Chiller Replacement Roybal Campus
Closed Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 75D301-26-R-73398
- Agency
- CDC Office of Acquisition Services Centers for Disease Control and Prevention, Department of Health and Human Services
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Atlanta, Georgia 30329, United States
- Points of contact
-
- Simi Khera hkhera@cdc.gov (770) 488-2710
Notice details come from SAM.gov. Updated .
About this opportunity
The Centers for Disease Control and Prevention (CDC) Office of Acquisition Services is soliciting design-build services for the modernization of Building 10's central chilled-water plant at the CDC Roybal Campus in Atlanta, Georgia. The scope of work includes replacing four existing 1,450-ton chillers with new 1,800-ton units, reducing nine cooling tower cells to eight new cells, upgrading primary and condenser-water pumps with variable frequency drive equipment, and performing comprehensive electrical and controls infrastructure improvements including medium-voltage and low-voltage upgrades and Building Automation System integration. Key requirements include phased execution that limits simultaneous chiller outages to no more than two units to maintain continuous campus operations, third-party commissioning by a sub-consultant with minimum ten years of central plant experience, and comprehensive design documentation at 30%, 60%, and 90% submittal phases. Proposals will be evaluated equally across four criteria (25% each): past performance, technical approach, team qualifications, and project schedule, with emphasis on demonstrated experience with central plant renovations in operational environments and federal government contracting. The proposal deadline is June 15, 2026, at 10:00 a.m. local time, with a mandatory site visit scheduled for May 6, 2026, and contract award anticipated within 30 days of fee proposal receipt.
This solicitation is designated as a Total Small Business set-aside, with no identified incumbent contractors. The contract will be firm-fixed-price with a single lump-sum line item and monthly progress-based payments, though no specific award value or budget range is disclosed in the solicitation documents. Construction must be completed within 462 calendar days of the Notice to Proceed, with work commencing within 10 calendar days of award and performance bonds required within 10 calendar days of award. Davis-Bacon prevailing wage requirements apply to the project, with rates established for DeKalb County, Georgia for various construction classifications including electricians, pipefitters, and laborers. The work will be performed at the CDC Roybal Campus in Atlanta, Georgia (30329), with all deliverables including as-built drawings, operation and maintenance manuals, and training videos required upon project completion.
Notice text
This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.
a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant.
b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances.
c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration.
d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement.
e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A.
f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
Attachments
| File | Type | Posted |
|---|---|---|
| A.1b Statement of Work.pdf | ||
| A.19 Visitor Request.docx | DOCX document | |
| 5 Contractor Employee Non-Disclosure Agreement.docx | DOCX document | |
| A.14 Wage Determination.pdf | ||
| A19 Solicitation.pdf | ||
| 4 Contractors Non-Disclosure Agreement.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Chiller Replacement Roybal Campus | Solicitation | |
| Chiller Replacement Roybal Campus | Pre-Solicitation | |
| Chiller Replacement Roybal Campus | Solicitation | |
| Chiller Replacement Roybal Campus | Pre-Solicitation |