Comprehensive Everglades Restoration Program Biscayne Bay Coastal Wetlands - Phase I Project, L-31 Flow-way Pump Station S-709, Miami-Dade County, Florida
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912EP20R0002
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Miami-Dade Fl Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This notice seeks proposals for the construction of Pump Station S-709 as part of the Biscayne Bay Coastal Wetlands Phase 1 project in Miami-Dade County, Florida. The U.S. Army Corps of Engineers Engineering District Jacksonville will evaluate proposals based on technical acceptability of experience and past performance, as well as price, and award a contract to the lowest priced technically acceptable offeror. Proposals are due by December 20, 2019. The solicitation will be issued on November 20, 2019 via the Federal Business Opportunities website, and interested vendors must register there to receive any amendments.
There is no set-aside designation. The primary NAICS code is 237990 and the size standard is $39.5 million. The construction value is estimated between $3-8 million. The performance period is approximately 410 calendar days from notice to proceed. Work includes installation of precast concrete, sheet piles, culverts, pumps, controls, and other items to construct a 40 cfs pump station in the canal with a 60-inch bypass culvert.
Notice text
The Biscayne Bay Coastal Wetlands Phase 1 project includes construction activities associated with the construction of one electric powered pump station designated as S-709. S-709 is a 40 cfs pump station located north of the C-103 canal on the L-31E canal. S-709 will pump water from the C-103 canal and discharge to the north into the L-31E canal using (2) 20 cfs submersible pumps. Pump station S-709 will also have a sixty inch culvert with a slide gate to pass flows during emergencies when the pump station is not operable.
The pump station consist of sheet pile headwalls and wingwalls, with precast concrete intake boxes that are placed in the wet between the sheet pile headwalls. Flowable fill is placed between the precast boxes and sheet pile headwalls. A precast concrete deck is positioned over the precast boxes and concrete cap. In water construction utilizing divers will be necessary, because dewatering is difficult due to the local geology and high conductivity. The pump station has a trash rack on the intake side and flap gates on the discharge side. The culvert consists of a 60 inch HDPE diameter pipe that will be encased by flowable fill placed underwater. The culvert headwalls are precast concrete placed in the wet and grouted between two steel king piles. A stainless steel slide gate is mounted to the headwall and is operated by an electric actuator. Controls will be located in a standalone precast concrete building located adjacent to the pump station structure.
Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, HDPE culvert, slide gate, precast control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing. Construction activities also include excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone. Construction activities also includes installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams.
PROPOSAL REQUIREMENTS:
AWARD WILL BE MADE TO THE OFFEROR WHO SUBMITS THE LOWEST PRICED, TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL. PROPOSALS WILL BE EVAULATED BASED ON TECHNICAL ACCEPTABILITY (DEMONSTRATED EXPERIENCE AND PAST PERFORMANCE) AND PRICE.
The performance period is approximately 410 calendar days after Notice to Proceed (NTP).
NAICS Code 237990, size standard $39.5 million.
Magnitude of construction is between $3,000,000.00 and $8,000,000.00.
THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
The solicitation will be issued on or about 20 November 2019 and proposals will be due on or about 20 December 2019. Solicitation will be issued in electronic format only and will be posted on the Federal Business Opportunities website at http://www.fedbizopps.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Kissimmee River Restoration (KRR) Project, S-69 Weir Repair | ENDIST Jacksonville | No set-aside | |
| Mill Creek Section 205 Flood Risk Management Improvements | ENDIST Walla Walla | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity