B08_Attachment_1__Bid_Schedule.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- CERC A3 Main Building Stabilization Federal contract opportunity
- Solicitation number
- 140G0121R0030
About this file
This bid schedule template is for solicitation number 140G0121R0030 to stabilize the CERC A3 Main Building. Offerors are required to provide labor and material costs by construction division, along with overhead, profit and bond percentages. The total base offer cost will be automatically calculated. The soliciting agency is the Department of the Interior US Geological Survey Office of Acquisitions and Grants. Offerors should complete all labor and material cost fields by division as well as the overhead, profit, and bond percentage fields to comprise a full bid response for the CERC A3 Main Building Stabilization project located in Columbia, MO.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Bid Schedule
| Project Number: | 140G0121R0030 | Date: | ||
| Project Title | CERC A3 Main Building Stabilization | |||
| Project Location | Columbia, MO | |||
| Offeror Name | ||||
| Offeror Street | ||||
| Offeror City | State | Zip |
CLIN Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
Edward L Roy: Date Offer Prepared/Submitted
| 00001 | Item No. 00001 | Asbestos Testing | - 0 | - 0 | $ - 0 |
| 00002 | Division 1 | General Requirements | - 0 | - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 10 | Specialties | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 12 | Furnishings | - 0 | - 0 | - 0 | |
| Division 13 | Special Construction | - 0 | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 | |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 | |
| Division 22 | Plumbing | - 0 | - 0 | - 0 | |
| Division 23 | HVAC | - 0 | - 0 | - 0 | |
| Division 26 | Electrical | - 0 | - 0 | - 0 | |
| Division 27 | Communications | - 0 | - 0 | - 0 | |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Division 33 | Utilities | - 0 | - 0 | - 0 | |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 | |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
| Overhead % | 0.00% | ||
| Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37). | - 0 | ||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).
Edward L Roy: Enter all Labor Costs by Division
| Edward L Roy: Enter all Material Costs by Division | - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Total Base Offer Cost $ - 0 $ - 0 $ - 0