Chapel Waterline Repair Bldg. 7148, JBER, AK

Closed Solicitation Posted

Solicitation number
FA500020Q0042
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Z1LB Maintenance Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Jber Ak 99506 USA

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Chapel Waterline Repair Bldg. 7148 - to construct a new water line by boring or excavating underneath Fighter Drive and connecting to 2 existing lines on Joint Base Elmendorf-Richardson (JBER-E), AK. The contractor shall provide all labor, personnel, equipment, tools, materials, transportation to accomplish constructing a new water line by boring or excavating underneath Fighter Drive and connecting to 2 existing lines IAW the SOW and Specs (Revised) dated 22 May 2020.

The purpose of Amendment 0002 is to provide a (Rev.) Statement of Work (SOW) dated 22 May 2020, extend the deadline to submit questions to 28 May 2020 NLT 11:00 AM AK Standard Time, Answers to submitted questions will be provided on 29 May 2020 NLT 12:00 PM AK Standard Time and extend the submission of Quotes due date to 5 June 2020 NLT 11:00 AM AK Standard Time. Quotes shall be submitted electronically to Cassandra Woodard at cassandra.woodard@us.af.mil and Anna Maria Smith at anna_maria.smith.1@us.af.mil

Update #2 ·

Chapel Waterline Repair Bldg. 7148 to construct a new water line by boring underneath Fighter Drive andconnecting to 2 existing lines on Joint Base Elmendorf-Richardson (JBER-E), AK. The contractor shall provide all labor, personnel, equipment, tools, materials, transportation to accomplish constructing a new water line by boring underneath Fighter Drive and connecting to 2 existing lines IAW the SOW and Specs (Revised) dated 15 May 2020.

A second Site Visit will be held 20 May 2020 at 0900 AM AK DT ( All interested parties are to meet in the parking lot of building 7137 on the corner of Fighter Dr. and Doo Little on JBER,AK. Submittal of questions are due 22 May 2020 by 10:00 AM AK DT. Answers to questions will be provided 25 May 2020. Quotes are to be submitted / due 27 May 2020 by 10:00 AM AK DT.

Update #1 ·

Chapel Waterline Repair Bldg. 7148 to construct a new water line by boring underneath Fighter Drive andconnecting to 2 existing lines on Joint Base Elmendorf-Richardson (JBER-E), AK. The contractor shall provide all labor, personnel, equipment, tools, materials, transportation to accomplish constructing a new water line by boring underneath Fighter Drive and connecting to 2 existing lines IAW the SOW.

Files

Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity