This solicitation is for the Central Everglades Planning Project (CEPP) Contract 11B to construct features of the Everglades Agricultural Area (EAA) A-2 Reservoir located in Palm Beach County, Florida. The scope of work includes clearing, excavation, and processing materials for a 17.75-mile embankment dam up to 38 feet high. Additional features are four gated outlet structures, one un-gated overflow spillway, one multi-bay gated inline spillway, rock foundation preparation and installation of a seepage cutoff wall. Approximately one mile of parallel open channels and a maintenance road will also be constructed. Surface and groundwater management is required to control water levels during construction. The estimated period of performance is 3,652 calendar days from notice to proceed. Offerors must submit responses subject to Project Labor Agreement requirements. A pre-proposal conference will be held with further details provided by amendment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 15 March 2024

Time: 0830-1200

Meeting location: 12315 US Highway 27 S South Bay, FL 33493 (26.485170, -80.657136)

Access to the site will be from U.S. Highway 27 approximately 13 miles (mile marker 60) south of the city of South Bay, Florida.

Further direction will be given on site the morning of 15 March 2024.

CNT 11B, A-2 Reservoir Site Visit

(26.485170, -80.657136)

North

Mile Marker 60

Substation

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4