This federal solicitation requests construction services for the Comprehensive Everglades Restoration Program Biscayne Bay Coastal Wetlands - Phase I Project, L-31 Flow-way Pump Station S-709 in Miami-Dade County, Florida. The scope of work includes building a 40 cfs electric pump station with two 20 cfs submersible pumps, a 60-inch HDPE culvert with slide gate, precast concrete intake boxes and deck, sheet pile walls, concrete piles, controls building, electrical work, and site work such as excavation and sodding. Services will be provided on-site in wet conditions requiring underwater construction using divers. The Army Corps of Engineers is the contracting agency, with responses due 15 to 30 calendar days after award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EP20R0002
Jacksonville District
Comprehensive Everglades Restoration Program
Biscayne Coastal Wetlands – Phase 1 Project
L-31E Flow-way Pump Station S-709
Miami-Dade County, Florida
Construction Solicitation and Specifications
Volume 2 of 2
See Volume 1 of 2 for Issue Date
CERP Biscayne Coastal Wetlands - Phase I Project L-31E Flow-Way Pump Station S-709
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
01 78 02 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 88 00 PUMP STATION COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES
DI VI SI ON 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00 CONCRETE REINFORCING
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 39 00 CONCRETE CURING
03 45 33 PRECAST STRUCTURAL CONCRETE
DI VI SI ON 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 50 15 CIVIL WORKS FABRICATIONS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DI VI SI ON 09 - FI NI SHES
09 97 02 PAINTING: COAL TAR EPOXY SYSTEM
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 23 PRECAST CONCRETE BUILDINGS
DI VI SI ON 22 - PLUMBI NG
PROJECT TABLE OF CONTENTS Page 1
22 14 01 DISCHARGE PIPE AND APPURTENANCES
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 14 01 PUMP STATION INSTRUMENTATION AND CONTROL PANELS
25 31 01 STRUCTURE REMOTE TERMINAL UNIT (RTU)
DI VI SI ON 26 - ELECTRI CAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 INSULATED WIRE AND CABLE
26 28 00 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 01 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE
26 35 33 POWER FACTOR CORRECTION EQUIPMENT
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 56 13 LIGHTING POLES AND STANDARDS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 74 INTERIOR FIRE DETECTION AND ALARM SYSTEM
DI VI SI ON 31 - EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 23 23 CONTROLLED LOW STRENGTH MATERIAL (CLSM, FLOWABLE FILL)
31 41 16 STEEL SHEET PILING
31 62 13 PRESTRESSED CONCRETE PILES
31 62 16 STEEL H-PILES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 15 00 LIMEROCK
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 16 SLIDE GATES AND ELECTRIC MOTOR ACTUATORS
35 21 02 STAFF GAUGES - CONCRETE PILE MOUNTED
35 31 19 STONE PROTECTION FOR STRUCTURES
35 41 00 LEVEE CONSTRUCTION
35 45 02 SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
AC1178.txt
AC1178 ***********************************************************************
AC1178 DESIGNATION - F 61 1
AC1178 PID - AC1178
AC1178 STATE/COUNTY- FL/MIAMI-DADE
AC1178 COUNTRY - US
AC1178 USGS QUAD - ARSENICKER KEYS (1997)
AC1178
AC1178 *CURRENT SURVEY CONTROL
AC1178 ______________________________________________________________________
AC1178* NAD 83(1986) POSITION- 25 27 47. (N) 080 20 49. (W) SCALED
AC1178* NAVD 88 ORTHO HEIGHT - 2.174 (meters) 7.13 (feet) ADJUSTED
AC1178 ______________________________________________________________________
AC1178 GEOID HEIGHT - -25.338 (meters) GEOID12B AC1178 DYNAMIC HEIGHT - 2.170 (meters) 7.12 (feet) COMP AC1178 MODELED GRAVITY - 978,968.0 (mgal) NAVD 88
AC1178
AC1178 VERT ORDER - SECOND CLASS 0
AC1178
AC1178.The horizontal coordinates were scaled from a topographic map and have AC1178.an estimated accuracy of +/- 6 seconds.
AC1178.
AC1178.The orthometric height was determined by differential leveling and AC1178.adjusted by the NATIONAL GEODETIC SURVEY AC1178.in June 1991.
AC1178
AC1178.Significant digits in the geoid height do not necessarily reflect accuracy.
AC1178.GEOID12B height accuracy estimate available here.
AC1178
AC1178.The dynamic height is computed by dividing the NAVD 88 AC1178.geopotential number by the normal gravity value computed on the AC1178.Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 AC1178.degrees latitude (g = 980.6199 gals.).
AC1178
AC1178.The modeled gravity was interpolated from observed gravity values.
AC1178
AC1178; North East Units Estimated Accuracy AC1178;SPC FL E - 125,290. 265,670. MT (+/- 180 meters Scaled)
AC1178
AC1178_U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNJ656163(NAD 83)
AC1178
AC1178 SUPERSEDED SURVEY CONTROL
AC1178
AC1178 NGVD 29 (??/??/92) 2.640 (m) 8.66 (f) ADJ UNCH 2 0
AC1178
AC1178.Superseded values are not recommended for survey control.
AC1178
AC1178.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums.
AC1178.See file dsdata.txt to determine how the superseded data were derived.
AC1178
AC1178_MARKER: Z = SEE DESCRIPTION
AC1178_SETTING: 36 = SET IN A MASSIVE STRUCTURE
AC1178_SP_SET: BRIDGE
AC1178_STAMPING: F 61 1 (DC)
AC1178_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
AC1178
AC1178 HISTORY - Date Condition Report By
AC1178 HISTORY - UNK MONUMENTED FL-025
AC1178 HISTORY - 1970 GOOD NGS
AC1178 HISTORY - 1989 GOOD USPSQD
AC1178 HISTORY - 19901230 GOOD USPSQD
AC1178 HISTORY - 20050824 GOOD WEIDEN
AC1178 HISTORY - 20150410 GOOD WANTGP
AC1178
SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS
SECTION 00 31 21 Page 1
AC1178.txt
AC1178 STATION DESCRIPTION
AC1178
AC1178'DESCRIBED BY NATIONAL GEODETIC SURVEY 1970
AC1178'9.2 MI SE FROM PRINCETON.
AC1178'ABOUT 4.0 MILES EAST ALONG COCONUT PALM DRIVE FROM THE
AC1178'INTERSECTION OF U.S. HIGHWAY 1 AT PRINCETON, THENCE 5.25 MILES
AC1178'SOUTH ALONG A GRAVELED ROAD, SET ON THE TOP OF THE NORTH WALKWAY
AC1178'OF A BRIDGE OVER A CANAL (NORTH CANAL), 17 FEET NORTH OF THE
AC1178'CENTER LINE OF NORTH CANAL DRIVE, NEAR THE MAIN ENTRANCE TO THE
AC1178'HOMESTEAD BAY FRONT PARK, 2 FEET WEST OF THE EAST END OF THE
AC1178'BRIDGE WALKWAY AND 1 FOOT ABOVE THE LEVEL OF THE ROAD.
AC1178'NOTE-- MARK MAY BE REACHED BY GOING 7.8 MILES EAST ALONG PALM
AC1178'DRIVE FROM THE INTERSECTION OF U.S. HIGHWAY 1 AT FLORIDA CITY,
AC1178'THENCE 1.1 MILES NORTH ALONG A GRAVELED ROAD TO INTERSECTION
AC1178'OF NORTH CANAL DRIVE AND MARK ON LEFT.
AC1178
AC1178 STATION RECOVERY (1989)
AC1178
AC1178'RECOVERY NOTE BY US POWER SQUADRON 1989 (TD)
AC1178'RECOVERED IN GOOD CONDITION.
AC1178
AC1178 STATION RECOVERY (1990)
AC1178
AC1178'RECOVERY NOTE BY US POWER SQUADRON 1990 (LEM)
AC1178'RECOVERED IN GOOD CONDITION.
AC1178
AC1178 STATION RECOVERY (2005)
AC1178
AC1178'RECOVERY NOTE BY WEIDENER SURVEYING AND MAPPING 2005
AC1178'RECOVERED IN GOOD CONDITION.
AC1178
AC1178 STATION RECOVERY (2015)
AC1178
AC1178'RECOVERY NOTE BY WANTMAN GROUP INC 2015 (JM)
AC1178'RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 2
AC1180.txt
AC1180 ***********************************************************************
AC1180 DESIGNATION - R 725
AC1180 PID - AC1180
AC1180 STATE/COUNTY- FL/MIAMI-DADE
AC1180 COUNTRY - US
AC1180 USGS QUAD - ARSENICKER KEYS (1997)
AC1180
AC1180 *CURRENT SURVEY CONTROL
AC1180 ______________________________________________________________________
AC1180* NAD 83(1986) POSITION- 25 28 13. (N) 080 20 49. (W) SCALED
AC1180* NAVD 88 ORTHO HEIGHT - 1.603 (meters) 5.26 (feet) ADJUSTED
AC1180 ______________________________________________________________________
AC1180 GEOID HEIGHT - -25.347 (meters) GEOID12B AC1180 DYNAMIC HEIGHT - 1.600 (meters) 5.25 (feet) COMP AC1180 MODELED GRAVITY - 978,967.4 (mgal) NAVD 88
AC1180
AC1180 VERT ORDER - SECOND CLASS 0
AC1180
AC1180.The horizontal coordinates were scaled from a topographic map and have AC1180.an estimated accuracy of +/- 6 seconds.
AC1180.
AC1180.The orthometric height was determined by differential leveling and AC1180.adjusted by the NATIONAL GEODETIC SURVEY AC1180.in June 1991.
AC1180
AC1180.Significant digits in the geoid height do not necessarily reflect accuracy.
AC1180.GEOID12B height accuracy estimate available here.
AC1180
AC1180.The dynamic height is computed by dividing the NAVD 88 AC1180.geopotential number by the normal gravity value computed on the AC1180.Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 AC1180.degrees latitude (g = 980.6199 gals.).
AC1180
AC1180.The modeled gravity was interpolated from observed gravity values.
AC1180
AC1180; North East Units Estimated Accuracy AC1180;SPC FL E - 126,100. 265,670. MT (+/- 180 meters Scaled)
AC1180
AC1180_U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNJ656171(NAD 83)
AC1180
AC1180 SUPERSEDED SURVEY CONTROL
AC1180
AC1180 NGVD 29 (??/??/92) 2.068 (m) 6.78 (f) ADJ UNCH 2 0
AC1180
AC1180.Superseded values are not recommended for survey control.
AC1180
AC1180.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums.
AC1180.See file dsdata.txt to determine how the superseded data were derived.
AC1180
AC1180_MARKER: Z = SEE DESCRIPTION
AC1180_SETTING: 36 = SET IN A MASSIVE STRUCTURE
AC1180_SP_SET: BRIDGE ABUTMENT
AC1180_STAMPING: R 725 DC
AC1180_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
AC1180_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
AC1180+SATELLITE: SATELLITE OBSERVATIONS - May 03, 2010
AC1180
AC1180 HISTORY - Date Condition Report By
AC1180 HISTORY - UNK MONUMENTED FL-025
AC1180 HISTORY - 1970 GOOD NGS
AC1180 HISTORY - 1989 GOOD USPSQD
AC1180 HISTORY - 19901230 GOOD USPSQD
AC1180 HISTORY - 20050824 GOOD WEIDEN
SECTION 00 31 21 Page 3
AC1180.txt
AC1180 HISTORY - 20060901 GOOD INHURC
AC1180 HISTORY - 20100503 GOOD GPI
AC1180 HISTORY - 20150410 GOOD WANTGP
AC1180
AC1180 STATION DESCRIPTION
AC1180
AC1180'DESCRIBED BY NATIONAL GEODETIC SURVEY 1970
AC1180'8.7 MI SE FROM PRINCETON.
AC1180'ABOUT 4.0 MILES EAST ALONG COCONUT PALM DRIVE FROM THE
AC1180'INTERSECTION OF U.S. HIGHWAY 1 AT PRINCETON, THENCE 4.7 MILES
AC1180'SOUTH ALONG A GRAVELED ROAD, SET ON THE TOP OF THE WEST END OF
AC1180'THE SOUTH CONCRETE ABUTMENT FOR THE FLOOD CONTROL GATES OVER
AC1180'MOWRY CANAL, 2.3 FEET NORTHWEST OF THE SOUTHWEST CORNER OF THE
AC1180'HURRICANE FENCE AROUND THE GATES, 2.3 FEET EAST OF THE WEST
AC1180'END OF THE ABUTMENT, 18 1/2 FEET WEST OF THE CENTER LINE OF A
AC1180'ROAD AT SOUTH ENTRANCE TO GATES FOR FLOOD CONTROL GATES AND LEVEL
AC1180'WITH THE GROUND.
AC1180
AC1180 STATION RECOVERY (1989)
AC1180
AC1180'RECOVERY NOTE BY US POWER SQUADRON 1989 (TD)
AC1180'RECOVERED IN GOOD CONDITION.
AC1180
AC1180 STATION RECOVERY (1990)
AC1180
AC1180'RECOVERY NOTE BY US POWER SQUADRON 1990 (LEM)
AC1180'RECOVERED IN GOOD CONDITION.
AC1180
AC1180 STATION RECOVERY (2005)
AC1180
AC1180'RECOVERY NOTE BY WEIDENER SURVEYING AND MAPPING 2005
AC1180'RECOVERED IN GOOD CONDITION.
AC1180
AC1180 STATION RECOVERY (2006)
AC1180
AC1180'RECOVERY NOTE BY INTERNATIONAL HURRICANE CENTER 2006 (WRV)
AC1180'RECOVERED IN GOOD CONDITION.
AC1180
AC1180 STATION RECOVERY (2010)
AC1180
AC1180'RECOVERY NOTE BY GREENMAN PEDERSEN INCORPORATED 2010 (KAW)
AC1180'RECOVERED IN GOOD CONDITION.
AC1180
AC1180 STATION RECOVERY (2015)
AC1180
AC1180'RECOVERY NOTE BY WANTMAN GROUP INC 2015 (JM)
AC1180'RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 4
AC1181.txt
AC1181 ***********************************************************************
AC1181 DESIGNATION - R 724
AC1181 PID - AC1181
AC1181 STATE/COUNTY- FL/MIAMI-DADE
AC1181 COUNTRY - US
AC1181 USGS QUAD - ARSENICKER KEYS (1997)
AC1181
AC1181 *CURRENT SURVEY CONTROL
AC1181 ______________________________________________________________________
AC1181* NAD 83(1986) POSITION- 25 29 21. (N) 080 20 48. (W) SCALED
AC1181* NAVD 88 ORTHO HEIGHT - 1.624 (meters) 5.33 (feet) ADJUSTED
AC1181 ______________________________________________________________________
AC1181 GEOID HEIGHT - -25.363 (meters) GEOID12B AC1181 DYNAMIC HEIGHT - 1.621 (meters) 5.32 (feet) COMP AC1181 MODELED GRAVITY - 978,971.0 (mgal) NAVD 88
AC1181
AC1181 VERT ORDER - SECOND CLASS 0
AC1181
AC1181.The horizontal coordinates were scaled from a topographic map and have AC1181.an estimated accuracy of +/- 6 seconds.
AC1181.
AC1181.The orthometric height was determined by differential leveling and AC1181.adjusted by the NATIONAL GEODETIC SURVEY AC1181.in June 1991.
AC1181
AC1181.Significant digits in the geoid height do not necessarily reflect accuracy.
AC1181.GEOID12B height accuracy estimate available here.
AC1181
AC1181.The dynamic height is computed by dividing the NAVD 88 AC1181.geopotential number by the normal gravity value computed on the AC1181.Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 AC1181.degrees latitude (g = 980.6199 gals.).
AC1181
AC1181.The modeled gravity was interpolated from observed gravity values.
AC1181
AC1181; North East Units Estimated Accuracy AC1181;SPC FL E - 128,190. 265,690. MT (+/- 180 meters Scaled)
AC1181
AC1181_U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNJ656192(NAD 83)
AC1181
AC1181 SUPERSEDED SURVEY CONTROL
AC1181
AC1181 NGVD 29 (??/??/92) 2.089 (m) 6.85 (f) ADJ UNCH 2 0
AC1181
AC1181.Superseded values are not recommended for survey control.
AC1181
AC1181.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums.
AC1181.See file dsdata.txt to determine how the superseded data were derived.
AC1181
AC1181_MARKER: Z = SEE DESCRIPTION
AC1181_SETTING: 36 = SET IN A MASSIVE STRUCTURE
AC1181_SP_SET: BRIDGE ABUTMENT
AC1181_STAMPING: R 724 DC
AC1181_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
AC1181_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
AC1181+SATELLITE: SATELLITE OBSERVATIONS - May 03, 2010
AC1181
AC1181 HISTORY - Date Condition Report By
AC1181 HISTORY - UNK MONUMENTED FL-025
AC1181 HISTORY - 1970 GOOD NGS
AC1181 HISTORY - 20050824 GOOD WEIDEN
AC1181 HISTORY - 20100503 GOOD GPI
AC1181 HISTORY - 20150410 GOOD WANTGP
SECTION 00 31 21 Page 5
AC1181.txt
AC1181
AC1181 STATION DESCRIPTION
AC1181
AC1181'DESCRIBED BY NATIONAL GEODETIC SURVEY 1970
AC1181'7.4 MI SE FROM PRINCETON.
AC1181'ABOUT 4.0 MILES EAST ALONG COCONUT PALM DRIVE FROM THE
AC1181'INTERSECTION OF U.S. HIGHWAY 1 AT PRINCETON, THENCE 3.4 MILES
AC1181'SOUTH ALONG A GRAVELED ROAD SET ON THE TOP OF THE NORTH ABUTMENT
AC1181'FOR THE FLOOD CONTROL GATE ACROSS MILITARY CANAL, 26 FEET SOUTH
AC1181'OF THE NORTHWEST CORNER OF THE HURRICANE FENCE AROUND THE FLOOD
AC1181'CONTROL GATE, 2.4 FEET EAST OF THE WEST END OF THE ABUTMENT,
AC1181'1.8 FEET WEST OF THE WEST FENCE LINE AROUND THE GATE AND LEVEL
AC1181'WITH THE GROUND.
AC1181
AC1181 STATION RECOVERY (2005)
AC1181
AC1181'RECOVERY NOTE BY WEIDENER SURVEYING AND MAPPING 2005
AC1181'RECOVERED IN GOOD CONDITION.
AC1181
AC1181 STATION RECOVERY (2010)
AC1181
AC1181'RECOVERY NOTE BY GREENMAN PEDERSEN INCORPORATED 2010 (KAW)
AC1181'RECOVERED IN GOOD CONDITION.
AC1181
AC1181 STATION RECOVERY (2015)
AC1181
AC1181'RECOVERY NOTE BY WANTMAN GROUP INC 2015 (JM)
AC1181'RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 6
AC2018.txt
AC2018 ***********************************************************************
AC2018 DESIGNATION - R 722
AC2018 PID - AC2018
AC2018 STATE/COUNTY- FL/MIAMI-DADE
AC2018 COUNTRY - US
AC2018 USGS QUAD - PERRINE (1994)
AC2018
AC2018 *CURRENT SURVEY CONTROL
AC2018 ______________________________________________________________________
AC2018* NAD 83(1986) POSITION- 25 31 07. (N) 080 20 50. (W) SCALED
AC2018* NAVD 88 ORTHO HEIGHT - 1.624 (meters) 5.33 (feet) ADJUSTED
AC2018 ______________________________________________________________________
AC2018 GEOID HEIGHT - -25.363 (meters) GEOID12B AC2018 DYNAMIC HEIGHT - 1.621 (meters) 5.32 (feet) COMP AC2018 MODELED GRAVITY - 978,980.0 (mgal) NAVD 88
AC2018
AC2018 VERT ORDER - SECOND CLASS 0
AC2018
AC2018.The horizontal coordinates were scaled from a topographic map and have AC2018.an estimated accuracy of +/- 6 seconds.
AC2018.
AC2018.The orthometric height was determined by differential leveling and AC2018.adjusted by the NATIONAL GEODETIC SURVEY AC2018.in June 1991.
AC2018
AC2018.Significant digits in the geoid height do not necessarily reflect accuracy.
AC2018.GEOID12B height accuracy estimate available here.
AC2018
AC2018.The dynamic height is computed by dividing the NAVD 88 AC2018.geopotential number by the normal gravity value computed on the AC2018.Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 AC2018.degrees latitude (g = 980.6199 gals.).
AC2018
AC2018.The modeled gravity was interpolated from observed gravity values.
AC2018
AC2018; North East Units Estimated Accuracy AC2018;SPC FL E - 131,450. 265,620. MT (+/- 180 meters Scaled)
AC2018
AC2018_U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNJ655225(NAD 83)
AC2018
AC2018 SUPERSEDED SURVEY CONTROL
AC2018
AC2018 NGVD 29 (??/??/92) 2.089 (m) 6.85 (f) ADJ UNCH 2 0
AC2018
AC2018.Superseded values are not recommended for survey control.
AC2018
AC2018.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums.
AC2018.See file dsdata.txt to determine how the superseded data were derived.
AC2018
AC2018_MARKER: Z = SEE DESCRIPTION
AC2018_SETTING: 36 = SET IN A MASSIVE STRUCTURE
AC2018_SP_SET: ABUTMENT
AC2018_STAMPING: R 722 DC BM
AC2018_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
AC2018_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
AC2018+SATELLITE: SATELLITE OBSERVATIONS - May 03, 2010
AC2018
AC2018 HISTORY - Date Condition Report By
AC2018 HISTORY - UNK MONUMENTED FL-025
AC2018 HISTORY - 1970 GOOD NGS
AC2018 HISTORY - 1987 GOOD USPSQD
AC2018 HISTORY - 1989 GOOD USPSQD
AC2018 HISTORY - 20100503 GOOD GPI
SECTION 00 31 21 Page 7
AC2018.txt
AC2018 HISTORY - 20150410 GOOD WANTGP
AC2018
AC2018 STATION DESCRIPTION
AC2018
AC2018'DESCRIBED BY NATIONAL GEODETIC SURVEY 1970
AC2018'5.4 MI SE FROM PRINCETON.
AC2018'ABOUT 4.0 MILES EAST ALONG COCONUT PALM DRIVE FROM THE INTERSECTION
AC2018'OF U.S. HIGHWAY 1 AT PRINCETON, THENCE 1.35 MILES SOUTH ALONG
AC2018'A GRAVELED ROAD, SET ON THE TOP OF THE WEST END OF THE NORTH
AC2018'CONCRETE ABUTMENT FOR A LARGE FLOOD CONTROL GATE, ABOUT IN LINE
AC2018'WITH THE EXTENDED LINE OF MOODY DRIVE LEADING WESTERLY, 1.2 FEET
AC2018'WEST OF A HIGH HURRICANE FENCE AROUND THE FLOOD GATES, 30.5 FEET
AC2018'SOUTH OF THE SOUTH GATE POST AT NORTH ENTRANCE TO GATES, 2.2 FEET
AC2018'EAST OF THE WEST END OF THE ABUTMENT AND ABOUT LEVEL WITH THE
AC2018'FLOORING ACROSS FLOOD GATES. IN SECTION 32 OR 33, R 40 E, T 56 S.
AC2018
AC2018 STATION RECOVERY (1987)
AC2018
AC2018'RECOVERY NOTE BY US POWER SQUADRON 1987 (LEM)
AC2018'RECOVERED IN GOOD CONDITION.
AC2018
AC2018 STATION RECOVERY (1989)
AC2018
AC2018'RECOVERY NOTE BY US POWER SQUADRON 1989 (TD)
AC2018'RECOVERED IN GOOD CONDITION.
AC2018
AC2018 STATION RECOVERY (2010)
AC2018
AC2018'RECOVERY NOTE BY GREENMAN PEDERSEN INCORPORATED 2010 (KAW)
AC2018'RECOVERED IN GOOD CONDITION.
AC2018
AC2018 STATION RECOVERY (2015)
AC2018
AC2018'RECOVERY NOTE BY WANTMAN GROUP INC 2015 (JM)
AC2018'RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 8
AC2019 (002).txt
AC2019 ***********************************************************************
AC2019 DESIGNATION - R 721 2
AC2019 PID - AC2019
AC2019 STATE/COUNTY- FL/MIAMI-DADE
AC2019 COUNTRY - US
AC2019 USGS QUAD - PERRINE (1994)
AC2019
AC2019 *CURRENT SURVEY CONTROL
AC2019 ______________________________________________________________________
AC2019* NAD 83(1986) POSITION- 25 31 19. (N) 080 20 49. (W) SCALED
AC2019* NAVD 88 ORTHO HEIGHT - 1.778 (meters) 5.83 (feet) ADJUSTED
AC2019 ______________________________________________________________________
AC2019 GEOID HEIGHT - -25.362 (meters) GEOID12B AC2019 DYNAMIC HEIGHT - 1.775 (meters) 5.82 (feet) COMP AC2019 MODELED GRAVITY - 978,980.7 (mgal) NAVD 88
AC2019
AC2019 VERT ORDER - SECOND CLASS 0
AC2019
AC2019.The horizontal coordinates were scaled from a topographic map and have AC2019.an estimated accuracy of +/- 6 seconds.
AC2019.
AC2019.The orthometric height was determined by differential leveling and AC2019.adjusted by the NATIONAL GEODETIC SURVEY AC2019.in June 1991.
AC2019
AC2019.Significant digits in the geoid height do not necessarily reflect accuracy.
AC2019.GEOID12B height accuracy estimate available here.
AC2019
AC2019.The dynamic height is computed by dividing the NAVD 88 AC2019.geopotential number by the normal gravity value computed on the AC2019.Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 AC2019.degrees latitude (g = 980.6199 gals.).
AC2019
AC2019.The modeled gravity was interpolated from observed gravity values.
AC2019
AC2019; North East Units Estimated Accuracy AC2019;SPC FL E - 131,820. 265,640. MT (+/- 180 meters Scaled)
AC2019
AC2019_U.S. NATIONAL GRID SPATIAL ADDRESS: 17RNJ656229(NAD 83)
AC2019
AC2019 SUPERSEDED SURVEY CONTROL
AC2019
AC2019 NGVD 29 (??/??/92) 2.243 (m) 7.36 (f) ADJ UNCH 2 0
AC2019
AC2019.Superseded values are not recommended for survey control.
AC2019
AC2019.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums.
AC2019.See file dsdata.txt to determine how the superseded data were derived.
AC2019
AC2019_MARKER: Z = SEE DESCRIPTION
AC2019_SETTING: 36 = SET IN A MASSIVE STRUCTURE
AC2019_SP_SET: ABUTMENT
AC2019_STAMPING: R 721-2 DC BM
AC2019_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL
AC2019_SATELLITE: THE SITE LOCATION WAS REPORTED AS NOT SUITABLE FOR
AC2019+SATELLITE: SATELLITE OBSERVATIONS - July 21, 2010
AC2019
AC2019 HISTORY - Date Condition Report By
AC2019 HISTORY - UNK MONUMENTED FL-025
AC2019 HISTORY - 1970 GOOD NGS
AC2019 HISTORY - 1987 GOOD USPSQD
AC2019 HISTORY - 20100721 GOOD INDIV
AC2019
SECTION 00 31 21 Page 9
AC2019 (002).txt
AC2019 STATION DESCRIPTION
AC2019
AC2019'DESCRIBED BY NATIONAL GEODETIC SURVEY 1970
AC2019'5 MI SE FROM PRINCETON.
AC2019'ABOUT 4.0 MILES EAST ALONG COCONUT PALM DRIVE FROM THE INTERSECTION
AC2019'OF U.S. HIGHWAY 1 AT PRINCETON, THENCE 1.05 MILE SOUTH ALONG
AC2019'A GRAVELED ROAD, AT AN EAST-WEST ROAD INTERSECTION, SET ON THE
AC2019'TOP OF THE SOUTH END OF THE WEST CONCRETE ABUTMENT OF A BRIDGE
AC2019'OVER A NORTH-SOUTH CANAL, 26 1/2 FEET WEST OF THE APPROXIMATE
AC2019'CENTER OF THE CANAL, 10 1/2 FEET SOUTH OF THE CENTER LINE OF
AC2019'THE BRIDGE AND LEVEL WITH THE BRIDGE FLOOR. IN SECTION 29 OR 32,
AC2019'R 40E, T 56 S.
AC2019
AC2019 STATION RECOVERY (1987)
AC2019
AC2019'RECOVERY NOTE BY US POWER SQUADRON 1987 (LEM)
AC2019'RECOVERED IN GOOD CONDITION.
AC2019
AC2019 STATION RECOVERY (2010)
AC2019
AC2019'RECOVERY NOTE BY INDIVIDUAL CONTRIBUTORS 2010
AC2019'RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 10
1. The below-stated water fluctuations are for informational purposes only and are not to be utilized in conjunction with any contract-related hydrographic surveying purposes as noted on the control drawing(s) of the contract plans. All elevations in Section 00 33 50 are in feet, National Geodetic Vertical Datum of 1929 (feet, NGVD).
2. The Biscayne Bay Coastal Wetlands (BBCW), Phase 1 L-31 East (L-31E) Flow Way, Contract 4 Project consists of three site locations. The first site is located in L-31E immediately north of the intersection of L-31E and Canal 103 (C-103). The second site is immediately north of the intersection of L-31E and Military Canal. The third site is immediately south and northeast of the intersection of Canal 102 (C-102) and L-31E.
All of these sites are in southeastern Miami-Dade County.
3. Water levels in the project area are affected by tidal fluctuation in the Atlantic Ocean, wind, rainfall, evaporation, local runoff, groundwater levels, and the operation of the Central and Southern Florida Project structures in the East Coast Canals.
4. Structure 20F (S-20F) is a reinforced concrete, gated spillway with discharge controlled by three vertical lift gates.
S-20F is located in the C-103 Canal immediately east of the intersection with L-31E and is approximately 2,000 feet from the Biscayne Bay shore. The purpose of this structure is to maintain desirable water control stages upstream in C-103. S-20F has two operating ranges in which to maintain the headwater elevation.
Selection of an operating range depends on field conditions and agricultural needs. For the high operating range, the automatic controls operate both gates simultaneously to maintain an optimum water level of 2.0 ft., NGVD above S-20F. When the headwater reaches 2.2 ft., NGVD, the gate opens to continuously pass up to the design discharge of 2900 cfs. When the headwater drops to 2.0 ft., NGVD the gates remain stationary until the HW again reaches 2.2 ft., NGVD or drops to 1.8 ft., NGVD at which time the gates begin to close. The gates continue to close until they are fully closed or until the HW again reaches 2.0 ft., NGVD when they once more remain stationary until reactivated by the rising or falling HW. In the low operating range, the automatic controls are operated as in the high range except that the optimum headwater elevation is 1.2 ft., NGVD and the “Gates open” and “Gates close” headwater elevations are 1.4 and 1.0 ft., NGVD respectively. S-20F passes the design flood (60 percent of the Standard Project Flood) without exceeding upstream flood design stage, and restricts downstream flood
SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA
SECTION 00 33 50 PAGE 1
stages and discharge velocities to non-damaging levels. S-20F also prevents salt water intrusion during periods of high flood tide.
5. Structure 20G (S-20G) is a reinforced concrete, gated spillway with discharge controlled by three vertical lift gates.
S-20G is located in the Military Canal at its intersection with L-31E which is approximately 1 mile north of S-20F. S-20G is approximately 3,000 feet from, the Biscayne Bay shore. S-20G maintains desirable water control stages upstream of S-20G during low flow periods, passes all discharges up to design capacity without exceeding desirable stages, restricts discharge during floods to that which will not cause damaging velocities or stages downstream, and prevents salt water intrusion into the canal. S-20G has two operating ranges in which to maintain the headwater elevation. Selection of an operating range depends on field conditions and agricultural needs. For the high operating range, the automatic controls operate both gates simultaneously to maintain an optimum water level of 2.0 ft., NGVD above S-20G.
When the headwater reaches 2.2 ft., NGVD the gate opens to continuously pass up to the design discharge of 900 cfs. When the headwater drops to 2.0 ft., NGVD the gates remain stationary until the headwater again reaches 2.2 ft., NGVD or drops to 1.8 ft., NGVD at which time the gates begin to close. The gates continue to close until they are fully closed or until the headwater again reaches 2.0 ft., NGVD when they once more remain stationary until reactivated by the rising or falling headwater.
In the low operating range, the automatic controls are operated as in the high range except that the optimum headwater elevation is 1.2 ft., NGVD and the “Gates open” and “Gates close” headwater elevations are 1.4 and 1.0 ft., NGVD respectively.
6. Structure 21A (S-21A) is in the C-102, immediately east of the intersection of L-31E and C-102. The structure is a reinforced concrete, gated spillway, with discharge controlled by two cable-operated vertical lift gates. Operation of the gates is in accordance with the seasonal operational criteria.
S-21A maintains optimum water control stages upstream of C-102 when sufficient water is available to maintain these optimum stages respectively. These optimum stages vary from 1.2 to 2.0
ft. NGVD; the gates of S-21A begin to open or close when the headwater reaches 0.2 feet above or below these optimum stages, respectively. Water levels can go above or below these elevations.
7. Structure 179 (S-179) in Mowry Canal (C-103) is located about 25 miles southwest of Miami and westerly and southerly of
SECTION 00 33 50 PAGE 2
Homestead Air Force Base. S-179 is a reinforced concrete, trapezoidal weir, with a U-shaped spillway and provided with automatically-controlled vertical lift gates and control house.
S-179 is a 2-bay structure. S-179 maintains desirable water control stages in C-103 upstream of S-179 during low flow periods, passes all discharges up to design capacity (1920 cfs) without exceeding desirable stages, and restricts discharge during floods to that which will not cause damaging velocities or stages downstream.
8. Historical S-20F headwater elevations for the period of record from May 31, 1985 through November 17, 2016, are provided in Figure 1. A maximum elevation of 2.94 ft., NGVD occurred on October 15, 1999.
9. Historical S-20G headwater elevations for the period of record from May 31, 1985 through November 17, 2016, are provided in Figure 2. A maximum elevation of 2.93 ft., NGVD was recorded on November 15, 1994.
10. Historical S-21A headwater elevations for the period of record from August 31, 1985 through November 17, 2016, are provided in Figure 3. A maximum elevation of 3.36 ft., NGVD was recorded on October 15, 1999.
11. It shall be the contractor's responsibility to obtain information concerning rain and wind. Reference is made to the National Oceanic and Atmospheric Administration (NOAA) publication entitled Local Climatological Data – Monthly Summary, which contains climatological and meteorological observations and data, including wind, rain, and temperature data for the project area. Subscription price and ordering information is available from the National Climatic Data Center, Federal Plaza, 151 Patton Avenue, Asheville, North Carolina 28801-5001. NOAA also has an internet information page at:
http://www.ncdc.noaa.gov/.
12. The climate in the project area is subtropical and humid.
The project area is subject to tropical storms and hurricanes from June through November and to windy and/or rainy weather during any time of the year. Temperatures below freezing are rare. May is generally a transitional month in which storms that typically occur in June through September may begin. The typical rainfall of October through May is associated with mid-latitude systems (fronts and low-pressure systems) and is distributed in a spatially uniform pattern. Typical June through September rainfall is closely associated with convective
SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA
SECTION 00 33 50 PAGE 3
http://www.ncdc.noaa.gov/ activity. These rainfall events are normally of short duration and amounts are quite variable spatially. Occasionally, daily rainfall during the typical rainfalls of October through May could be quite heavy as mid-latitude systems penetrate into Florida. Weather forecasts as well as actual rainfall information from the National Weather Service Miami-South Florida forecast office can be accessed at:
http://www.srh.noaa.gov/mfl/.
13. National Ocean Service tidal data for Station ID 8723214, VIRGINIA KEY, BISCAYNE BAY, FLORIDA can be found at the following website:
https://tidesandcurrents.noaa.gov
14. Temporary deviations from the operating criteria for the above structures can be conducted from time to time.
15. The following data are provided:
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK
DAYS BASED ON 5-DAY WORK WEEK
The average number of days in each calendar month with precipitation greater than, or equal to 0.5 inches is provided for the project area in the following table. This information is based on data obtained from station Royal Palm RS, located at latitude 25.3867 and longitude -80.5936. The data were obtained from Climatography of the United States No. 20 Monthly Station Climate Summaries for Florida, published by the National Climatic Data Center, NOAA, for the period of record 1981-2010.
The values in the table have been rounded.
Average Number of Days Per Month With Precipitation >= 0.5 Inches
Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Royal
Palm RS
SECTION 00 33 50 PAGE 4
Figure 1
0.5
1.5
2.5
3.5
-M ay
-8
-M ay -8
-M ay
-8
-M ay -8
-M ay
-8
-M ay -9
-M ay
-9
-M ay -9
-M ay
-9
-M ay -9
-M ay
-9
-M ay -9
-M ay
-9
-M ay -9
-M ay
-9
-M ay -0
-M ay
-0
-M ay -0
-M ay
-0
-M ay -0
-M ay
-0
-M ay -0
-M ay
-0
-M ay -0
-M ay
-0
-M ay -1
-M ay
-1
-M ay -1
-M ay
-1
-M ay -1
-M ay
-1
-M ay -1
E le va tio n (f
.t, N
G V
D
S-20F Headwater Elevation (May 31, 1985 through November 17, 2016)
A maximum headwater elevation of 2.94 ft, NGVD occurred on October 15, 1999.
SECTION 00 33 50 PAGE 5
Figure 2
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
-M ay
-8
-M ay -8
-M ay -8
-M ay -8
-M ay -8
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -9
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -0
-M ay -1
-M ay -1
-M ay -1
-M ay -1
-M ay -1
-M ay -1
-M ay -1
E le va tio n (f t., N
G V
D
S20G Headwater (May 31, 1985 through November 17, 2016)
A maximum headwater of
2.94 ft., NGVD occurred on November 15, 1994.
SECTION 00 33 50 PAGE 6
Figure 3
0.5
1.5
2.5
3.5
-A ug
-1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -1
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
-A ug -2
E le va tio n ft
, N G
V D
S-21A Headwater(August 31, 1985 through November 17, 2016)
A maximum headwater elevation of
3.36 ft, NGVD was recorded on October 15, 1999.
SECTION 00 33 50 PAGE 7
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Safety Requirements
1.2.4 Work Performed by Others
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 EXISTING WORK
1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
1.9.1 Schedule of Monthly Anticipated Adverse Weather Delays
1.9.2 Contractor Responsibility
1.10 UNITS OF MEASURE
1.11 SOUTH FLORIDA WATER MANAGEMENT DISTRICT
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for Central and South Florida Projects for Flood Control and Other Purposes, Biscayne Bay Coastal Wetlands Contract 4
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The Biscayne Bay Coastal Wetlands Phase 1 project includes construction activities associated with the construction of one electric powered pump station designated as S-709. S-709 is a 40 cfs pump station located north of the C-103 canal on the L-31E canal. S-709 will pump water from the C-103 canal and discharge to the north into the L-31E canal using (2) 20 cfs submersible pumps. Pump station S-709 will also have a sixty inch culvert with a slide gate to pass flows during emergencies when the pump station is not operable.
The pump station consist of sheet pile headwalls and wingwalls, with precast concrete intake boxes that are placed in the wet between the sheet pile headwalls. Flowable fill is placed between the precast boxes and sheet pile headwalls. A precast concrete deck is positioned over the precast boxes and concrete cap. In water construction utilizing divers will be necessary, because dewatering is difficult due to the local geology and high conductivity. The pump station has a trash rack on the intake side and flap gates on the discharge side. The culvert consists of a 60 inch HDPE diameter pipe that will be encased by flowable fill placed underwater. The culvert headwalls are precast concrete placed in the wet and grouted between two steel king piles. A stainless steel slide gate is mounted to the headwall and is operated by an electric actuator. Controls will be located in a standalone precast concrete building located adjacent to the pump station structure.
Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, HDPE culvert, slide gate, precast control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing. Construction activities also include excavation, backfilling, stockpiling, clearing and
SECTION 01 11 00 Page 2 grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone. Construction activities also includes installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams.
1.2.2 Location
The project is located in Biscayne National Park (BNP), Miami-Dade County, Florida on the L-31 East levee, southeast of Homestead Air Force Base.
The Contractor's access into the site will be through the C-103/(MOWRY DR) on the L-31E Biscayne Trail. The Contractor shall obtain access through South Florida Water Management District (SFWMD) gate by applying for a key permit at "http://my.sfwmd.gov/kpa/index.php". SFWMD point of contact is Ms. Ester A. Story at 561-682-2062. The Contractor is responsible for obtaining and complying with all requirements of State, County, and other jurisdictional agencies for permits and use.
1.2.3 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.4 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE
PROCEDURES.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1. The time for completion does not include establishment of grass. Grass shall be established not later than the time stated in the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1 plus the time stated for the establishment of grass as set forth in the paragraph "SOD ESTABLISHMENT" of Section 32 92 23 SODDING.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
SECTION 01 11 00 Page 3
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Channel Traffic in the project area consists of pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.
For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
SECTION 01 11 00 Page 4
1.6.2 Layout
From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all monuments, stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks or monuments are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor. The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or
SECTION 01 11 00 Page 5 adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.9 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
a. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.
b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.9.1 Schedule of Monthly Anticipated Adverse Weather Delays
The schedule of monthly anticipated adverse weather delays is based upon National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA to obtain MONTHLY
ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON 5-DAY WORK WEEK. A
reasonable number of anticipated weather delay work days is obtained from the average number of days per month (rounded to the nearest whole number) with precipitation greater than that indicated in Section 00 33 50
WEATHER, WATER STAGE AND TIDE DATA.
1.9.2 Contractor Responsibility
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA (rounded to the nearest whole number), the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Clause DEFAULT (FIXED PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.10 UNITS OF MEASURE
The standard U.S. system or the metric systems of measure may be utilized by the Contractor in the performance of his work. All survey records, official documentation, engineering data, and all correspondence, SECTION 01 11 00 Page 6 including any submittals and shop drawings, shall clearly denote which system of measure is being utilized, referenced or discussed. Any omission or inaccurate use of a unit of measure on the part of the Contractor shall not relieve him of his responsibilities under the contract terms. The unit of measure used in this specification is the standard U.S. system. The contract drawings denote both standard U.S.
system and metric system where appropriate. If no unit of measure is indicated on the drawing such as on ranges, stations, slope elevations, and distance numbers, then they are to be considered the standard U.S.
system.
1.11 SOUTH FLORIDA WATER MANAGEMENT DISTRICT
It is understood and agreed by the parties hereto that the project works being performed under this contract are for the benefit of the South Florida Water Management District, which agency, as the representative of the State of Florida, is responsible for acquisition of lands upon which the construction is to take place. This responsibility is pursuant to authorizing legislation of the Congress of the United States of America.
It is clearly understood that the project works to be constructed herein, upon completion, will be turned over to that agency for operation and maintenance as part of the Government's project agreement obligation.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
SECTION 01 11 00 Page 7
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEAS…