About this opportunity

The Department of the Air Force Pacific Air Forces is seeking a contractor to install foam insulation at Camp Mad Bull on Joint Base Elmendorf-Richardson in Alaska. The project involves applying closed cell high density foam insulation at 3" depth or R-21 value to exterior walls, end walls, and roof of a Quonset-style building, covering approximately 12,000 square feet. Contractors must also apply white fire paint to create a 15-minute thermal barrier over the exposed spray foam. The government will evaluate quotes based on price only, with quotes due by 12 PM AKST on January 24, 2025, and questions accepted until January 13, 2025. Contractors must maintain active SAM registration, submit a price schedule, provide insulation product data, and complete all specified provisions and clauses.

The solicitation is a 100% HUBZone set-aside under NAICS code 238310 for Drywall and Insulation Contractors, with a size standard of $19 million. The contract is a firm-fixed-price award with a performance period ending June 30, 2025. Contractors must comply with Service Contract Act wage determinations, which mandate minimum hourly rates ranging from $12.90 to $17.20 depending on specific labor classifications. The project is located in Anchorage, AK 99506, and requires contractors to provide all management, personnel, vehicles, equipment, supplies, tools, and supervision necessary to complete the insulation work. Additional requirements include following OSHA and AFOSH standards, coordinating work hours with the 773d Civil Engineer Squadron, maintaining site security, and ensuring no damage to existing property.

Notice text

3 versions

Update #3 · Latest ·

TTP K-Span in location at lower Camp Mad Bull Training area on Joint Base Elmendorf-Richardson, AK. Install closed cell high density foam applied at 3" depth or R-21 value to exterior walls, end walls and roof of Quonset style building. Insulation surface area is approx. 12,000 sq ft. White fire paint applied to a full 15-minute thermal barrier thickness over all exposed spray foam. The Contractor will provide all management, personnel, vehicles, equipment, supplies, tools, materials, supervision and other items and non-personal services necessary to perform foam insulation as defined in this Performance Work Statement (PWS).

** Amendment 1 -  A site visit will occur on 08 January 2025 at 1300 at the lower Camp Mad Bull Training area.**

** Amendment 2 - Provide Questions and Answers for the requirement. **

Update #2 ·

TTP K-Span in location at lower Camp Mad Bull Training area on Joint Base Elmendorf-Richardson, AK. Install closed cell high density foam applied at 3" depth or R-21 value to exterior walls, end walls and roof of Quonset style building. Insulation surface area is approx. 12,000 sq ft. White fire paint applied to a full 15-minute thermal barrier thickness over all exposed spray foam. The Contractor will provide all management, personnel, vehicles, equipment, supplies, tools, materials, supervision and other items and non-personal services necessary to perform foam insulation as defined in this Performance Work Statement (PWS).

** Amendment 1 -  A site visit will occur on 08 January 2025 at 1300 at the lower Camp Mad Bull Training area.**

Update #1 ·

TTP K-Span in location at lower Camp Mad Bull Training area on Joint Base Elmendorf-Richardson, AK. Install closed cell high density foam applied at 3" depth or R-21 value to exterior walls, end walls and roof of Quonset style building. Insulation surface area is approx. 12,000 sq ft. White fire paint applied to a full 15-minute thermal barrier thickness over all exposed spray foam. The Contractor will provide all management, personnel, vehicles, equipment, supplies, tools, materials, supervision and other items and non-personal services necessary to perform foam insulation as defined in this Performance Work Statement (PWS).