Comprehensive Everglades Restoration Program Biscayne Bay Coastal Wetlands - Phase I Project, L-31 Flow-way Pump Station S-709, Miami-Dade County, Florida

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EP20R0002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Miami, Florida, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for the Comprehensive Everglades Restoration Program Biscayne Bay Coastal Wetlands - Phase I Project in Miami-Dade County, Florida. Services include building Pump Station S-709 on the L-31E canal to pump up to 40 cubic feet per second of water from the C-103 canal into the L-31E canal using two 20 cubic feet per second submersible pumps. Additional requirements include installing precast concrete, sheet piles, a 60-inch HDPE culvert with slide gate, controls building, pumps, and performing excavation, backfilling, grading and landscaping. Proposals are due February 14, 2020. Award will be made based on technical acceptability and lowest price to a responsible contractor.

The project has no set-aside designations. The primary NAICS code is 237990 and PSC code is W912. Construction is valued between $5-10 million and shall be completed within 365 calendar days of the notice to proceed while meeting all technical requirements. Performance will be in Miami, Florida.

Notice text

The Biscayne Bay Coastal Wetlands Phase 1 project includes construction activities associated with the construction of one electric powered pump station designated as S-709. S-709 is a 40 cfs pump station located north of the C-103 canal on the L-31E canal. S-709 will pump water from the C-103 canal and discharge to the north into the L-31E canal using (2) 20 cfs submersible pumps. Pump station S-709 will also have a sixty inch culvert with a slide gate to pass flows during emergencies when the pump station is not operable.
The pump station consist of sheet pile headwalls and wingwalls, with precast concrete intake boxes that are placed in the wet between the sheet pile headwalls. Flowable fill is placed between the precast boxes and sheet pile headwalls. A precast concrete deck is positioned over the precast boxes and concrete cap. In water construction utilizing divers will be necessary, because dewatering is difficult due to the local geology and high conductivity. The pump station has a trash rack on the intake side and flap gates on the discharge side.

The culvert consists of a 60 inch HDPE diameter pipe that will be encased by flowable fill placed 
underwater. The culvert headwalls are precast concrete placed in the wet and grouted between two  steel king piles. A stainless steel slide gate is mounted to the headwall and is operated by an  electric actuator. Controls will be located in a standalone precast concrete building located 
adjacent to the pump station structure.

Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, 
concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, HDPE 
culvert, slide gate, precast control building, pumps, pump platform, pump station controls, 
electrical work, lighting, lightning protection, fencing.

Construction activities also include excavation, backfilling, stockpiling, clearing and grubbing, 
grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone. 
Construction activities also includes installation of stilling wells, stilling well platforms, 
staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams.
 

Files

File Type Posted
W912EP20R0002 Amendment 0004.pdf PDF
W912EP20R0002_Amendment 0003.pdf PDF
W912EP20R0002 Amendment 0002.pdf PDF
Amendment 0001, W912EP20R0002.pdf PDF
20R0002 Attendance Roster.pdf PDF
W912EP20R0002 GDR.pdf PDF
W912EP20R0002 Plans.pdf PDF
W912EP20R0002 Vol 2.pdf PDF
W912EP20R0002 Vol 1.pdf PDF

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Kissimmee River Restoration (KRR) Project, S-69 Weir Repair Okeechobee, Florida, United States · NAICS 237990 ENDIST Jacksonville No set-aside