Smith National Guard Base, 5401 East Lake Blvd, Birmingham Alabama, 35217.
The contract duration is 210 calendar days after Notice to Proceed. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236220 which equates to a size standard of $45,000,000.00.
Project magnitude is between $1,000,000 and $5,000,000.
The date for the pre-bid conference is August 12, 2025, 10:00 am local time, the location to be provided in the solicitation.
Interested contractors are highly encouraged to attend the pre-bid conference and shall follow conference registration and base access requirements shown in the solicitation.
A site visit will follow the pre-bid conference.
All questions for the pre-bid conference must be submitted by August 26, 2025, at 12:00 PM local time via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil .
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will not have sole source/brand name items.
Update #2 ·
Pre-bid slides and Roster 12 Aug 2025
Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of two new full power jet blast deflectors, sized to accommodate full engine run-ups for the KC-135 aircraft. The project will include but not be limited to the construction of new concrete paving systems, the relocation of existing flight line security lighting pole, and the relocation of flight line fuel system emergency shutoff controls.
The work is required at the117th Air Refueling Wing, Sumter Smith National Guard Base, 5401 East Lake Blvd, Birmingham Alabama, 35217.
The contract duration is 210 calendar days after Notice to Proceed. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236220 which equates to a size standard of $45,000,000.00.
Project magnitude is between $1,000,000 and $5,000,000.
The date for the pre-bid conference is August 12, 2025, 10:00 am local time, the location to be provided in the solicitation.
Interested contractors are highly encouraged to attend the pre-bid conference and shall follow conference registration and base access requirements shown in the solicitation.
A site visit will follow the pre-bid conference.
All questions for the pre-bid conference must be submitted by August 26, 2025, at 12:00 PM local time via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil .
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will not have sole source/brand name items.
Update #1 ·
Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of two new full power jet blast deflectors, sized to accommodate full engine run-ups for the KC-135 aircraft. The project will include but not be limited to the construction of new concrete paving systems, the relocation of existing flight line security lighting pole, and the relocation of flight line fuel system emergency shutoff controls.
The work is required at the117th Air Refueling Wing, Sumter Smith National Guard Base, 5401 East Lake Blvd, Birmingham Alabama, 35217.
The contract duration is 210 calendar days after Notice to Proceed. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236220 which equates to a size standard of $45,000,000.00.
Project magnitude is between $1,000,000 and $5,000,000.
The date for the pre-bid conference is August 12, 2025, 10:00 am local time, the location to be provided in the solicitation.
Interested contractors are highly encouraged to attend the pre-bid conference and shall follow conference registration and base access requirements shown in the solicitation.
A site visit will follow the pre-bid conference.
All questions for the pre-bid conference must be submitted by August 26, 2025, at 12:00 PM local time via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil .
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with FAR 36.211(b), the following information is provided:
- The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
- Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
This project will not have sole source/brand name items.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construct Blast Fence | Award Notice | |
| This notice | Solicitation | |
| Construct Blast Fence | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Airfield Blast Shield | Global Strike Command | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity