CERC A3 Main Building Stabilization

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140G0121R0030
Agency
Office of Acquisitions and Grants US Geological Survey, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238190 Other Foundation, Structure, and Building Exterior Contractors
PSC
Z1AZ Maintenance Of Other Administrative Facilities And Service Buildings

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers to stabilize the A3 Main Building at the Columbia Environmental Research Center in Columbia, Missouri. The Department of the Interior's U.S. Geological Survey Office of Acquisitions and Grants will award a firm-fixed price contract to structurally reinforce the building's foundation and perimeter in accordance with provided plans, specifications, and applicable regulations. Offerors must submit responses by the due dates specified in Amendments 1 through 7, and proposals will be evaluated based on technical merit and price.

The solicitation was initially set aside for small businesses but was later opened to all offerors. Work must be completed within 180 days of the notice to proceed. The NAICS code is 238110 and PSC code is R499. No incumbent was identified. The solicitation documents provide details on the building's existing conditions as well as the required demolition, excavation, foundation reinforcement by helical piles and micropiles, masonry and window repairs, roof replacement, and mechanical and electrical upgrades. Offerors are instructed to use the provided bid schedule template when submitting fixed prices by construction division for the base scope of work.

Notice text

6 versions

Update #6 · Latest ·

Amendment 007 extends to 5/2/2022
Amendment 006 posts Question and Answers
Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.

The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.

The magnitude of construction is between $500,000 and $1,000,000.

Update #5 ·

Amendment 006 posts Question and Answers
Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.

The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.

The magnitude of construction is between $500,000 and $1,000,000.

Update #4 ·

Amendment 005 extends response date and provide site visit POC.
Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.

The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.

The magnitude of construction is between $500,000 and $1,000,000.

Update #3 ·

Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend.
Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.

The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days.

The magnitude of construction is between $500,000 and $1,000,000.

Update #2 ·

Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted.

Update #1 ·

CERC A3 Main Building Stabilization

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140G0121R0030_Amd_0007.pdf PDF
Sol_140G0121R0030_Amd_0006.pdf PDF
B09_Attachment_15_Q_and_A_Amd_006_0006.docx DOCX document
B09_Attachment_14_Site_Visit_Sign_In_140G0121R0030_Amd_006_0006.pdf PDF
Sol_140G0121R0030_Amd_0005.pdf PDF
Sol_140G0121R0030_Amd_0004.pdf PDF
Sol_140G0121R0030_Amd_0003.pdf PDF
B09_Attachment_13_Interested_Vendors_List_Amendment_002_0002.xlsx XLSX spreadsheet
Sol_140G0121R0030_Amd_0002.pdf PDF
B09_Attachment_12_140G0121R0030_Addendum_01_Amendment_002_0002.pdf PDF
Sol_140G0121R0030_Amd_0001.pdf PDF
B08_Attachment_9_SF1413_Statement_and_Acknowledgement_of_Subcontractor.pdf PDF
B08_Attachment_4_WD_MO20220036_dtd_7_Jan_2022.pdf PDF
B08_Attachment_1__Bid_Schedule.xlsx XLSX spreadsheet
B08_Attachment_5_Form_DI-137_Release_of_Claims.pdf PDF
B08_Attachment_10_Past_Performance_Questionnaire.pdf PDF
B08_Attachment_8_Payroll_WH-347.pdf PDF
Sol_140G0121R0030.pdf PDF
B08_Attachment_3_100CD_USGS_OAG_A3_CERC-Drawings.pdf PDF
B08_Attachment_2_100CD_USGS_OAG_A3_CERC-Specifications.pdf PDF
B08_Attachment_7_Payment_Bond_SF25A-16d.pdf PDF
B08_Attachment_6_Performance_Bond_SF25-16d1.pdf PDF
B08_Attachment_11_Bid_Bond_SF24-16d.pdf PDF
Show all 23

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CERC A3 Main Building Stabilization Award Award Notice
CERC A3 Main Building Stabilization This notice · Latest solicitation Solicitation
CERC A3 Main Building Stabilization Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity