QnA 4 1 2021.pdf

PDF 415 KB Posted

Attached to
CO FTBR Crystal Dam (1), East Portal Access Road
Solicitation number
6982AF21B000004
Issued by

About this file

This document contains details of a federal contract opportunity for construction services. The Bureau of Reclamation is soliciting bids for a project to repair and resurface 6.85 miles of the East Portal Access Road located in Montrose County, Colorado, which provides access to Crystal Dam facilities and recreational areas. Major work items include pulverizing and overlaying 5 miles of existing pavement, reconstructing 0.3 miles of roadway, rock excavation and scaling, rockfall protection, cleaning ditches and culverts, and full depth reclamation and paving. Significant quantities specified include 14,500 cubic yards of roadway excavation, 200 linear feet of rock bolts, 100 linear feet of rock dowels, 3,500 tons of roadway aggregate, 4.890 miles of full depth reclamation, and asphalt concrete pavement. Bids for the work must be submitted to the Department of Transportation Federal Highway Administration by the solicitation closing date listed on the front page of the solicitation number 6982AF21B000004.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CO FTBR Crystal Dam (1), East Portal Access Road

March 30, 2021

Questions Answers 1 We are requesting clarification of the special contract requirements-specifically 204.14:

Specification 205.08 has no requirements for processing-please clarify?

See Amendment A001

2 Can a site visit be arranged? The person to contact to see if this is possible is listed on page B-11 in the IFB.

April 1, 2021

Questions Answers 3 Question regarding section 205 Blasting, specifically page E-44, 205.08, use or presplitting to create a final face on all rock cuts 0.5:1 or steeper. It is easier to control the rock face by going steeper at 0.25:1 and appears the spec allows us to go steeper without approval; but would the CO consider doing away with the presplit requirement? Presplitting especially on 30" centers adds a significant amount of time and cost to the project where using controlled blasting or cushion blasting techniques for the final face, will not only achieve cleaner more natural looking results, as well, is more cost effective by allowing a more efficient blast pattern be laid out and fewer holes to be drilled along the final face, lessening the chance of borehole deviation and flyrock concerns.

No, the final excavated face must be presplit.

A value engineering proposal may be considered after contract award. See 52.248-3 Value Engineering -Construction clause.

Note: Definitions, including presplit, cushion and line drilling, are on page E-36, 205.02.