This document is a Request for Proposal (RFP) for a roadway construction and rehabilitation project in Modoc County, California. The project involves Blue Lake Road (CR 258) within the Warner Mountain Ranger District of the Modoc National Forest, focusing on roadway rehabilitation, reconstruction, rockfall hazard mitigation, and drainage improvements across approximately 5.73 miles (with an additional 1.57-mile option). The work includes pulverizing and asphalt surfacing, minor alignment adjustments, guardrail installation, culvert replacement, ditch reconditioning, erosion control, signage, and pavement markings.

The solicitation is issued by the Federal Highway Administration's Central Federal Lands Division, with proposals due by 2:00 p.m. local time on 10/09/2025. The estimated project price range is between $10-20 million, classified under NAICS 237310 with a small business size standard of $45 million. Bidders must submit prices for both the base schedule and an option, with award to be made to the lowest responsible bidder. Electronic proposals are accepted, and contractors must be registered in the System for Award Management (SAM). The government intends to award the contract without discussions, with performance to begin within 10 calendar days of the notice to proceed.

View the file

Other files

File Type Posted
QnA 10-22-25.pdf PDF
A003 CA FLAP MOD 258.pdf PDF
QnA 10-21-25.pdf PDF
Interested Vendors 10-15-25.pdf PDF
QnA 10-3-25.pdf PDF
QnA 9-30-25.pdf PDF
QnA 9-24-25.pdf PDF
A002 Blue Lake 09.18.25.pdf PDF
A001 Blue Lake 09.11.25.pdf PDF
CA FLAP MOD 258(1) Plan Set.pdf PDF
CA FLAP MOD 258(1) Blue Lake Road Pavement Report -Final.pdf PDF
Physical Data.zip ZIP file
MOD258(1) Blue Lake Geotech Report_Final.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This solicitation cites

TASK ORDER – CALIFORNIA ROAD & BRIDGE CONSTRUCTION

(MATOC)

REQUEST FOR PROPOSAL

Solicitation Number: 6982AF25R000017

CA FLAP MOD 258(1)

BLUE LAKE ROAD

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units

U.S. Department of Transportation Federal Highway Administration

Central Federal Lands Highway Division 12300 West Dakota Avenue, Suite 360

Lakewood, CO 80228 Email: CFLContracts@dot.gov mailto:CFLContracts@dot.gov

STATE:

LOCATION:

CALIFORNIA

MODOC NATIONAL FOREST

COUNTY: MODOC COUNTY

LENGTH: SCHEDULE A: 5.73 MILES

OPTION X: 1.57 MILES

TYPE OF IMPROVEMENT: ROAD RECONSTRUCTION, REHABILITATION,

ASPHALT SURFACING REPAIR, GUARDRAIL

AND DRAINAGE

TABLE OF CONTENTS

Notice to Offerors A-i

Solicitation, Offer, and Award ________________________________________ A-1

Bid Schedule Instructions ____________________________________________ A-5

Solicitation Provisions _______________________________________________ B-1

Contract Clauses ___________________________________________________ C-1

Construction Wage Rate Determination _________________________________ D-1

Division 100 ................................................................................................................ E-1 Division 150.............................................................................................................. E-22 Division 200.............................................................................................................. E-40 Division 300.............................................................................................................. E-44 Division 400.............................................................................................................. E-46 Division 500......................................................................................................See FP-14 Division 600.............................................................................................................. E-54 Division 700.............................................................................................................. E-66

Appendix A ........................................................................................................Fire Plan

PROJECT OVERVIEW

Blue Lake Road (CR 258) provides access to Blue Lake and its associated recreational facilities within the Warner Mountain Ranger District of the Modoc National Forest (MNF). This project includes roadway rehabilitation (pulverizing and asphalt surfacing), two short segments of reconstruction, rockfall hazard mitigation, and drainage improvements. The project also includes minor horizontal alignment and profile adjustments, installing guardrail, roadway sub-excavation, replacing culverts, reconditioning ditches, installing erosion control, installing signs, and applying pavement markings.

Offerors must submit a price for the first Task Order, Blue Lake Road (Volume II), which is being issued simultaneously with this MATOC Request for Proposal. The Government intends to award the Blue Lake Road Task Order to the successful MATOC Offeror with the lowest individual Task Order price. For the MATOC (Technical Proposal) RFP and Task Order-RFP, whenever possible, award will be made without discussions.

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

A-i

NOTICE TO OFFERORS

ELECTRONIC PROPOSALS WILL BE ACCEPTED WITH EXCEPTION TO THE BID

BOND. SUBMIT YOUR PROPOSAL TO CFLcontracts@dot.gov. Submit the following documents with your Proposal:

• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2

• Bid Schedule, Pages A-6 through A-11

• Buy American Act & Hazardous Materials, Pages A-13 through A-14

• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.

Original’s must be received no later than the response due date and time.

o Digital copies may be downloaded at https://www.gsa.gov/forms- library/ bid-bond

• Completed the VETS 4212 declaration, Page A-ii

• Indication of interest in formal Partnering, Page A-12

I. PRE-PROPOSAL INFORMATION

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at https://sam.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

The FP-14 was utilized for the design of this project. Paper copies of the FP-14 will not be provided to bidders or the awarded Prime Contractor. The FP-14 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation.

Applicable FAR/TAR provisions and clauses in this RFP are incorporated by reference or full text.

FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/content/regulations.

Notice of SAM Registration – you must be registered in the System for Award Management (SAM) prior to submission of a bid in response to this solicitation. Failure to register prior to submission of a bid may require award to the next successful registered offeror. See FAR Subpart 4.1102. Register online at www.sam.gov.

mailto:CFLcontracts@dot.gov https://www.gsa.gov/forms-library/bid-bond https://www.gsa.gov/forms-library/bid-bond https://sam.gov/ https://flh.fhwa.dot.gov/resources/specs/ https://www.acquisition.gov/content/regulations http://www.sam.gov/

“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in DOT solicitations.

Examples include:

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3(d), Offeror Representations and Certifications—Commercial Products and Commercial Services.

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation, and

• 52.212-3(t), Offeror Representations and Certifications—Commercial Products and Commercial Services.

Contracting officers will not need to consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 5 years are above $45 million, you are a large business for this solicitation. If they are below $45 million you are a small business. Before submitting proposals, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov. Include NAICS 237310 in your SAM profile.

Vets 4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.

• My firm had a qualifying Federal Contract in 2024 and has complied with the reporting requirements.

• My firm did not have a qualifying Federal Contract in 2024 and is therefore exempt from the reporting requirements.

Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals.

Photocopied and faxed copies of bonds will be rejected and cause your proposal to be non-responsive.

Accuracy and Completeness of Proposal - The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).

A-ii http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm

A-iii

Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.215-1, Instructions to Offerors-Competitive Acquisition. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

FAR 36.211 requires a description of the Federal Highway Administration’s (FHWA) procedures that apply to definitization of equitable adjustments for change orders under construction contracts. It also requires that FWHA furnish data on the agency’s past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.

Change orders as defined in FAR 2.101 are changes to the contract work pursuant to FAR 52.243-4, Changes.

There are no agency-specific additional policies and procedures that exist at this time.

The table below contains data regarding the definitization of equitable adjustments for change orders under construction contracts by fiscal year (FY).

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY

FY

FY

0 to 30 days 0 0 0

31 to 60 days 1 0 1

61 to 90 days 0 0 0

91 to 180 days 2 1 4

181 to 365 days 0 1 2

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON OCTOBER 1, 2025.

Questions can be submitted to CFLcontracts@dot.gov. Questions and answers will be sent by email to all MATOC Contract holders.

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov mailto:CFLcontracts@dot.gov mailto:cflcontracts@dot.gov

II. Advertise and Proposal

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

Insurance requirements - See Subsection 107.05 of the FP-14.

Masterworks - Contractors shall use the Government’s web-based system, Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).

The Contractor shall be required to attend a training session on the use of Masterworks. The virtual training session will be either a video presentation or live training as determined by the CO. The Contractor shall be responsible for training additional staff.

The Contractor shall be required to submit a user account form to gain access to the Masterworks. See Subsection 104.04.

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY

FY

FY

366 or more days 2 0 0

After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance

0 0 0

A-iv

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

6982AF25R000017

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

09/08/2025

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

HFLCEO250323PR

6. PROJECT NO.

CA FLAP MOD 258(1)

7. ISSUED BY: CODE: 69050001 8. ADDRESS OFFER TO:

Eric Grosskreuz, Acquisition Program Specialist Federal Highway Administration, Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-14, U.S. CUSTOMARY UNITS

See Subsection 104.04 of the FP-14 for governing order of precedence.

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award X notice to proceed. The performance period is X mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) X YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 p.m. (hour) local time on 10/09/2025 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA

FAR (48 CFR) 53.236-1(d)

X

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

UEI.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

□ 10 U.S.C. 2304(c)( ) □ 41 U.S.C. 3304(a)( )

26. ADMINISTERED BY CODE: 27. PAYMENT WILL BE MADE BY

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

A-2

A-3

Item 8:

Item 9:

Item 11:

LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.

FOR GENERAL INFORMATION: E-mail us at CFLcontracts@dot.gov

FOR TECHNICAL INFORMATION (plans and specifications):

Questions must be submitted in writing by e-mail at CFLcontracts@dot.gov

COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date specified in SCR Subsection 108.01, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15

Performance and Payment Bonds-Construction (Clauses begin on page C-1) and Subsection 102.06 of the FP-14.

Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee

(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-

14. All bid guarantees must have original signatures with original corporate seals.

Item 19:

ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE

DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION

MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov/

Item 24:

SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the FP.

ESTIMATED PRICE: The price range of the project work is between $10,000,000 and $20,000,000.

mailto:CFLcontracts@dot.gov mailto:CFLcontracts@dot.gov https://sam.gov/

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and one option.

Before preparing the bid, carefully read the Solicitation Provisions and the following:

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.

• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

Pay Item 15401-0000, Contractor Testing

Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE.

Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary, page A-8 and A-10, therefore, included in the evaluation for award.

Bidders must also provide a stand alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory, at the end of each bid schedule. This price will not be factored into the evaluation for award.

The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.

A-4

A-5

Basis for Award

To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A and Option X. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available and the Contracting Officer determines the price to be reasonable.

Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A.

Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 90 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

Contract award will be based on price only and the government's intention is to award without discussions.

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

A-6

Project Schedule : Schedule Type : Base

Project

AMD# Line Item

Number

Pay Item

Number

Description Supplemental

Description

Quantity Unit Price Amount

A0010 15101-0000 MOBILIZATION ALL

A0030 15210-3000

CENTERLINE, VERIFICATION AND

STAKING 5.560

A0050 15215-3000

SURVEY AND STAKING, DRAINAGE

STRUCTURE 2.000

A0070 15225-0000

SLOPE, REFERENCE, AND

CLEARING AND GRUBBING

CONTROL

0.170

A0090 15236-2000

SURVEY CONTROL, GRADE

FINISHING 0.341

A0110 15301-0000 CONTRACTOR QUALITY CONTROL ALL

A0130 15401-0000

CONTRACTOR TESTING

ALL

A0150 15501-0000

CONSTRUCTION SCHEDULE

ALL

A0170 15701-0000

SOIL EROSION CONTROL

ALL

A0190 15720-0000

STORM WATER POLLUTION

PREVENTION PLAN ALL

A0210 15802-0000

WATERING FOR DUST CONTROL

ALL

A0230 20101-0000

CLEARING AND GRUBBING

6.600

A0250 20202-0000

SELECTIVE CLEARING

550.000

A0270 20301-0600

REMOVAL OF CATTLE GUARD

2.000

A0290 20301-0700

REMOVAL OF DELINEATOR

5.000

A0310 20301-1400

REMOVAL OF INLET

5.000

A0330 20301-1900

REMOVAL OF PIPE CULVERT

2.000

A0350 20301-2400

REMOVAL OF SIGN

20.000

A0370 20401-0000

ROADWAY EXCAVATION

2,500.000

A0390 20401-0000

ROADWAY EXCAVATION (DEEP PATCH)

630.000

A0410 20402-0000 SUBEXCAVATION 1,100.000

A0430 20441-0000 WASTE 1,970.000

A0450 25101-0200

PLACED RIPRAP, METHOD A,

CLASS 2 190.000

A0470 30202-2000

ROADWAY AGGREGATE, METHOD

2 2,750.000

A0490 30302-1000 DITCH RECONDITIONING 2,730.000

A0510 30502-0600

FULL DEPTH RECLAMATION WITH

CEMENT, 6-INCH DEPTH

68,600.000

A0530 30510-0000 CEMENTITIOUS MATERIAL 830.000

A0550 40101-5600

ASPHALT CONCRETE PAVEMENT,

GYRATORY MIX, 1/2-INCH OR 3/4-

INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION

ESAL

12,800.000

TON

TON

CUYD

CUYD

TON

LNFT

SQYD

EACH

EACH

CUYD

CUYD

CUYD

ACRE

SQYD

EACH

EACH

EACH

LPSM

LPSM

LPSM

LPSM

LPSM

MILE

EACH

MILE

MILE

LPSM

Contract Quantity Pay Items

No Contract Quantity Pay Items

Unit

LPSM

BID SCHEDULE

CA FLAP MOD 258(1) A

BLUE LAKE ROAD

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

(Contractor-Furnished Lab)

A-7

A0590 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 130.000

A0630 40601-0000 FOG SEAL 31.000

A0650 41101-1000 PRIME COAT, METHOD 1 84.000

A0670 41105-0000 BLOTTER 105.000

A0690 41201-0000 TACK COAT 32.000

A0710 60201-0600

18-INCH PIPE CULVERT

70.000

A0730 60201-0800

24-INCH PIPE CULVERT

92.000

A0750 60201-0900

30-INCH PIPE CULVERT

10.000

A0770 60403-0000

INLET CALTRANS

TYPE OMP

6.000

A0790 60706-0000

CLEANING DRAINAGE STRUCTURE

30.000

A0810 61701-4550

GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A WOOD POSTS 500.000

A0830 61702-1500

TERMINAL SECTION, TYPE MGS

TANGENT 2.000

A0850 61903-0700

CATTLE GUARD, 24 FEET

2.000

A0870 62201-0250

DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY 40.000

A0890 62201-0350 BACKHOE 40.000

A0910 62201-0850

WHEEL LOADER, 1 CUBIC YARD

MINIMUM RATED CAPACITY 40.000

A0930 62201-2850

MOTOR GRADER, 12 FOOT

MINIMUM BLADE 40.000

A0950 62201-3350

HYDRAULIC EXCAVATOR, 1 CUBIC

YARD MINIMUM CAPACITY 40.000

A0970 62301-0000 GENERAL LABOR 60.000

A0990 62302-1100

SPECIAL LABOR, HIRED SURVEY

SERVICES 20.000

A1010 62303-1000

SPECIAL LABOR, HIRED

TECHNICAL SERVICES

BIOLOGIST

ALL

A1050 62303-1000

SPECIAL LABOR, HIRED

TECHNICAL SERVICES

TRIBAL

MONITOR ALL

A1070 62402-0300

FURNISHING AND PLACING

TOPSOIL, 4-INCH DEPTH 6.700

A1090 62510-2000 SEEDING, HYDRAULIC METHOD 6.700

A1110 62515-2000 MULCHING, HYDRAULIC METHOD 6.700

A1130 62901-0000

ROLLED EROSION CONTROL

PRODUCT

1,640.000

A1150 63301-0000 SIGN SYSTEM 20.000

A1170 63308-2000

OBJECT MARKER, TYPE 2

116.000

A1190 63308-3000

OBJECT MARKER, TYPE 3

10.000

A1210 63402-0300

PAVEMENT MARKINGS, TYPE B,

SOLID 41.500

A1230 63402-0400

PAVEMENT MARKINGS, TYPE B,

BROKEN 1.600

A1250 63501-0000

TEMPORARY TRAFFIC CONTROL

ALL

EACH

MILE

MILE

LPSM

Submitted By: Schedule Total:

ACRE

ACRE

SQYD

EACH

EACH

HOUR

HOUR

LPSM

LPSM

ACRE

HOUR

HOUR

HOUR

HOUR

HOUR

EACH

EACH

LNFT

EACH

EACH

TON

TON

LNFT

LNFT

LNFT

TON

TON

TON

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

A0130 15401-0000 CONTRACTOR TESTING ALL LPSM $______________

(Government-Furnished Lab)BID ALTERNATE ITEM

SEE PAGE A-4

A-8

Project Schedule : Schedule Type : Option

Project

AMD# Line Item

Number

Pay Item

Number

Description Supplemental

Description

Quantity Unit Price Amount

X0010 15101-0000 MOBILIZATION ALL

X0020 15210-3000

CENTERLINE, VERIFICATION

AND STAKING 1.570

X0030 15215-3000

SURVEY AND STAKING,

DRAINAGE STRUCTURE 1.000

X0040 15301-0000

CONTRACTOR QUALITY

CONTROL ALL

X0050 15401-0000

CONTRACTOR TESTING

ALL

X0060 15501-0000

CONSTRUCTION SCHEDULE

ALL

X0070 15701-0000

SOIL EROSION CONTROL

ALL

X0080 15802-0000

WATERING FOR DUST

CONTROL

ALL

X0090 20301-0600

REMOVAL OF CATTLE GUARD

1.000

X0100 20301-1900

REMOVAL OF PIPE CULVERT

1.000

X0110 20301-2400

REMOVAL OF SIGN

6.000

X0120 30202-2000

ROADWAY AGGREGATE,

METHOD 2 400.000

X0130 30502-0600

FULL DEPTH RECLAMATION

WITH CEMENT, 6-INCH DEPTH 19,350.000

X0140 30510-0000

CEMENTITIOUS MATERIAL

180.000

X0150 40101-5600

ASPHALT CONCRETE

PAVEMENT, GYRATORY MIX,

1/2-INCH OR 3/4-INCH

NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3

MILLION ESAL

3,300.000

X0170 40105-1000

ANTISTRIP ADDITIVE, TYPE 1

33.000

X0190 40601-0000 FOG SEAL 9.000

X0200 41101-1000

PRIME COAT, METHOD 1

23.000

X0210 41105-0000 BLOTTER 30.000

X0220 41201-0000 TACK COAT 9.000

X0230 60202-0400

24-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT 56.000

TON

TON

TON

TON

LNFT

TON

SQYD

TON

TON

TON

LPSM

LPSM

EACH

EACH

EACH

MILE

EACH

LPSM

LPSM

LPSM

Contract Quantity Pay Items

No Contract Quantity Pay Items

Unit

LPSM

BID SCHEDULE

CA FLAP MOD 258(1) X

BLUE LAKE ROAD

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

(Contractor-Furnished Lab)

A-9

X0240 60211-0800

END SECTION FOR 24-INCH

EQUIVALENT DIAMETER ARCH

OR ELLIPTICAL PIPE CULVERT 2.000

X0250 60706-0000

CLEANING DRAINAGE

STRUCTURE 10.000

X0260 61903-0900

CATTLE GUARD, 28 FEET

1.000

X0270 62201-0250

DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY 20.000

X0280 62201-0350 BACKHOE 20.000

X0290 62201-0850

WHEEL LOADER, 1 CUBIC

YARD MINIMUM RATED

CAPACITY

20.000

X0300 62201-2850

MOTOR GRADER, 12 FOOT

MINIMUM BLADE 20.000

X0310 62201-3350

HYDRAULIC EXCAVATOR, 1

CUBIC YARD MINIMUM

CAPACITY 20.000

X0320 62301-0000 GENERAL LABOR 20.000

X0330 62302-1000

SPECIAL LABOR, HIRED

TECHNICAL SERVICES 20.000

X0340 62302-1100

SPECIAL LABOR, HIRED

SURVEY SERVICES 20.000

X0350 63301-0000 SIGN SYSTEM 6.000

X0360 63308-2000

OBJECT MARKER, TYPE 2

24.000

X0370 63308-3000

OBJECT MARKER, TYPE 3

10.000

X0380 63402-0300

PAVEMENT MARKINGS, TYPE

B, SOLID 6.500

X0390 63501-0000

TEMPORARY TRAFFIC

CONTROL ALL LPSM

Submitted By: Schedule Total:

HOUR

EACH

EACH

EACH

MILE

HOUR

HOUR

HOUR

HOUR

HOUR

EACH

EACH

EACH

HOUR

HOUR

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

X0050 15401-0000 CONTRACTOR TESTING ALL

(Government-Furnished Lab)

LPSM $______________

BID ALTERNATE ITEM

SEE PAGE A-4

A-10

Schedule Bid Total

Schedule A - Base $

Schedule Bid Total

Schedule X - Option $

BID SCHEDULE SUMMARY

Generated on : 08/07/2025 2:39 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Eric Grosskreuz

A-11

Partnering

A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.

CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.

A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.

Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection

103.05 Partnering of the FP-14. Costs of partnering would be in addition to the contract award amount.

Please indicate your desire to participate in a formal partnering meeting on this project.

( ) We would like to participate in a formal partnering meeting.

( ) We do not want to participate in a formal partnering meeting.

A-12

BUY AMERICAN ACT - CONSTRUCTION MATERIAL

UNDER TRADE AGREEMENTS

It is understood and agreed that the materials and components listed in Subpart 25.108 of the Federal Acquisition Regulations are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

Note to Contractor:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) and (d) and FAR Provision 52.225-12 Paragraph (b).

Material and/or Component

Nondomestic Material Unit of Measure

Quantity *Cost Delivered to Job Site

Comparable Domestic Material

Material and/or Component

Nondomestic Material Unit of Measure

Quantity *Cost Delivered to Job Site

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-13

HAZARDOUS MATERIALS

The following information and any applicable supporting data is required under FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, for all hazardous materials that the offeror identifies in Paragraph (b) of the FAR Clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material Identification Number

BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES

See FAR Provision 52.223-1 Biobased Product Certification and 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts for usage, certification, and reporting requirements.

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency's Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

A-14

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0001

Expiration Date: 1/31/2027 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of

1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT

OF BID

PRICE

20%

AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER

6982AF25R000017 MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

00 FOR (Construction, Supplies or

Services) Construction

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1. 2. 3.

Corporate Seal

(Seal) (Seal) (Seal)

NAME(S) &

TITLE(S)

(Typed)

1. 2. 3.

INDIVIDUALSURETY(IES)

SIGNATURE(S)

1.

(Seal) 2.

(Seal)

NAME(S)

(Typed)

1. 2.

CORPORATE SURETY(IES)

SU

RE

TY

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (REV. 10/2023)

Previous edition is NOT usable Prescribed by GSA - FAR (48 CFR) 53.228(a)

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL PARTNERSHIP JOINT VENTURE

CORPORATION OTHER (Specify)

STATE OF INCORPORATION

B-1

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

C

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S ) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

D NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

RE

TY

E

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

RE

F

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

RE

G

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITL E(S)

(Typed)

1. 2.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4.(a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

STANDARD FORM 24 (REV. 10/2023) BACK

B-2

B-3

Task Order Specific Solicitation Provisions

52.204-8 Annual Representations and Certifications. (JAN 2025)(DEVIATION FEB 2025)

52.217-5 Evaluation of Options (JUL 1990)

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

52.223-1 Bio based Product Certification (MAY 2024)(DEVIATION FEB 2025)

As required by the Farm Security and Rural Investment Act of 2002 ( 7 U.S.C. 8101(4)) and the Energy Policy Act of 2005 ( 7 U.S.C. 8102(a)(2)(F)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) [at https://www.biopreferred.gov/resources/categories.html]) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

(End of provision)

52.228-1 Bid Guarantee. (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds -

(1) To unsuccessful bidders as soon as practicable after the opening of bids;

and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be twenty (20%) percent of the bid price https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8101&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim

B-4 or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 Service of Protest. (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Mr. Ryan Phillips Acquisitions Branch Chief Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include

B-5 blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far

(End of provision)

52.252-3 Alterations in Solicitation. (APR 1984)

Portions of this solicitation are altered as follows: NONE

(End of provision)

52.252-5 Authorized Deviations in Provisions. (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b)The use in this solicitation or contract of any Revolutionary FAR Overhaul (RFO) (48 CFR All Changed Chapters, https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52) ) and the Department of Transportation Regulation (TAR) (48 CFR, Chapter 12) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision) http://www.acquisition.gov/far file://cflcadd4.cflhd.local/projects/CD_Template/Provs%20and%20Clauses/,%20https:/www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 file://cflcadd4.cflhd.local/projects/CD_Template/Provs%20and%20Clauses/,%20https:/www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

C-1

Task Order Specific Contract Clauses

52.204-1 Approval of Contract (DEC 1989)

This contract is subject to the written approval of the Acquisitions Branch Chief and shall not be binding until so approved.

(End of Clause)

52.211-12 Liquidated Damages - Construction. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $ 4,800.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY

2024)(DEVIATION FEB 2025)

(a) Definitions. As used in this clause—

Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. ( 7 U.S.C. 8101)(7

CFR 3201.2) 7 CFR 4270.2)

USDA-designated product category means a generic grouping of products that are or can be made with biobased materials—

(1) That are listed by USDA in a procurement guideline ( 7 CFR part 3201, subpart B);

available at https://www.biopreferred.gov/resources/categories.html; and

(2) For which USDA has provided purchasing recommendations (available at https://www.biopreferred.gov ) [ or 7 CFR part 4270]).

https://www.ecfr.gov/current/title-7/part-3201/subpart-B https://www.biopreferred.gov/

C-2

(b) The Contractor shall report to https://www.sam.gov, with a copy to the Contracting Officer, on…