About this opportunity

The Department of the Army Corps of Engineers Engineering District Jacksonville is seeking contractors to perform the Central Everglades Planning Project (CEPP) Contract 11B for the Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures in Palm Beach County, Florida. The scope of work includes clearing, excavation, and processing of materials to construct a 17.75-mile embankment dam up to 38 feet high, as well as four gated outlet structures, one un-gated overflow spillway, one multi-bay gated inline spillway, rock foundation preparation, and installation of a seepage cutoff wall. The work also entails constructing approximately one mile of parallel open channels and a maintenance road. Offerors must submit proposals subject to Project Labor Agreement (PLA) requirements, and the acquisition will use the Tradeoff Source Selection Process evaluating Technical Merit, Past Performance, Small Business Participation, and Price, with the PLA factor assessed on an acceptable/unacceptable basis. The estimated period of performance is 3,652 calendar days after notice to proceed, with 90 days to commence work after award.

This is an unrestricted solicitation with no set-aside used. The NAICS code is 237110 (Water and Sewer Line and Related Structures Construction), and the PSC code is Y1HA (Construction of Flood Control, Navigation, and Storm Protection Structures). The contract will be incrementally funded, but the potential award value or budget range is not specified. The place of performance is Palm Beach County, Florida, and the South Florida Water Management District (SFWMD) owns the lands where the project will be constructed.

Notice text

6 versions

Update #6 · Latest ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. ***Pre-proposal conference information is provided via amendment 0001*** ***Amendment 0002 posted in PIEE 22 March 2024*** ***Amendment 0003 posted in PIEE 29 March 2024***

Update #5 ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. ***Pre-proposal conference information is provided via amendment 0001*** ***Amendment 0002 posted in PIEE 22 March 2024***

Update #4 ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. ***Pre-proposal conference information was provided via amendment 0001 posted on 13 March 2024 via PIEE*** 

A Pre-Proposal Conference will be held on Thursday, 21 March 2024 from 01:00pm – 02:00pm, EST via teleconference.

The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 199 129 0484#

https://usace1.webex.com/meet/timothy.d.willadsen

It is requested that an email be sent to martha.g.sequeira@usace.army.mil to confirm attendance by your organization.

*Site Visit Attendee list is provided as attachment on this notice*

Update #3 ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. ***Pre-proposal conference information is provided via amendment 0001***

Update #2 ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided via amendment***

*Site Visit information was added as attachment*

Update #1 ·

The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided via amendment***

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Kissimmee River Restoration (KRR) Project, S-69 Weir Repair Okeechobee, Florida, United States · NAICS 237990 ENDIST Jacksonville No set-aside