This is a Questions & Answers document for solicitation FA500025Q0006 regarding insulation work at Camp Mad Bull. The document addresses four contractor questions about a spray foam installation project.
The Q&A clarifies that the contractor is responsible for taping off door opener switches and junction boxes during the 3" spray foam application, and must ensure these remain visible and operational afterward. There is no on-site power or 50-amp circuit available, so the contractor must provide generator power for lighting and other needs. The Notice to Proceed will be issued after contract award, with project completion required by June 30, 2025. The contractor is responsible for maintaining adequate heating in the work area if work is performed before late April, to meet installation requirements during the Period of Performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The SOW asks for 3” of Spray foam, who will be responsible for pulling the surface mounted light and door opener switches away from the wall 2-3 “
Contractor shall tape off door opener switches and electric junction boxes. Contractor shall ensure the items are visible and operational after the spraying is completed.
2. Will access to an elec. power panel for a 50 amp circuit be available?
There is no power on site, nor 50-amp circuit on the building. The Contractor shall provide generator power for lights and any other requirements to accomplish the requirement.
3. SOW state completion is 30 June 2025. When to you expect the NTP?
A Notice to Proceed (NTP) will be sent to the Contractor once award has been executed.
4. Will the contractor be responsible for the needed heat, if this work is completed before late April?
The Contractor shall be responsible for heating the work area to the adequate temperature for the installation to meet the Period of Performance.