CA FLAP MOD 258(1) Blue Lake Road

Closed Solicitation Posted

Solicitation number
6982AF25R000017
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Likely, California, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is soliciting proposals for roadway rehabilitation and reconstruction services on Blue Lake Road (CR 258) in the Modoc National Forest, located near Likely, California. The project scope includes rehabilitating 6.6 miles of CR 258, addressing two rockfall hazard sections on CR 64, and improving 1.5 miles of Campground Road through activities such as pulverizing and asphalt surfacing, rockfall hazard mitigation, guardrail installation, culvert replacement, ditch reconditioning, and erosion control measures. Key contract requirements include maintaining current road widths of 20-22 feet, submitting prices for both the base schedule and an option, maintaining compliance with the Buy American Act, and adhering to Department of Labor wage rates. Award will be made to the MATOC (Multiple Award Task Order Contract) offeror submitting the lowest individual task order price, with the government intending to award without discussions whenever possible. The proposal deadline was October 23, 2025, with technical questions previously due by October 16, 2025, and bid bonds required to be submitted to Eric Grosskreuz at the Federal Highway Administration's Central Federal Lands Division Office in Lakewood, Colorado.

This solicitation (Number 6982AF25R000017) is designated as a Total Small Business Set-Aside, with no current contractors or incumbents identified in the available materials. The estimated project price range falls between $10-20 million, and the NAICS classification is 237310 (Highway, Street, and Bridge Construction) with a small business size standard of $45 million in annual revenue. The project involves approximately 5.73 miles of roadway rehabilitation with an additional 1.57-mile option, and work must commence within 10 calendar days of receiving the notice to proceed. Key deliverables include 29 line items covering mobilization, survey and staking, clearing and grubbing, roadway excavation, aggregate placement, full-depth reclamation, asphalt concrete pavement installation, and various associated tasks with precisely specified quantities measured in linear feet, cubic yards, square yards, and tons. Performance will take place in Likely, California 96116, within the Warner Mountain Ranger District of the Modoc National Forest, and the project addresses safety concerns while improving public access to Blue Lake's recreational facilities.

Notice text

2 versions

Update #2 · Latest ·

Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). The purpose of the project is to address safety concerns and improve access to recreational opportunities at Blue Lake by rehabilitating two sections of rockfall hazards on CR 64, 6.6 miles of CR 258, and 1.5 miles of Campground Road. The two locations along CR 64 that pose rockfall and slope failure hazards are located 4.6 miles east of the town of Likely, California, and about 3.4 miles farther east. Rehabilitation of CR 258 is from the intersection of CR 64 near the Pit River bridge and extends 6.6 miles to Campground Road, and then another 1.5 miles southwest to the campground loop at Blue Lake.


The project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. Roadway improvements will maintain the current width of 20’ and 22’ feet on CR 258 and CR 64 in the rockfall areas and preserve the existing width on Campground Road.


Work will stay within the current road prism and maintained roadside ditch, except where guardrail and culverts need replacement. The project also includes minor horizontal alignment and profile adjustments, mitigating rockfall hazards, installing guardrail, roadway subexcavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.
 

NOTICE TO OFFERORS:

Offerors must submit a price for the first Task Order, Blue Lake Road (Volume II), which is being
issued simultaneously with this MATOC Request for Proposal. The Government intends to award
the Blue Lake Road Task Order to the successful MATOC Offeror with the lowest individual Task
Order price. For the MATOC (Technical Proposal) RFP and Task Order-RFP, whenever possible,
award will be made without discussions.

Link to CA MATOC RFP:  https://sam.gov/workspace/contract/opp/630eb2d89217455ab097c221e99a79d0/view

Update #1 ·

Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). The purpose of the project is to address safety concerns and improve access to recreational opportunities at Blue Lake by rehabilitating two sections of rockfall hazards on CR 64, 6.6 miles of CR 258, and 1.5 miles of Campground Road. The two locations along CR 64 that pose rockfall and slope failure hazards are located 4.6 miles east of the town of Likely, California, and about 3.4 miles farther east. Rehabilitation of CR 258 is from the intersection of CR 64 near the Pit River bridge and extends 6.6 miles to Campground Road, and then another 1.5 miles southwest to the campground loop at Blue Lake.


The project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. Roadway improvements will maintain the current width of 20’ and 22’ feet on CR 258 and CR 64 in the rockfall areas and preserve the existing width on Campground Road.


Work will stay within the current road prism and maintained roadside ditch, except where guardrail and culverts need replacement. The project also includes minor horizontal alignment and profile adjustments, mitigating rockfall hazards, installing guardrail, roadway subexcavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.
 

NOTICE TO OFFERORS:

Offerors must submit a price for the first Task Order, Blue Lake Road (Volume II), which is being
issued simultaneously with this MATOC Request for Proposal. The Government intends to award
the Blue Lake Road Task Order to the successful MATOC Offeror with the lowest individual Task
Order price. For the MATOC (Technical Proposal) RFP and Task Order-RFP, whenever possible,
award will be made without discussions.

Link to CA MATOC RFP:

Attachments

Files attached to this notice, newest first
File Type Posted
QnA 10-22-25.pdf PDF
A003 CA FLAP MOD 258.pdf PDF
QnA 10-21-25.pdf PDF
Interested Vendors 10-15-25.pdf PDF
QnA 10-3-25.pdf PDF
QnA 9-30-25.pdf PDF
QnA 9-24-25.pdf PDF
A002 Blue Lake 09.18.25.pdf PDF
A001 Blue Lake 09.11.25.pdf PDF
CA FLAP MOD 258(1) Plan Set.pdf PDF
CA FLAP MOD 258(1) Blue Lake Road Pavement Report -Final.pdf PDF
RFP 6982AF25R000017 CA FLAP MOD 258(1) Blue Lake Road.pdf PDF
MOD258(1) Blue Lake Geotech Report_Final.pdf PDF
Physical Data.zip ZIP file
Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CA FLAP MOD 258(1) Blue Lake Road This notice · Latest solicitation Solicitation
CA FLAP MOD 258(1) Blue Lake Road Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity