Carpet Removal/Install at Air Traffic Control Tower Spokane Washington
Closed Solicitation Posted
- Solicitation number
- 6973GH-22-R-00144
- Agency
-
Franchise Acquisition Servies
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238330 Flooring Contractors
- Place of performance
- Spokane, Washington 99224, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals were due 22 July 2022 by 1400 PDT changed to 25 July 2022 by 1400PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Update #5 ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals were due 18 July 2022 by 1400 PDT changed to 22 July 2022 by 1400PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Update #4 ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals were due 12 July 2022 by 1400 PDT changed to 18 July 2022 by 1400PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Update #3 ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals were due 7 July 2022 by 1400 PDT changed to 12 July 2022 by 1400PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Update #2 ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals were due 29 June 2022 by 1400 PDT changed to 7 July 2022 by 1400PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Update #1 ·
Description
Disclosure of the Size of Construction Project:
Between $100,000 and $200,000
All Questions are due NLT 22 June 2022 by 1400 PDT.
Proposals are due NLT 29 June 2022 by 1400 PDT.
See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC.
NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by
phone 509-742-2610.
The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Market Survey for upcoming requirement for carpet removal/install at Air Traffic Control Tower Spokane Washington | Pre-Solicitation | |
| Market Survey for upcoming Carpet Requirement @ Spokane WA | Special Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity