Chiller Replacement Roybal Campus

Closed Solicitation Posted

Solicitation number
75D301-26-R-73398
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Georgia 30329, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Centers for Disease Control and Prevention seeks design-build services to modernize Building 10's central chilled-water plant at its Roybal Campus in Atlanta, Georgia, with proposals due July 7, 2026, at noon. This is a Total Small Business set-aside.

Place of performance is Atlanta, Georgia. The scope includes replacing four existing 1,450-ton chillers with new 1,800-ton units (rated at 0.5742 kW/Ton full-load and 0.4682 kW/Ton NPLV efficiency), replacing nine cooling tower cells with eight new cells, replacing primary and condenser-water pumps with VFD-equipped units, upgrading medium and low-voltage electrical systems with dedicated breakers for each chiller, replacing refrigerant leak detection monitoring, integrating building automation system controls, and implementing water usage monitoring. All work must be executed in phases maintaining campus operations, with no more than two chillers removed from service simultaneously; full plant shutdown is limited to six days and cannot occur June through September. The contractor must complete design, construction, testing, commissioning, training, and closeout within 730 calendar days from Notice to Proceed, commencing within 10 calendar days of award.

The estimated project magnitude is between $15 million and $25 million on a firm-fixed-price, non-severable contract. Performance and payment bonds are required within 10 days of award. Davis-Bacon wage requirements apply. Eight key personnel positions—Project Executive, Project Manager, Design Manager, Site Superintendent, Quality Control Manager, Safety Manager, Lead Scheduler, and Commissioning Lead—are designated essential and cannot be replaced without Contracting Officer approval. A third-party commissioning agent with minimum ten years of central plant experience must verify the commissioning plan.

Evaluation weighs past performance as the most important non-price factor, followed by technical approach, organization and qualifications of the proposed team, and project schedule, with non-price factors significantly more important than price. The NAICS code is 238220, Plumbing, Heating, and Air-Conditioning Contractors; PSC is Z2AA, Repair Or Alteration Of Office Buildings. A mandatory site visit occurred May 19, 2026; questions were due May 27, 2026.

Notice text

3 versions

Update #3 · Latest ·

This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.

PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV

SITE VISIT: MAY 19TH @10AM 

Q&A's: MAY 27TH @12 PM

PROPOSAL: JUNE 17@ 10AM 

SECOND SITE VISIT IS SCHEDULED FOR 10 June @10 am Roybal Campus 

PROPOSAL DUE DATE EXTENDED TO: 7 July @ Noon

Update #2 ·

This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.

PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV

SITE VISIT: MAY 19TH @10AM 

Q&A's: MAY 27TH @12 PM

PROPOSAL: JUNE 17@ 10AM 

SECOND SITE VISIT IS SCHEDULED FOR 10 June @10 am Roybal Campus 

PROPOSAL DUE DATE EXTENDED TO: 24 June @ Noon 

Update #1 ·

This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.

PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV

SITE VISIT: MAY 19TH @10AM 

Q&A's: MAY 27TH @12 PM

PROPOSAL: JUNE 17@ 10AM 

Files

Show all 11

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Chiller Replacement Roybal Campus Pre-Solicitation
Chiller Replacement Roybal Campus Solicitation
Chiller Replacement Roybal Campus Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cooling Tower, Roofing, and Structural Construction District of Columbia 20024, United States · NAICS 236220 Bureau of Engraving and Printing Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors