Camp Robinson Fuel Facilities Repairs
Closed Pre-Solicitation Posted
- Solicitation number
- W9128F26SS002
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- Camp Robinson 378 Military Rd North Little Rock, AR 72199 72199
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Omaha is seeking comprehensive repairs and modernization of fuel facilities at Camp Robinson. The procurement encompasses extensive work on bulk fuel storage and distribution infrastructure, including repairs to fencing systems, lightning protection, canopy roof drainage, and numerous piping components such as basket strainers, flow switches, pressure gauges, and loading arm swivel joints. Additionally, the scope includes installation of new fuel dispensers, above-ground storage tanks (ASTs) with associated catwalk and stair systems, replacement of asphalt and concrete pavement, removal of existing oil-water separators, installation of new remote containment basins, and LED lighting upgrades with relocated light poles. This pre-solicitation notice was posted on April 15, 2026, with a response deadline of April 29, 2026, providing potential bidders with fourteen days to submit questions and prepare proposals. While specific evaluation criteria are not detailed in this notice, contractors should expect assessment based on technical capability, past performance, compliance with safety and environmental standards, and cost competitiveness.
This opportunity is designated as a Total Small Business set-aside, restricting competition to small business entities as defined by the Small Business Administration. The contract falls under NAICS Code 237120 (Oil and Gas Pipeline and Related Structures Construction) and PSC Category Z1NA (Maintenance of Fuel Supply Facilities). No incumbent contractor information or specific award value range is provided in this pre-solicitation notice. The scope of work suggests a complex, multi-faceted project involving significant infrastructure replacement and modernization rather than routine maintenance, likely representing a substantial contract value given the breadth of work items including tank replacements, dispenser island installations, and site-wide utility upgrades. Small businesses interested in pursuing this opportunity should begin technical and financial preparations immediately to meet the April 29 deadline for initial submissions.
Notice text
All work required to repair Bulk fencing, fence grounding, Lightning Protection System, and canopy roof drain system. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, and Replace Threaded Piping and Fittings, Install Issue Meter Basket Strainer, and repair improper flexible conduit and Missing Sealing Fitting. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, Repair Filter Separator Control Valve, Repair Grounding on Catwalk and Ladder, Repair overfill alarm, Seal Open Fittings, and Repair Exposed Meter Conductors. All work to repair Missing EFSO Alarm and Signage. All work to repair Roll Over Curbs and Containment Drain Piping. All work to repair Equipment Pad. All work to Install Shear Valve on dispenser Piping, and repair Grounding Connections on Dispenser. All work required to repair MSS perimeter fence grounding. All work to repair Missing Handhole Cover on Light Pole and Change Pole Lights to LED. All work to relocate light poles. All work to repair EFSO System and Surge Protective Device and all work to install new eyewash. All work to repair asphalt pavement and concrete pavement to accomplish tank and dispenser infrastructure replacement. All work to remove Oil-water separator. All work to provide a new remote containment basin. All work to install New Mogas Dispenser Island and dispenser, including removal of the existing. All work to install New F-24 Dispenser Island and dispensers, including removal of the existing. All work to install New Mogas AST with catwalk and stairs, including removal of the existing. All work to install New F-24 AST with catwalk and stairs, including removal of the existing. All work to install New F-24 AST with catwalk and stairs, including removal of the existing. All work to install New Mogas Truck Offload with containment. All work to install F-24 Truck Offload with containment. All work to install New AST tank pad. All work to Lighting Protection System, Canopy Ground, and Canopy Lighting.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WH Ford RTC Fueling System Repairs | ENDIST Omaha | Total Small Business | |
| Kingsley Field Fueling System Repairs | ENDIST Omaha | No set-aside | |
| Propane Fort Leonard Wood | MICC Fort Eustis | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity