About this opportunity
This solicitation seeks offers to stabilize the A3 Main Building at the Columbia Environmental Research Center in Columbia, Missouri. The Department of the Interior's U.S. Geological Survey Office of Acquisitions and Grants will award a firm-fixed price contract to structurally reinforce the building's foundation and perimeter in accordance with provided plans, specifications, and applicable regulations. Offerors must submit responses by the due dates specified in Amendments 1 through 7, and proposals will be evaluated based on technical merit and price.
The solicitation was initially set aside for small businesses but was later opened to all offerors. Work must be completed within 180 days of the notice to proceed. The NAICS code is 238110 and PSC code is R499. No incumbent was identified. The solicitation documents provide details on the building's existing conditions as well as the required demolition, excavation, foundation reinforcement by helical piles and micropiles, masonry and window repairs, roof replacement, and mechanical and electrical upgrades. Offerors are instructed to use the provided bid schedule template when submitting fixed prices by construction division for the base scope of work.
Notice text
6 versions
Update #6 · Latest ·
Amendment 007 extends to 5/2/2022
Amendment 006 posts Question and Answers
Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.
The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.
The magnitude of construction is between $500,000 and $1,000,000.
Update #5 ·
Amendment 006 posts Question and Answers
Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.
The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.
The magnitude of construction is between $500,000 and $1,000,000.
Update #4 ·
Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.
The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.
The magnitude of construction is between $500,000 and $1,000,000.
Update #3 ·
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.
The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.
The magnitude of construction is between $500,000 and $1,000,000.
Update #2 ·
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.
Update #1 ·
CERC A3 Main Building Stabilization
Attachments
Show all 23
Notice history
| Notice | Type | Posted |
|---|---|---|
| CERC A3 Main Building Stabilization | Award Notice | |
| CERC A3 Main Building Stabilization | Solicitation | |
| CERC A3 Main Building Stabilization | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity