Calexico, CA Geotechnical Surveying /Drilling Services

Closed Solicitation Posted

Solicitation number
6973GH-23-R-00006
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Calexico, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks geotechnical surveying and drilling services to be performed within a five-mile radius of the West Port of Entry in Calexico, California. The United States Border Patrol requires technical design, engineering, geophysical and geotechnical services to provide up to thirty-two boreholes up to one hundred feet deep. Additionally, the selected vendor must case and monument five boreholes as permanent observation wells. Optional tasks may include cone penetration testing, technology deployment services, and technology support services. Proposals will be evaluated based on technical qualifications, past performance, and price. The deadline for questions is January 25, 2023.

There is no set-aside designation. The primary NAICS code is 541360 and PSC code R425. The soliciting agency is the Department of Transportation Federal Aviation Administration Franchise Acquisition Services. The statement of work requires the vendor to be responsible for scheduling, equipment rental, spoils management, safety measures, traffic control, site security, restoration, and providing as-built and geotechnical reports. Work must be completed within five miles of the West Port of Entry in Calexico, California by the specified deadline.

Notice text

3 versions

Update #3 · Latest ·

Amendment 002:

The purpose of this amendment is to extend the proposal due date (See attachments)

From: 25 January 2023

To: 01 Februrary 2023

End of Amendment 002.

Amendment 001:

The purpose of this amendment is to post Questions and Answers.

End of Amendment 001.

The United States Border Patrol (USBP) requires technical design, engineering, geophysical and geotechnical services to provide the design, planning, management, and execution of all critical tasks required to provide up to thirty-two (32) boreholes of up to forty-two (42”) in diameter up to one hundred (100’) feet deep. Additionally, the vendor will be required to provide casing and monuments to maintain five (5) boreholes as permanent observation wells. Optional tasks that may be required include: cone penetration testing (or an excepted alternative), technology deployment services, and technology support services.

The completion of the work will also require the rental and operation of several different types of light and heavy equipment that may not be specifically called out in the SOW but should be planned for during the technical design and pre-project planning phase of this effort. Executing the work safely and efficiently will begin with close coordination with CBP/local USBP representatives, property managers, utility locators, DigAlert, concrete/asphalt contractors, drillers, heavy equipment providers and operators, and rental equipment providers. The vendor will be responsible for all aspects of executing the SOW outlined below, including (but not limited to): scheduling deliveries and pickups of equipment, spoils management, vertical and horizontal safety barriers, traffic control, site security, site restoration, final inspection of the completed sites and providing as-built and geotechnical reports. The work will be completed at specific locations as directed by USBP personnel within the Roosevelt easement within a 5.00 mile radius of the West Port of Entry, Calexico, CA (1 E 1st St, Calexico, CA 92231).

Update #2 ·

Amendment 001:

The purpose of this amendment is to post Questions and Answers.

End of Amendment 001.

The United States Border Patrol (USBP) requires technical design, engineering, geophysical and geotechnical services to provide the design, planning, management, and execution of all critical tasks required to provide up to thirty-two (32) boreholes of up to forty-two (42”) in diameter up to one hundred (100’) feet deep. Additionally, the vendor will be required to provide casing and monuments to maintain five (5) boreholes as permanent observation wells. Optional tasks that may be required include: cone penetration testing (or an excepted alternative), technology deployment services, and technology support services.

The completion of the work will also require the rental and operation of several different types of light and heavy equipment that may not be specifically called out in the SOW but should be planned for during the technical design and pre-project planning phase of this effort. Executing the work safely and efficiently will begin with close coordination with CBP/local USBP representatives, property managers, utility locators, DigAlert, concrete/asphalt contractors, drillers, heavy equipment providers and operators, and rental equipment providers. The vendor will be responsible for all aspects of executing the SOW outlined below, including (but not limited to): scheduling deliveries and pickups of equipment, spoils management, vertical and horizontal safety barriers, traffic control, site security, site restoration, final inspection of the completed sites and providing as-built and geotechnical reports. The work will be completed at specific locations as directed by USBP personnel within the Roosevelt easement within a 5.00 mile radius of the West Port of Entry, Calexico, CA (1 E 1st St, Calexico, CA 92231).

Update #1 ·

The United States Border Patrol (USBP) requires technical design, engineering, geophysical and geotechnical services to provide the design, planning, management, and execution of all critical tasks required to provide up to thirty-two (32) boreholes of up to forty-two (42”) in diameter up to one hundred (100’) feet deep. Additionally, the vendor will be required to provide casing and monuments to maintain five (5) boreholes as permanent observation wells. Optional tasks that may be required include: cone penetration testing (or an excepted alternative), technology deployment services, and technology support services.

The completion of the work will also require the rental and operation of several different types of light and heavy equipment that may not be specifically called out in the SOW but should be planned for during the technical design and pre-project planning phase of this effort. Executing the work safely and efficiently will begin with close coordination with CBP/local USBP representatives, property managers, utility locators, DigAlert, concrete/asphalt contractors, drillers, heavy equipment providers and operators, and rental equipment providers. The vendor will be responsible for all aspects of executing the SOW outlined below, including (but not limited to): scheduling deliveries and pickups of equipment, spoils management, vertical and horizontal safety barriers, traffic control, site security, site restoration, final inspection of the completed sites and providing as-built and geotechnical reports. The work will be completed at specific locations as directed by USBP personnel within the Roosevelt easement within a 5.00 mile radius of the West Port of Entry, Calexico, CA (1 E 1st St, Calexico, CA 92231).