About this file

This bid schedule template is for solicitation number 140G0121R0030 to stabilize the CERC A3 Main Building. Offerors are required to provide labor and material costs by construction division, along with overhead, profit and bond percentages. The total base offer cost will be automatically calculated. The soliciting agency is the Department of the Interior US Geological Survey Office of Acquisitions and Grants. Offerors should complete all labor and material cost fields by division as well as the overhead, profit, and bond percentage fields to comprise a full bid response for the CERC A3 Main Building Stabilization project located in Columbia, MO.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Schedule

Project Number:140G0121R0030Date:
Project TitleCERC A3 Main Building Stabilization
Project LocationColumbia, MO
Offeror Name
Offeror Street
Offeror CityStateZip

CLIN Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Edward L Roy: Date Offer Prepared/Submitted

00001Item No. 00001Asbestos Testing- 0- 0$ - 0
00002Division 1General Requirements- 0- 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%
Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37).- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).

Edward L Roy: Enter all Labor Costs by Division

Edward L Roy: Enter all Material Costs by Division- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Total Base Offer Cost $ - 0 $ - 0 $ - 0