JBER

Joint Base Elmendorf-Richardson

ALASKA

FXSB 19-1095

Chapel Waterline Repairs Bldg. 7148

REV 5/14/2020

D E P A R T M E N T O F T H E A I R F O R C E

673 R D C I V I L E N G I N E E R S Q U A D R O N ( P A C A F )

J B E R A L A S K A 9 9 5 0 6

FXSB 19-1095

Chapel Waterline Repair Bldg 7148

SPECIFICATION INDEX

SECTION TITLE

01010 GENERAL CONDITIONS

01020 SCOPE OF WORK

01120 ENVIRONMENTAL PROTECTION/HAZARDOUS MATERIALS ON JBER

01121 MANAGEMENT OF HAZARDOUS WASTE ON JBER

01130 CONFINED SPACE ENTRY

01720 ASBUILT DRAWINGS

02200 EXCAVATION, TRENCHING AND BACKFILLING

02410 DEMOLITION

02600 HOT MIX ASPHALT

02605 CRUSHED AGGREGATE BASE COURSE

02610 TACK COAT

02650 PAVEMENT MARKINGS

02660 WATER LINES

02720 STORM DRAIN SYSTEM

03000 CONCRETE SIDEWALK, PADS, AND CURB AND GUTTERS

14000 OPERATION OF THE ON BASE GRAVEL EXTRACTION

Section 01010

Technical Provisions

01010-1

SECTION 01010

TECHNICAL PROVISIONS

GENERAL

1. PROJECT LOCATION

1.1 All work under this project will be performed on Joint Base Elmendorf-Richardson

(JBER). Work areas and limited access areas are shown on drawings.

2. NOTIFICATION OF WORK START

2.1 The Contractor shall give at least 10 working days advance notice in writing to the

Contracting Officer at 10480 Sijan Ave, Joint Base Elmendorf-Richardson (JBER) prior to beginning any work under the scope of this project.

2.2 Coordinate with appropriate utility locating agencies, including base communications cable maintenance (Item 1 through 19) of 673rd ABW Form 3 (Base Civil Engineer

Work Clearance Request). Form 3 will be given to the contractor during the pre-construction meeting. Contractor shall complete and follow all instructions on Form 3 before start of work in accordance with Wing Instructions (WI 32-1007) “Safeguarding

Utilities From Damage”. A copy of the Wing Instructions will be available to the contractor during the pre-construction meeting.

2.3 Contractor shall schedule a meeting time to meet with each utility agency at the work site to locate affected utilities.

2.4 Contractor shall maintain all marked utilities in the field once they are initially marked by each utility agency. If markings are damaged, contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the contractor, unless otherwise approved by the Contrcating Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average shop rate of

$35.00 per man-hour. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the contractor by placing stakes or transcribing the marks on a drawing.

When construction resumes, contractor shall re-mark the site and may request verification of utility locations at no additional cost to him (Off Base utility locates agencies might request additional cost for repeat locates).

2.5 Clearance request is not valid until signed by the approving officer (Block 23 of Form

3). Approving officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the approving officer’s signature, otherwise clearance request is invalid and a new

01010-2 request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.

2.6 The contractor is considered a “construction agency” for compliance with the provisions of WI 32-1007”.

3. WORK SCHEDULE

3.1 Work Hours: Work hours on this project shall be limited to Monday through Friday inclusive, between 0700 hours through 1700 hours, excluding federal holidays, unless approved otherwise in writing by the Contracting Officer. Should the Contractor desire to work other than these hours, Contractor must request approval of deviation in writing at least 72 hours prior to the period of the intended deviation. The Contractor shall not accomplish the deviation in work hours unless permitted to do so in writing by the

Contracting Officer.

4. FIRE AND SAFETY REGULATIONS

4.1 The Contractor shall comply with all latest national, state, local and Air Force fire and safety regulations. A copy of Air Force and Joint Base Elmendorf-Richardson (JBER) fire and safety regulations can be reviewed at the Contract Management Office, 673

Civil Engineer Squadron, Bldg 730 on JBER-Richardson.

4.2 Prior to using any open flame devices, welding equipment and other similar operations contractor and subcontractor personnel performing this type of work shall be certified to issue AF Form 592, USAF Welding, Cutting and Brazing Permit. Certification training is provided by appointment on Thursdays at 0800 and can be scheduled by contacting Technical Services at 384-5555. If permits are required for hot work prior to attendance in the certification class by contractor personnel, permits may be obtained through Construction Management. Compliance with the requirements set forth in

NFPA Standard No 241 (Building Construction and Demolition Operations), NFPA

51B, AFI 91-205, is mandatory.

4.3 Training of Contractor Employees: Contractor shall ensure that all Contractor employees, including the employees of subcontractors receive an initial fire reporting procedures briefing prior to beginning any work under the scope of this project. The

Contractor’s designated safety representative shall conduct this briefing. As new employees of the Contractor and subcontractor are added during completion of this project, the Contractor shall submit a written record of all of his/her employees and subcontractor employees receiving this briefing.

4.4 Contractor Fire Prevention Responsibility

4.4.1 The contractor shall provide a “firewatch” person during all welding performed on-base, which includes any welding work on heavy equipment anywhere on-base.

4.4.2 It is the inherent responsibility of the Contractor to practice good fire prevention measures while working on Elmendorf Air Force Base.

01010-3

4.4.2.1 When work is accomplished in/on structures, contract personnel will confine smoking to established/designated smoking area(s).

4.4.2.2 Flammable paints, oil, varnishes, etc., stored in inside storage shall be in a metal storage cabinet or in outside storage in a controlled area. Flammables being used outside of these areas are limited to a one day supply.

4.4.2.3 Temporary wiring must be in compliance with Article 305 of the National Electric

Code.

4.4.2.4 The Contractor will be responsible for notifying the base fire department and 673

CES Alarm shop prior to any alarm or sprinkler system shutdowns at least 48 hours in advance.

4.4.2.5 Welding, cutting or brazing will only be done after a valid AF Form 592 has been issued by an individual certified by the Base Fire Protection Flight to issue welding permits

4.4.2.6 Fire extinguishers required during construction will be supplied by the Contractor.

The contractor shall provide at least 2 operating fire extinguishers at the hot work location.

4.4.3 Questions concerning fire prevention can be referred to the Technical Services

Section at extension 384-5555.

5. RECORD DRAWINGS

5.1 Prepare record drawings using best quality contract prints to show all construction changes from the Contract Documents, redlined in a legible manner for reproduction by photocopy process.

5.2 Show any deviation from Contract Documents with reference to locations, sizes, methods and materials.

5.3 Each drawing of the entire set shall be marked in the large letters "RECORD

DRAWING" and dated.

5.4 Each drawing shall be corrected to reflect every amendment, modification and field change.

5.5 Mechanical drawings shall show to scale locations of all valves, cleanouts, covers, splice box covers, all outside underground utilities such as gas lines, electrical lines, etc., which do not have surface covers to clearly indicate their underground locations.

5.6 Conversion of Schematic Layouts

5.6.1 In most cases on the Drawings, arrangement of conduits and circuits, piping, ducts and other similar items are shown schematically, and are not intended to portray

01010-4 precise physical layout. Final physical arrangement shall, be as determined by the

Contractor, subject to the Contracting Officer's approval. However, design of future modifications of the facility may require accurate information as to the final physical arrangement of items and location of utilities, which are shown only schematically on the Drawings.

5.6.2 Show on the job set of Record Drawings, by dimension accurate to within 1" (25 mm), the centerline of each run of items such as described below. Clearly identify the item by accurate note such as "cast-iron drain", "galv. water pipe", etc. Show, by symbol or note, the vertical location of the item ("under slab", "in ceiling Plenum", "exposed", etc.). Make all identification sufficiently descriptive that it may be related reliably to the Specifications.

5.7 Deliver record drawings to Contracting Officer within 30 days after completion of the work on this task order

5.8 Requirements for record drawings shall be tailored to the specific project scope. The items indicated above are examples only and are not to be construed as all inclusive.

6. SAMPLING AND TESTING

6.1 Unless otherwise stated herein, or designated otherwise in writing by the Contracting

Officer, all required sampling and testing shall be by the Contractor at his own expense.

All tests shall be performed using specified testing procedures, or if no procedure is specified, the standard testing procedure used by the ASTM will be used. At least 24 hours prior to performing any testing, the Contractor shall notify the Contracting

Officer when such testing will be performed so that the test may be observed by the

Contracting Officer and/or his/her designated representatives. In addition to the specified testing requirements herein, the Government may perform additional verification testing at its own expense.

7. UTILITIES

7.1 Reasonable amounts of water, electricity and other available utilities will be furnished to the Contractor at no cost to the Contractor. The Contractor shall exercise strict conservation practices in the use of these utilities. Should the Contractor be found to be not using utility conservation practices, then the cost of this utility use will be passed along to the Contractor for the remaining performance period of the Contract.

Telephone services for Contractor use can be secured at the JBER Anchorage

Telephone Utility Office, 10492 Necrason Avenue, JBER, with the cost of the telephone service borne by the Contractor.

8. UTILITY OUTAGES

8.1 Scheduled Outages: Request for all outages and interruption of electricity or other utility services shall be made in writing to the Contracting Officer at least 14 working

01010-5 days and with a 24 hour confirmation notification. All outages are subject to approval, in writing, by the Contracting Officer and will be allowed only at the convenience of the Government. This notification shall be made prior to the utility outage and in sufficient time to give the utility personnel ample opportunity to arrange and schedule discontinuance of utility services. The Contractor shall hold all outages to a minimum number of shortest possible duration.

8.2 Unscheduled: Reimburse the US Government for man-hours, materials, and circuit cost when damage to or interruption of service on any cable occurs through negligence of the excavator/contractor, including any failure to obtain proper coordination of

Wing Form 3 prior to commencement of construction or excavation in accordance with paragraph 9.1 of this section.

9. CLEARANCE WORK REQUEST

9.1 Permit: Before any excavation, alteration or other construction work is begun, the

Contractor shall obtain and fully process a 673 Air Base Wing Form 3, Base Civil

Engineer Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information and sketches regarding any proposed excavation(s). Processing a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. Contractor shall expect two weeks to process this form, and during military exercises it could take longer. This form can be obtained from the Construction Management Office, 673

CES , Joint Base Elmendorf-Richardson (JBER), 730 Quartermaster Drive; it shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of the signed form shall be submitted to the Contracting Officer. Completion of WG Form 3 includes certifying compliance with institutional controls indicated by 673 CES/CEV, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.

9.2 On “Tuesdays and Thursdays” of every week from 1 April through 15 October, all CE shops with exception of the environmental section will be assembled in the HVAC

Break room located in the 773 CES compound at 5327 Kenney Avenue between 0800 and 1000. Contractors shall visit this CE “one stop shop” to schedule a locate.

Contractors shall bring a copy of their project site plan for CE shops to review. If a CE shop has a utility in the proposed construction area, utility locate will be scheduled. A shop will not sign off on the WG Form 3 until the locate is performed. If a shop does not have a utility in the construction area, their particular block on the form will be signed. CE shops have up to 72 hours to perform a locate. CE Environmental Flight has up to 3 days to process the permit. During the remainder of the year, contractors shall process the form by taking it to all shops. Emergency work is an exception;

contractors shall take the forms through the shops during any day of the week.

Contractors are still responsible for contacting the offices/agencies other than CE (on and off Base). The CE Construction Management Office’s and the Approving Officer’s

01010-6 signatures shall be the last signatures required.

9.3 Protection of Existing Utilities: The Contractor shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling in accordance with WI 32-1007 (Safeguarding Utilities From Damage).

Any damaged utilities caused by contractor’s negligence shall be repaired immediately at no additional cost to the government.

9.4 Contractor shall restore damaged communications cable(s) and circuits to original condition and full operation if any damage does occur. Notification of damage shall be made immediately to the Base Telephone Trouble desk, 552-4647, and to the

Contracting Officer; restoration efforts shall commence within 1 hour. Failure to commence restoration within the required time limit, or to make continuous progress toward restoration, or to complete acceptable restoration within a 4-hour time limit or an alternate time limit negotiated with and established by the Contracting Officer, shall result in suspension of all other contract work until acceptable restoration is completed and approved by the Contracting Officer.

9.4.1 In cases where a cable is damaged for reasons noted above, the Contractor shall, if lacking the qualified trades in his organization, employ as necessary such qualified trades or employ another Contractor having such trades to restore the cable and circuits to original condition and full operation at no expense to the Government.

9.4.2 The Government reserves the right to protect a damaged cable from further damage or deterioration and the right to restore priority circuits; these actions shall not relieve the

Contractor of his full responsibility for restoration.

10. WARRANTY STICKERS

10.1 All materials, equipment and other installations specifically designated within the

Contract to be covered by warranty or warranted by the manufacturer shall have an

Optional Form 274 affixed in a conspicuous space or forwarded to the Construction

Management Section, Base Civil engineer if attachment is not practical. The required forms will be made available to the Contractor in sufficient quantity by the Contracting

Officer. The forms shall be properly completed by the Contractor and shall be signed and dated by the Contractor in accordance with the applicable warranty provisions in effect at the time of the work.

11. CONTRACTOR'S USE OF PREMISES

11.1 This utility project will be constructed while facilities, which are using these services, will continue to be in use and occupied during the construction. The Contractor shall coordinate all work to minimize inconvenience to facility occupants and to airfield operations.

11.2 The Contractor shall be responsible for moving equipment required for access to complete the work.

01010-7

11.3 The Contractor shall take efforts to hold dust and noise to a minimum. Contractor shall comply with base quiet hours (2200 to 0600).

11.4 The Contractor shall not use traffic ways for storage areas unless granted permission to do so in writing by the Contracting Officer. At no time shall the Contractor block hallways, traffic ways, or other access areas.

12. ACCESS TO CONSTRUCTION SITE

12.1 Contracting Officer will designate access routes to the site as shown on the drawings, for use by Contractor and his work force.

12.2 Contractor will be responsible to maintain, repair, and restore existing work areas, which are used by him and his work force to the original conditions immediately prior to his commencement of work.

12.3 Employee parking shall be restricted to those areas so designated.

12.4 The Security Police will enforce traffic regulations, parking area assignments and security and the Contractor shall cooperate and coordinate to the fullest extent.

12.5 Contractor shall provide to the Contracting Officer, Security Police, and entry control personnel, 72-hour advance notice for each entry into restricted areas. Delays due to lack of providing the 72-hour notice to enter these areas shall be at the Contractor's expense.

13. CONTRACTOR'S STORAGE AREA

13.1 The Government will provide an outside area adjacent to the work area for Contractor's storage. The Contractor shall be required to maintain this area to the satisfaction of the

Government. The Contractor shall erect an approved temporary fence around this storage area. The fence shall be 6’ high chain link, screened with slats or fabric.

Submit fence plan for approval. The Government in no way will be responsible for the security of any items stored in this area. Contractor will return the area in the same condition as when he received it.

14. BARRICADES

14.1 Construct and maintain barricades as required by OSHA and Wing Safety personnel, sufficient to prevent injury to persons and damage to property.

14.2 Cover unattended trenches and holes.

14.3 Provide and maintain warning lights and signs, as necessary, to prevent damage or injury. Keep warning lights burning from dusk to dawn.

01010-8

15. COLD WEATHER OPERATIONS

15.1 If any part of this project is pursued during periods of cold or inclement weather, the

Contractor shall take all appropriate precautions to protect facilities and work involved in the project scope from damage by cold/or inclement weather.

16. NOT USED.

17. SUBMITTALS

17.1 Government review time for submittals will normally be 15 calendar days. Submittals with complicated mechanical or electrical items or submittals with a large number of items will require 20 calendar days review time.

17.2 Rejection of submittals for technical violations of the drawings or specifications will not be grounds for an extension of the performance period. If re-submittals are required, all parts of the original submittal package will be resubmitted together with changes so that coordination may be maintained.

17.3 All submittals will be submitted electronically via email with clearly marked tabs separating each item. Submittals will be consolidated by type (i.e. mechanical, electrical) and all submittals for each specification section will be submitted at the same time.

17.4 Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be submitted electronically via email. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the test to which the report applies. Certification shall not be construed as relieving the

Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

17.5 Submittals followed by the designation “G” are for Government approval. All other submittals shall be submitted to the Government for record purposes only. Submittals shall be reviewed and approved by the Contractor’s Quality Control personnel prior to submission to the Government.

18. CODES

18.1 References to standards, codes, specifications, recommendations and regulations refer to the latest edition/printing issued prior to the bid opening date.

18.2 These Construction Documents, and the joint and several phases of construction hereby contemplated are to be governed, at all times, by applicable provisions of the Federal

Law(s), including but not limited to, the latest amendments of the following:

01010-9

18.2.1 Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 91-596.

18.2.1.1 By agreement between the US Department of Labor, Occupational Safety and

Health Administration (OSHA) and State Department of Labor, Division of

Occupational Safety and Health (DOSH), applicable OSHA regulations as amended by the State of Alaska are enforced for Contractors and Contractor personnel only by DOSH. At no time will the level of protection afforded the worker be less than the most strict of either the Federal or State regulations.

18.2.1.2 Code of Federal Regulations, Title 29, Parts 1910 (Occupational Safety and Health

Standards) and 1926 (Safety and Health Regulations for Construction).

18.2.2 Federal Standard 313B, as it pertains to the procurement, identification, marking and control of potentially toxic or hazardous materials, and to the reporting of information concerning these materials.

18.2.3 Uniform building, mechanical and plumbing codes.

18.2.4 National Electric Code.

18.2.5 NFPA 101, Life Safety Code.

18.2.6 NFPA 30, Flammable and Combustible Liquids Code

18.3 Applicable portions of standards listed in the Specifications that are not in conflict with

Contract Documents or with the Federal Acquisition Regulations (FAR).

18.4 Any and all Air Force, 3rd Wing or Elmendorf Base Regulations as pertain to construction, safety, fire, health and associated activities are hereby made part of this

Specification.

18.5 Modifications or exceptions to standards shall be considered as amendments, and unmodified portions shall remain in full effect.

19. TECHNICAL SPECIFICATIONS

19.1 The Specifications have been partially "streamlined" and some words and phrases have been intentionally omitted. Missing portions shall be supplied by inference as with notes on drawings.

19.2 The words "approved", "inspected", "directed", "selected", and similar words and phrases shall be presumed to be followed by "by Contracting Officer". The words

"satisfactory", "submitted", "reported", and similar words or phrases shall be presumed to be followed by "to Contracting Officer".

19.3 Words like "install", "provide", "furnish", and "supply" shall be construed to include complete furnishing and installing or constructing unless modified by additional information.

01010-10

19.4 Instructions, directions and requirements as specified shall be considered to be followed by the phrase "unless otherwise specified or indicated".

20. GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT: None

21. SALVAGE

21.1 Equipment and materials indicated on the drawings or directed in the field for reuse shall be approved by the Contracting Officer before re-installation. Contract amount includes cleaning, conditioning and re-installing materials indicated for reuse.

21.2 Any excess equipment and materials selected to remain the property of the Government shall be removed by the Contractor and delivered to the Property Disposal Officer, 12745 Richardson Hwy, or as directed by the Contracting Officer.

22. DISPOSAL OF DEBRIS

22.1 Solid Wastes: Contractors will be required to dispose of all solid wastes generated by base projects at state permitted off-base sanitary landfill facilities.

22.1.1 All wastes including asbestos containing materials (ACM) will be disposed of in the

Hiland Waste Disposal Facility located near Hiland Road and the Glenn Highway.

22.1.1.1 Waste hauling from Joint Base Elmendorf-Richardson (JBER) to off-base disposal locations will meet or exceed all requirements and restrictions levied by the State of

Alaska and the Municipality of Anchorage, including:

22.1.1.1.1 Meeting of any weight restrictions for any public roadways utilized.

22.1.1.1.2 Covering and securing all loads of waste other than earth materials to ensure that no materials are lost from each load during transit.

22.1.1.1.3 Prevention of overloading with earth materials such that load contents are prevented from escaping during transit.

22.2 Liquid Wastes

22.2.1 Runoff and residues generated from any process including water-washing processes shall not be directly wasted to the sanitary sewer or to the storm drain system. They shall be collected, sampled and disposed of based on the results of the analysis of samples, compliance with EPA requirements and this specification.

23. HEALTH HAZARDS

23.1 Health Hazards: The Contractor shall comply with the following sections of this specification regarding the recognized health hazards – Section 01120 and 01121.

23.2 Confined Spaces: The Contractor shall comply with 29 CFR 1910.146 and AFI 91-203 for confined space procedures. Contractor shall coordinate with the 673 WG/SEG

01010-11

(Safety Office) to determine which spaces on Base are designated as confined spaces, and that any joint entry by Contractor and Air Force personnel must be coordinated by the Base Confined Space Entry Team (Safety, Bioenvironmental Engineering and Fire

Department).

24. ENVIRONMENTAL PROTECTION/HAZARDOUS MATERIALS

24.1 The Contractor shall strictly comply with Section 01120 of this specification for protection of personnel, Government property, and the environment, and for hazardous material handling, use and disposal.

25. HAZARDOUS WASTE

25.1 The Contractor shall strictly comply with Section 01121 of this specification for hazardous waste accumulation and disposal.

CONTRACTOR QUALITY CONTROL

26.1 The Contractor shall provide and maintain an effective quality control program that complies with the Clause of the Contract entitled "Inspection of Construction", (52.246-

12).

26.2 The Contractor shall establish a quality control system to perform and document sufficient inspections and tests of all items of work, including that of his subcontractors, to ensure conformance with applicable specifications and drawings with respect to the materials; procedures; workmanship; construction finish; functional performance; and specific compliance with all safety requirements concerning personnel, equipment, and the construction product. This control system will be established for all construction work performed. The Contractor's control system will specifically include but not be limited to the surveillance and tests required in the Technical Specifications of the contract specifications.

26.3 The Contractor's quality control system shall be adequate to cover all construction operations and should be keyed to the proposed construction sequence. The

Contractor's quality control system shall include three phases of inspection for all definable features of work as follows:

26.3.1 Preparatory Inspection: This shall be performed and documented prior to beginning work on any definable feature of construction. It shall include a review of the contract requirements; a check of all required shop drawings/ submittal data to ensure proper approval; a physical examination of materials/ equipment to ensure conformance with the approved shop drawings/submittal data and contract specifications and that all materials and/or equipment are on hand; a check to see that all material/equipment required to be tested, has been tested and the results submitted and approved; provisions have been made to provide required control testing, and an examination of work area has been made to ascertain completion of the preliminary work.

01010-12

26.3.2 Initial Inspection: This shall be performed and documented as soon as Work begins on a representative portion of a particular feature of work and shall include examination of the quality of workmanship as well as a review of control testing for compliance with contract requirements.

26.3.3 Follow-up Inspections: These shall be performed and documented daily to assure continuing compliance with contract requirements, including control testing, until completion of the particular feature of work.

26.4 This quality control program shall be implemented by the establishment of a quality control organization headed by one full time person who will be at the job site at all times construction is in progress and whose primary responsibility shall be quality control compliance with the contract plans and specifications. In addition to implementing and managing the QC Program, the QC Manager may perform the duties of Project Superintendent. This person must have at least a high school education with a minimum of five years of experience in construction and/or inspection of the type of work required by this contract. Other qualifications, i.e., degrees, general supervision, and experience will be considered. He shall be assisted by additional quality control personnel as required by the Technical Specifications and as otherwise necessary in order to fully implement the Contractor quality control system as specified. These additional personnel shall function primarily in the capacity of quality control and will report to the head of the quality control organization, who in turn will report directly to a level no lower than the Contractor's top field management.

26.5 The Contractor's quality control program shall provide for review and approval by him of shop drawing material as required by this Contract. The Contractor shall designate one individual who shall certify that each submittal has been reviewed in detail and that it is correct and in strict conformance with the contract drawings and specifications, except for where a specific request for deviation is being requested.

26.6 After the Contract is awarded and before construction operations are started, the

Contractor shall meet with the Contracting Officer, or his representative, and discuss quality control requirements. The meeting shall develop mutual understanding relative to details of the system including inspections, administration of the system, and the interrelationship of Contractor and Government inspection.

26.7 Material Submittal: Submission and approval of the Contractor's quality control plan.

26.7.1 A quality control plan shall be furnished to the Government by the Contractor in four copies within 20 calendar days after award or as specified on the AF Form 66. This plan shall include procedures, instructions, and reports to be used to provide adequate coverage for all quality control activities required by this contract, and to ensure quality construction in accordance with the plans and specifications. In addition, this plan shall include the following:

01010-13

26.7.1.1 Names, qualifications, and organization of personnel to be used for quality control.

Use submittal 1 "Appointment of Quality controller", attached at the end of this section.

26.7.1.2 Specific responsibilities and authority of each of the quality control personnel.

26.7.1.3 Test Program including names and qualifications of all independent test laboratories to be employed and the specific tests that each will perform. Other tests to be performed and the Contractor quality control personnel who will be responsible for each test will be listed. The test program will also include the method for prior approval of test procedures and equipment, and the methods used to calibrate the testing equipment and otherwise ensure the reliability of information obtained from the tests. Where a minimum number of tests is specified in the Technical

Specifications, additional tests may be required by the Contracting Officer to ensure the adequacy of the work at no additional cost to the Government.

26.7.1.4 Responsibilities and procedures for coordination and advance notice to the

Government for all inspections and test required to be witnessed by the

Government.

26.7.1.5 Forms for reporting and documenting all quality control activities. Responsibilities and procedures for reporting and documenting all quality control activities, to include deficiencies noted, correction of deficiencies, and re-testing or re-inspection of deficiencies.

26.7.1.6 The procedures to be followed for the receipt, storage, and handling of construction items to include the method of verifying that the items used are approved.

26.7.1.7 Copies of all letters of direction to the Contractor's representatives responsible for quality control, outlining their duties and responsibilities, signed by a responsible officer of the firm.

26.7.1.8 Any other specific requirements unique to the type of work as determined from a review of the contract documents.

26.7.2 When the Contractor proposes to make any changes in the CQC plan or implementation, during construction, he must notify the Contracting Officer in writing. Such change shall not be implemented prior to acceptance, in writing, by the

Contracting Officer. A legible copy of the accepted plan and any changes to the plan directed or accepted by the Government, will be kept available at the job site.

26.7.3 Unless specifically authorized by the Contracting Officer, no construction will be started until the Contractor's quality control plan is accepted. This is not to preclude commencing work as required by the Contract, which includes preparation and submission of specified plans, programs, registers, schedules, shop drawings, and pre-mobilization coordination, and otherwise establish intent to perform in a timely manner.

01010-14

26.8 All daily inspections and tests will be reported on an approved form. The Contractor's verification, as stated, must be contained on the Contractor's form. When completed by the quality control inspector, this report must contain enough information and in sufficient detail to provide complete documentation of all inspections and tests appropriate to each special and technical section of the specifications. These reports, including a record of deficiencies and corrective action taken, should be submitted to the senior project manager and a legible signed copy shall be furnished to the

Government daily no later than 1200 hours the first working day following the date which the report covers. Where his shop drawing review and approval is accomplished away from the job site, the Contractor may provide weekly summary reports of these activities in lieu of daily reports as required for all on-site quality control activities.

26.9 In addition to the qualifications contained in paragraph 26.3 above, the Contractor's quality control organization will have the capability of performing the following required functions.

26.9.1 Check materials at the site against Contract specifications and the "approved" shop drawings, which shall be maintained at the job site for the duration of the Contract.

26.9.2 Prepare and maintain current records of all quality control operations to include those of subcontractors.

26.9.3 Review and submit all required guarantees.

26.9.4 Monitor safety program for effectiveness and conformance with the Contract requirements and furnish documentation of deficiencies noted and corrected.

26.9.5 Report to the Government any discrepancies in plans and/or specifications.

26.10 The Contractor shall submit a listing of all current construction deficiencies to the

Contracting Officer at the time he makes a request for an acceptance inspection. The

Contracting Officer will determine whether to schedule an acceptance inspection based in part upon his review of this listing for accuracy and completeness.

26.11 In addition to the Contractor's quality control program, the Government may direct or perform such additional inspections and tests as considered necessary by the

Contracting Officer to ensure proper performance.

26.12 Should recurring deficiencies as determined by the Government indicate that the quality control system is not adequate or quality control reporting is sub-standard, corrective action shall be taken as directed by the Contracting Officer. This may require the assignment of additional full time quality control personnel or the removal and replacement of ineffective personnel. If deficiencies in the work performed indicate that the Contractor's quality control system does not produce the desired results, corrective actions in both the quality control system and the work will be taken by the

Contractor. In addition, the Contractor shall not build upon or conceal any defective work. If the Contractor does not promptly make the necessary corrections, the

Contracting Officer may issue a suspension of work, suspending all or part of the work

01010-15 until satisfactory corrective action has been taken.

27.0 DD FORM 1354: The contractor shall provide a completed Form 1354, Transfer and

Acceptance of Military Real Property, (reference Appendix). Form 1354 itemizes component costs for the construction of this project.

END OF SECTION

01010-16

SUBMITTAL 1

Appointment of Quality Controller:

(Name) is appointed as quality controller on project

FXSB 19-1095 Chapel Waterline Repairs Bldg. 7148 with the authority to regulate the quality of the work so that it conforms to the contract. The quality controller is authorized to order discontinuance of any operation causing non-conforming work.

The quality controller has at least 5 years prior experience in the supervision and inspection of systems similar to that required in this contract. The quality controller understands all requirements of these specifications.

Contractor's Signature

Printed or Typed Name

Printed or Typed Company

Date

I acknowledge receipt of this letter.

Quality Controller's Signature

Printed or Typed Name

Printed or Typed Company

Date

FXSB 19-1095

Chapel Waterline Repair Bldg 7148

SCOPE OF WORK

3/13/2020

Contractors are strongly encouraged to visit the site and get familiar with all the work related to the water line construction area prior to submitting a bid, to verify existing site condition and other information as noted in the scope of work and drawings, as well as to become familiar with the scope of work. Failure to visit the site does not relieve the Contractor from the responsibility of performing all work required to provide a complete and useable project in accordance with the Contract documents.

• Intent of this project is to construct a new water line by boring or excavating underneath Fighter Drive and connecting to 2 existing lines.

1. Excavate a pit where shown on the attached site plan, expose exiting 10” AC line. Cut and install new 10X10X8 Tee, one new 10 inch and one new 8 inch gate valve. Excavated pit shall be large enough to accommodate cutting the existing line and installing the new Tee/Valve. Maximum of 5 hours allowed to cut and install Tee/Valve (not including excavation time). 10 inch ductile iron pup will be used between existing 10 inch AC pipe, 10 inch gate valve and 10 inch tee.

2. Bore a new 8 inch HDPE SDR 11 water line underneath Fighter Drive to meet the existing 6 inch AC line across from the Chapel (Bldg. 7137). Horizontal ground distance is approximately 120 feet, but needs to be confirmed by contractor after reviewing the attached GeoBase Utility Map and on site conditions. New water line inside diameter must be a minimum of 6 inches.

3. Excavate and cut existing 6 inch AC pipe and connect new bored 8 inch HDPE SDR11 line to it.

4. Backfill pits and compact to prevent settlements in the spring. Backfill and compact at sidewalks and pavement sections to prevent settlements. Place 6 inch concrete sidewalks, concrete curb and gutters and 3 inch AC pavement.

5. At the contractor's option, the work may be accomplished by excavating the area required to perform the repair. Under this option all pipe parts will be ductile iron, and the contractor will be responsible for putting in place the necessary traffic control to direct traffic around the work site. Any dewatering required under this method will be the contractor's responsibility.

6. Water line isolation will be performed by the 773CES Water Shop.

7. For the water outage, Contractor shall give 5-days advance notice of intent to start work so occupants affected with water outage can be notified.

8. Traffic control plan with dates and alternate routing must be submitted 21 days prior to start of actual work to allow for proper processing.

9. JBER Work Clearance Permit (Dig permit) is required.

10. A Storm Water Pollution Prevention Plan (SWPPP) is not required for this project; however, best management practice must be followed to prevent sediments and other material from falling into the surrounding storm system inlets.

11. Water line work includes butt-fusing, fittings, flanges, reducers, tees, thrust blocks, restrains, dissimilar metals couplings, disinfecting, etc. to complete the installation of water lines, valves and to connect to existing lines.

12. If boring method is used, new water lines shall be High Density Polyethylene (HDPE) pipe, PE4710 polyethylene compounds that meet or exceed ASTM D3350 Cell Classification 445574; DR 11.0.

Connect HDPE to existing AC pipes with appropriate (HDPE manufacturer recommended) fittings.

13. All removed asphalt, curb/gutter and sidewalks in areas of excavation shall be replaced with new.

New pavement cross section shall be as follows: 3inches AC, 6 inches D-1 Base course in all areas where trench cuts into existing pavement. ADA compliant sidewalk ramps will be required where those existing sidewalk features are disturbed.

14. Contractor shall be aware that the existing pipe being replaced is Asbestos Cement (AC):

1. If the contractor cuts or damages the pipe while excavating and removal, he shall follow the asbestos abatement procedures. Where practicable the whole section of AC pipe should be removed without cutting or breaking at joints.

2. Work practices must be used that will minimize dust generation and/or dispersal. Any asbestos products to be cut must be thoroughly wetted down and cut with a low speed hand tool (e.g. hand saw). Upon completion, the entire work area of the task must be cleaned of all asbestos type waste. As many broken pieces as practicable shall be collected. Waste pieces are to be double bagged in heavy-duty plastic bags, which are to be labeled “ASBESTOS - FOR DISPOSAL”. All disposable clothing, respirators, respirator cartridges must also be included in these bags.

Section 01120 Environmental Protection / Hazardous Materials on JBER

01120-1

SECTION 01120

ENVIROMENTAL PROTECTION / HAZARDOUS MATERIALS ON JBER

1. APPLICABLE LAWS AND DIRECTIVES

The Contractor and all subcontractors, in performance of this contract, shall comply with all Federal, State and local laws, regulations, orders and ordinances concerning environmental quality and environmental pollution abatement and control. The contractor is responsible for any fine, penalty assessments and/or natural resources damage claims that are brought against JBER for those incidents determined by the Contracting Officer which are due to Contractor’s performance or failure to perform during the execution and performance of this contract.

1.1 TECHNICAL ASSISTANCE

Technical assistance for complex environmental problems will be coordinated with:

a. JBER Environmental Office, 673 CES/CEIEC 552-2440.

b. JBER Bioenvironmental Engineering, 673 AMDS/SGPB, 384-3985.

1.2 Work shall be accomplished within the guidance and limitations established by the following, based on the most current changes and amendments thereto:

1.2.1 Title 40, Code of Federal Regulations.

1.2.2 673 ABW Instructions.

2. PROTECTION OF LAND RESOURCES

2.1 GENERAL

The Contractor shall furnish all labor, materials and equipment required to protect environmental quality and prevent environmental pollution as a result of work performed in accordance and/or in violation of the Technical Provisions of these specifications. Environmental pollution is defined as any activities, actions or consequences of Contractor activity that produce an undesirable effect on the human environment, including environmental resources such as land, water, air or sound. Land and water resources within the project boundaries and any other location visited by the Contractor shall be preserved or referred to conditions existing prior to this contract. The Contractor shall confine construction activities to areas allowed by the plans and specifications.

2.2 EXISTING STRUCTURES AND UTILITIES

No excavation shall be performed until site utilities have been field located. The Contractor shall take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities, including monitoring wells and remediation systems, resulting from the Contractor’s operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without written approval from the Contracting Officer.

01120-2

2.3 LANDSCAPE PRESERVATION

The Contractor shall not remove, disturb, injure or destroy trees, shrubs or any other surface vegetation without written authority from the Contracting Officer.

2.2.1 The Contractor shall protect all trees adjacent to or within the contract work area which are not specifically designated for removal on the contract drawings.

Protection shall include erection of sturdy barriers installed at a minimum distance of 10’ from each tree. Barriers shall be maintained intact until all grading, construction and landscaping work are completed, with exception of such contouring as is required after removal of the barriers. All slopes shall be contoured by hand digging and hand raking to blend the protected areas into the final grade, after barrier removal.

2.3 Location of Temporary Field Offices and/or Storage Facilities: The Contractor shall obtain written permission from the Contracting Officer for locating any temporary office, storage or other buildings on Air Force controlled property. The Contractor shall request location of said facilities by submitting a letter and location drawing to the Contracting Officer. Any ground surface change or defacement caused by the location of said buildings shall be restored to the condition that existed before the contract by the Contractor, at no expense to the Government.

2.4 LANDFILL DISPOSAL

All non-regulated waste including asbestos materials shall be disposed in an off-base state approved site.

3. PROTECTION OF AIR QUALITY

3.1 EMMISIONS

Identify air pollution generating equipment or processes that may require federal, Alaska, or local permits under the Clean Air Act. Determine requirements based on any current installation permits and the impacts of the project. Provide a list of all fixed or mobile equipment, machinery or operations that could generate air emissions during the project to the Installation Environmental Office (673 CES/CEIEC, Air Program Manager, 384-1361 or 673CES.CEIEC.EnvCom@us.af.mil).

3.2 DUST

As required by 18 AAC 50.045(d), control fugitive dust emissions. Fugitive dust emissions (airborne dust generated by vehicles operating on unpaved surfaces, transfer or transport of dust producing materials, etc.) shall be controlled at the construction site, along haul routes and at staging areas. The Contractor shall be required to maintain all excavations and excavation activities, embankments, stockpiles, hauling activities and all other work areas free from airborne dust. Dust control shall be practiced as required for the term of the contract. The cost of any required dust control will be borne in full by the Contractor.

3.3 OPEN BURNING

The Contractor shall not engage in any burning activities on Air Force controlled properties.

01120-3

4. PROTECTION OF WATER QUALITY

4.1 SURFACE AND GROUND WATER

4.1.1 The Contractor shall not operate equipment or machinery in any stream or lake without written permission from the Contracting Officer.

4.1.2 The Contractor shall prevent the deposit of any materials (including earth fill, vegetative waste, oils and grease) into any stream or lake. Any such accidental deposit will be immediately reported to the Contracting Officer.

4.1.3 JBER’s storm water management plan stipulates that projects less than 1 acre in size that have the potential to discharge to JBER’s storm drain system or other waters of the US (e.g., streams, lakes, wetlands) are required to operate under an erosion and sediment control plan (ESCP). The ESCP must be submitted to the 673 CES/CEIEC Water Quality Program Manager for review prior to ground disturbance. The construction site operator is responsible for developing and following the ESCP.