BRKR072012 Addendum No. 1 SIGNED.pdf

PDF 847 KB Posted

Attached to
Construct Blast Fence
Solicitation number
W50S6M-25-B-A011
Issued by

About this file

This document is an Addendum for the ADAL Blast Fence Project, issued by Seay, Seay & Litchfield, P.C. on 26 August 2025. The addendum is for the 117th Air Refueling Wing Alabama National Guard project located in Birmingham, AL, with project number ANG#: BRKR 072012. The addendum revises drawing sheet M002, dated 20 August 2025, with key modifications including updated code references, design loads, soil lateral pressure assumptions, and geotechnical design recommendations. Specific changes include revised footing dimensions, added over-excavation and lean concrete backfill at foundation bearing conditions, and additional rear strut anchor bolts. The document is addressed to CMSgt. Kevin Hall and signed digitally by David Donovan.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEAY, SEAY & LITCHFIELD, P.C.

1115 S. COURT ST. MONTGOMERY, AL 36104

(334) 263-5162

MAIL@SSLARCH.COM

WWW.SSLARCH.COM

MONTGOMERY DOTHAN AUBURN HUNTSVILLE

The drawings and specifications for the ADAL Blast Fence Project, dated April 2025 are amended as follows. Where there are conflicts between the plans and specifications, previously issued addendum, and this addendum, this addendum shall govern.

Where drawing revisions are included, drawing revisions are indicated within revision clouds.

ITEM NO. 1: Delete drawing sheet M002 and replace it with the attached drawing sheet M002 with a are revised date of 20 August 2025. Drawing revisions included, but are not limited to:

- Updated code references and corresponding design loads.

- Updated design assumptions for soil lateral pressure and static friction coefficient to align with geotechnical report.

- Revised footing width, thicknesses, depths, and reinforcing steel to coordinate with geotechnical recommendations and updated code requirements.

- Added over excavation and backfill with lean concrete at foundation bearing conditions.

- Additional rear strut anchor bolts.

END OF ADDENDUM

ADDENDUM #: 001

DATE: 26 August 2025

TO: CMSgt. Kevin Hall

FROM: David Donovan PROJECT NAME: ADAL Blast Fence

PROJECT NUMBER: ANG#: BRKR 072012 / SS&L#: 18098.00

2025-08-27T20:45:24-0500
David Donovan

File details come from the government source that posted it. Updated .