CO FTBR Crystal Dam (1), East Portal Access Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF21B000004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Montrose CO 81401 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids for reconstruction and resurfacing work along 5.3 miles of the East Portal Access Road located in Montrose County, Colorado. The Bureau of Reclamation maintains this road and seeks to pulverize and overlay 5 miles of the existing pavement and reconstruct 0.3 miles. Major work items include roadway excavation, rock bolting, rock doweling, roadway aggregate, full depth reclamation, and asphalt concrete paving. Bids were due by April 6, 2021 to the Department of Transportation Federal Highway Administration and will be evaluated based on price.

There is no set-aside designation. The primary NAICS code is 237110 and PSC code R499. Oldcastle SW Group submitted the lowest bid of $4,772,896.26. Significant quantities include 14,500 cubic yards of roadway excavation. The East Portal Access Road provides access to Crystal Dam facilities located in Montrose, Colorado.

Notice text

2 versions

Update #2 · Latest ·

THIS IS AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE.

PROJECT DETAILS: CO FTBR Crystal Dam(1) East Portal Access Road

The East Portal Access Road is located in Montrose County, Colorado.  The road begins at the intersection with State Highway 347 at the entrance station to the Black Canyon National Park about 6 miles north of US-50. The road continues for 6.85 miles to the northeast where it terminates at the gate to the Crystal Dam facilities road.  The Bureau of Reclamation (BOR) maintains the road for access to its Crystal Dam and Power Plant and to the recreational facilities along the Gunnison River.  The 21-foot wide road was originally constructed in 1973 and has had no major maintenance projects other than a chipseal done in 2015.   The roadway pavement is generally in fair to poor condition. The road has been segmented into three sections based on priority and condition.  The upper section from mileposts 0.0 to 2.2, the middle section from mileposts 2.2 to 5.3 and the lower section from mileposts 5.3 to 6.8.   The middle section is characterized by steep grades of up to 16%, tall rock cuts (with rockfall problems), poor geometrics, and poor pavement conditions.  The focus of the project will be the first 5.3 miles.

The scope of the project would be to pulverize and overlay the pavement 5 miles and reconstruct 0.3 miles.  The major items of work will include paving, rock excavation (blasting) and rock removal (scaling), rockfall protection, cleaning the ditches and culverts, and full depth reclamation and paving.

SIGNIFICANT QUANTITIES:

Schedule A:

  • 20401-0000 Roadway Excavation: 14,500 CUYD
  • 26001-0000 Rock Bolt: 200 LNFT
  • 26002-000 Rock Dowel: 100 LNFT
  • 30202-2000 Roadway Aggregate, Method 2: 3,500 TON
  • 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth: 4.890 Mile
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 30,000 TON: 11,500 TON
  • 623032-0100 Special Labor, Slope Scaling: 150 Hours
  • 63401-0300 Pavement Markings, Type B, Solid (White): 110,000 LNFT
  • 63401-0300 Pavement Markings, Type B, Solid (Double Yellow): 110,000 LNFT
  • 65101-1000 Draped Rockfall Protection, Wire Mesh: 2,250 SQYD
  • 65101-2000 Draped Rockfall Protection, Cable Net: 5,000 SQYD

Anticipated Schedule

The anticipated advertisement date is April 2021.  Construction is anticipated from May 2021 to September 2021.

Funding

The estimated cost range is between $4.5 million and $5.5 million.

This will be a full and open competition.

Update #1 ·

THIS IS AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE.

PROJECT DETAILS: CO FTBR Crystal Dam(1) East Portal Access Road

The East Portal Access Road is located in Montrose County, Colorado.  The road begins at the intersection with State Highway 347 at the entrance station to the Black Canyon National Park about 6 miles north of US-50. The road continues for 6.85 miles to the northeast where it terminates at the gate to the Crystal Dam facilities road.  The Bureau of Reclamation (BOR) maintains the road for access to its Crystal Dam and Power Plant and to the recreational facilities along the Gunnison River.  The 21-foot wide road was originally constructed in 1973 and has had no major maintenance projects other than a chipseal done in 2015.   The roadway pavement is generally in fair to poor condition. The road has been segmented into three sections based on priority and condition.  The upper section from mileposts 0.0 to 2.2, the middle section from mileposts 2.2 to 5.3 and the lower section from mileposts 5.3 to 6.8.   The middle section is characterized by steep grades of up to 16%, tall rock cuts (with rockfall problems), poor geometrics, and poor pavement conditions.  The focus of the project will be the first 5.3 miles.

The scope of the project would be to pulverize and overlay the pavement 5 miles and reconstruct 0.3 miles.  The major items of work will include paving, rock excavation (blasting) and rock removal (scaling), rockfall protection, cleaning the ditches and culverts, and full depth reclamation and paving.

SIGNIFICANT QUANTITIES:

Schedule A:

  • 20401-0000 Roadway Excavation: 14,500 CUYD
  • 26001-0000 Rock Bolt: 200 LNFT
  • 26002-000 Rock Dowel: 100 LNFT
  • 30202-2000 Roadway Aggregate, Method 2: 3,500 TON
  • 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth: 4.890 Mile
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 30,000 TON: 11,500 TON
  • 623032-0100 Special Labor, Slope Scaling: 150 Hours
  • 63401-0300 Pavement Markings, Type B, Solid (White): 110,000 LNFT
  • 63401-0300 Pavement Markings, Type B, Solid (Double Yellow): 110,000 LNFT
  • 65101-1000 Draped Rockfall Protection, Wire Mesh: 2,250 SQYD
  • 65101-2000 Draped Rockfall Protection, Cable Net: 5,000 SQYD

Anticipated Schedule

The anticipated advertisement date is December/January 2020.  Construction is anticipated from March 2021 to November 2021.

Funding

The estimated cost range is between $4.5 million and $5.5 million.

This will be a full and open competition.

Files

Show all 15

Notice history

Notice Type Posted
CO FTBR Crystal Dam (1), East Portal Access Road Award Award Notice
This notice Latest solicitation Solicitation
CO FTBR Crystal Dam (1), East Portal Access Road Pre-Solicitation
CO FTBR Crystal Dam (1), East Portal Access Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors