This Performance Work Statement (PWS) outlines requirements for insulation installation at the TTP K-Span building located in the lower Camp Mad Bull Training area on Joint Base Elmendorf-Richardson, Alaska. The project involves installing closed cell high density foam at 3" depth or R-21 value to exterior walls, end walls and roof of a Quonset style building measuring 120'x40'x22', covering approximately 12,000 square feet. The contractor must apply white fire paint to achieve a full 15-minute thermal barrier thickness over all exposed spray foam.
The contractor is responsible for all management, personnel, equipment, materials and supervision, while following OSHA and AFOSH standards. Key requirements include protecting doors, lights and electrical outlets from overspray, maintaining all electrical components in working order, incorporating green procurement principles, and disposing of construction debris off-base. The contractor must coordinate work hours with the 773d Civil Engineer Squadron and MSgt Spilker, maintain site security, prevent damage to existing property, and keep driveways and entrances clear. The project falls under Department of the Air Force Pacific Air Forces management, with solicitation number FA500025Q0006.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
773d Civil Engineer Squadron Joint Base Elmendorf-Richardson, AK
PERFORMANCE WORK STATEMENT
Mad Bull TTP K-Span Insulation
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: TTP K-Span in location at lower Camp Mad Bull Training area on Joint Base Elmendorf-Richardson, AK. Project hours are to be coordinated with 773d
CES
1.2 UNIQUE REQUIREMENT: None
1.3 PROJECT DESCRIPTION: Install closed cell high density foam applied at 3" depth or R-21 value to exterior walls, end walls and roof of Quonset style building. Insulation surface area is approx. 12,000 sq ft. White fire paint applied to a full 15-minute thermal barrier thickness over all exposed spray foam. The Contractor will provide all management, personnel, vehicles, equipment, supplies, tools, materials, supervision and other items and non-personal services necessary to perform foam insulation as defined in this Performance Work Statement (PWS).
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with MSgt Spilker prior to the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.5 HEATH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times.
Mad Bull TTP K-Span Insulation Attachment 1, PWS
Solicitation #FA500025Q0006
The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
2.6 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/cpg/products.htm for a listing of the products that have been mandated as green procurement requirements for purchases.
SECTION 3: MAD BULL TTP K-SPAN INSULATION
3.1 General Requirements (Div 1)
3.1.1. Building Dimensions 120'x40’x22’. Closed cell high density foam applied at 3" depth or R-21 value to interior side of exterior walls, end walls and roof. Paint: White fire paint applied to a full 15-minute thermal barrier thickness over all exposed spray foam.
3.2 Existing Conditions (Div 2)
3.2.1. Doors, lights and electrical outlets will be covered and protected from overspray by contractor.
3.3 Concrete (Div 3)
3.4 Masonry (Div 4)
3.5 Metals (Div 5)
3.6 Wood, Plastics & Composites (Div 6)
3.7 Thermal & Moisture Protection (Div 7)
3.8 Openings (Div 8)
3.9 Finishes (Div 9)
3.10 Specialties (Div 10)
3.11 Equipment (Div 11)
3.12 Furnishings (Div 12)
3.13 Special Construction (Div 13)
3.14 Conveying Equipment (Div 14)
3.15 Fire Suppression (Div 21)
3.16 Plumbing (Div 22)
3.17 Heating Ventilation Air Conditioning (HVAC) (Div 23)
3.18 Electrical (Div 26)
3.18.1. All existing electrical component must be exposed and in good working order after spray foam operations are complete.
3.19 Communications (Div 27)
Mad Bull TTP K-Span Insulation Attachment 1, PWS
Solicitation #FA500025Q0006
3.20 Electronic Safety & Security (Div 28)
3.21 Earthwork (Div 31)
3.22 Exterior Improvements (Div 32)
3.23 Utilities (Div 33)
SECTION 4: PROJECT MANAGER
4.1 2Lt Emily Schaum
Emily.schaum.1@us.af.mil Phone: 907-384-1138
4.2 MSgt Chase Spilker
Chase.spilker@us.af.mil Phone: 907-552-5664
Mad Bull TTP K-Span Insulation Attachment 1, PWS
Solicitation #FA500025Q0006 mailto:Chase.spilker@us.af.mil
| SECTION 1: PROJECT INFORMATION |
| SECTION 2: GENERAL REQUIREMENTS |
| SECTION 3: FSA-24-0028 MAD BULL TTP K-SPAN INSULATION |
| SECTION 4: PROJECT MANAGER |
File details come from the government source that posted it. Updated .