FAALC Enhancement Program
GEG ATCT
8314 W Electric Ave
Spokane, WA 99224
STATEMENT OF WORK
GEG
Spokane, WA
PURPOSE: FAALC Enhancement Program (Beautification).
STATEMENT OF WORK:
The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined;
i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.
Anti-Static
Yellow = 24” x 24” Carpet Squares / Blue = Anti-Static 24” x 24” Carpet Squares
NOTE: “See attached drawings”
COVID Consideration(s): Contractor will follow all facility, local, state, and federal COVID protocols; utilizing entrance and exit point established by local FAA representative. Contractor will be required to create safe work area utilizing barriers and/or materials for separation based upon COVID protocols during execution of enhancement described in this document.
Scope of Work:
a) Furniture Relocation:
i) Relocate and safely store furniture, desks, chairs, cabinets, equipment, and etc. to prevent damage
b) Demolition:
i) Remove all old wall base
ii) Remove all old carpet as indicate on the 1st, 11th, 13th (air traffic control cab floor see attached drawings)
iii) Completely remove all old carpet adhesive
c) Remediation:
i) Remove all carpet adhesive
ii) Remove all wall base adhesive
iii) Remove all old carpet transition
d) Install Work:
i) Install new carpet (Mohawk Group DATUM BT2847728 CHERT 24” x 24” carpet square or equivalent)
ii) Install new Anti-Static carpet (Static Smart Discovery ECO Carson 24” x 24” carpet square or equivalent)
iii) Install new wall base (Mohawk Group 4” x 120’ CRW03 Deep Chestnut 084 or equivalent)
iv) Install new carpet transition strips
v) Touch paint as needed; color and type to match as closely to current paint as possible
e) Furniture Replaced:
i) Replace all furniture, desks, chairs, cabinets, equipment, and etc. (confirm location with local
POC)
LOCATION:
ATC Facility Payne Airport
PERIOD OF PERFORMANCE:
Completion within 30 days from start of project. Any deviation of the period of performance timeline will require the prior approval of the CO (contract officer).
SECURITY REQUIREMENTS:
Approved entrance from facility manager. FAA personnel will escort contractor, sub-contractor, delivery, and vendor personnel while on site; contractor will arrange with FAA POC for delivery schedule and daily work schedule.
SPECIAL REQUIREMENTS:
Contractor will provide portable latrine and sanitation/wash station. Contractor will ensure regular servicing of portable latrine is performed.
The contractor will provide waste removal container and removal from site in accordance it local sanitary rules and regulations.
Local SSC/Stakeholder will contact EOSH representative to determine requirements and/or submittals that must be reviewed and approved prior to implementation. Demolition work will be performed at this site creating dust and debris in the ATC (Air Traffic Control) facility.
SUBMITTALS:
1. Warranty documentation on all newly installed equipment, fixtures, and furnishings.
2. Owner’s manuals for newly installed equipment, fixtures, and furnishings.
3. Disposal receipt will be required.
4. Provide “as installed drawings”.
Notes:
Yellow Highlighted Areas: Mohawk Group, Style: DATUM BT284/QB284, Color: 7728 Chert
Blue Highlighted Areas: Static Smart, Style: Discovery ECO, Color: Carson
Room:
1.92in. X 1.81in.
Room:
2.31in. X 2.31in.