Concrete Epoxy Pad Covering
Closed Solicitation Posted
- Solicitation number
- FA2823-25-Q-A030
- Agency
-
Air Force Test Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238390 Other Building Finishing Contractors
- PSC
- 5680 Miscellaneous Construction Materials
- Place of performance
- Eglin AFB, Florida 32542, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Test Center at Eglin Air Force Base, Florida is seeking competitive quotes for concrete epoxy pad covering services for Building 9509. The procurement involves interior floor refinishing of approximately 2,200 square feet of concrete flooring using a high-performance epoxy primer and finish system, excluding the server room. The scope includes surface preparation through commercial diamond grinding, application of General Polymer 3579 Epoxy Primer and 3746 Epoxy finish coats, removal and reinstallation of resilient cove base, and filling expansion joints with RS-88 Polyurea joint filler. Evaluation will be conducted on a best value basis considering technical capability, price, past performance, and Supplier Performance Risk System (SPRS) compliance, with award going to the lowest-priced, responsible offeror meeting all requirements. The original quote deadline was August 25, 2025, but has been extended to September 11, 2025 at 12:00 PM CST, with questions due by September 3, 2025.
This solicitation is set aside exclusively for small businesses under NAICS code 238390 (Other Building Finishing Contractors). No incumbent contractors or potential award values are specified in the available documentation. The work will be performed at Eglin Air Force Base, Florida, specifically within a 2,535 square foot pre-engineered metal test facility that includes various functional spaces such as conference rooms, administrative areas, restrooms, mechanical room, break room, and communication room. The contract requires firm-fixed pricing with a 60-day price hold period, and the government will not accept refurbished or used equipment. All quotes must include technical descriptions, CAGE codes, company information, and comply with Davis-Bacon Act wage requirements with a General Maintenance Worker wage determination of $28.67 plus 42.9% fringe benefits.
Notice text
3 versions
Update #3 · Latest ·
Concrete Epoxy Pad Covering; Please see attached SOW for additional details
Q&A WILL BE POSTED BY COB TODAY
PICTURES AND FLOOR PLAN ATTACHED
Update #2 ·
Concrete Epoxy Pad Covering; Please see attached SOW for additional details
Q&A WILL BE POSTED BY COB TODAY
Update #1 ·
Concrete Epoxy Pad Covering; Please see attached SOW for additional details
Files
| File | Type | Posted |
|---|---|---|
| QUESTIONS AND ANSWERS EPOXY FLOORING .pdf | ||
| CONCRETE EXPOXY PICS.pdf | ||
| FLOOR PLAN CONCRETE EPOXY.pdf | ||
| COMBO_SGT_Redacted.pdf | ||
| COMBO.pdf | ||
| (1)COMBO_Redacted.pdf | ||
| SOW V2_Redacted.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Fire apparatus intercom system uplift and installation | Air Force Test Center | Total Small Business | |
| Protective Coatings Requirements Contract | Air Mobility Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity