CA FLAP CR36(1) Hammonton-Smartsville Road

Award Notice Posted

Solicitation number
DTFH6816B00003
Agency
Awarded
to Lamon Construction Company, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00015 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
West of South Golden Parkway to the Hammonton-Smartsville Road/Chuck Yeager Road intersection, California, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

IFB PROJECT DETAILS: CA FLAP CR36(1), Hammonton-Smartsville Road; DTFH6815B00020 

The Hammonton-Smartsville Road project is located in the center-eastern limits of Yuba County, California. This project will provide resurfacing, restoration, and rehabilitation to 0.97 miles of roadway from just west of South Golden Parkway to the Hammonton-Smartsville Road/Chuck Yeager Road intersection. There will be a bid option to extend the project 0.14 miles east to include improvements to the intersection, and replacement of the existing bridge just east of the intersection with a reinforced concrete box culvert. In either case, work will be continuous for entire length of the project, with no suspensions.


The major work elements include full-depth reclamation of the existing road to a depth of six inches, and three inches of asphalt surfacing on a twelve-inch aggregate base. Traffic is consistently heavy all year round, with a current ADT of 2726. There will be up to 15 minute delays during construction. There will be no road closures. Weather conditions typically allow construction to commence in early Spring so as to take advantage of the dry summer construction season.


The project will include drainage and safety improvements, construction of a soil nail wall for slope stabilization, and MSE wall construction.


The primary work items are soil nail wall, MSE wall, subexcavation, full depth reclamation, aggregate base, asphalt pavement, reinforced concrete box culvert, drainage improvements, signing, and pavement markings. Significant quantities for the overall project include:


Line Item Unit Est. Quantity


Subexcavation CUYD 1,700


Full Depth Reclamation SQYD 16,350


Roadway Aggregate TON 8,550


Hot Asphalt Conc. Pavem't TON 7,300


Soil Nail Wall SQFT 1375


MSE Wall SQFT 1584


Pavement Markings LF 28,000


Reinforced Concrete Box Culvert LF 58


24-inch Pipe Culvert LF 275


It is anticipated that this project will be advertised on November 17, 2015. The contract range for this project is between $2 and $4 million. Construction is expected to start in February, 2016 and take approximately 5 months to complete.

Update #2 ·

IFB PROJECT DETAILS: CA FLAP CR36(1), Hammonton-Smartsville Road

The Hammonton-Smartsville Road project is located in the center-eastern limits of Yuba County, California. This project will provide resurfacing, restoration, and rehabilitation to 0.97 miles of roadway from just west of South Golden Parkway to the Hammonton-Smartsville Road/Chuck Yeager Road intersection. There will be a bid option to extend the project 0.14 miles east to include improvements to the intersection, and replacement of the existing bridge just east of the intersection with a reinforced concrete box culvert. In either case, work will be continuous for entire length of the project, with no suspensions.


The major work elements include full-depth reclamation of the existing road to a depth of six inches, and three inches of asphalt surfacing on a twelve-inch aggregate base. Traffic is consistently heavy all year round, with a current ADT of 2726. There will be up to 15 minute delays during construction. There will be no road closures. Weather conditions typically allow construction to commence in early Spring so as to take advantage of the dry summer construction season.


The project will include drainage and safety improvements, construction of a soil nail wall for slope stabilization, and MSE wall construction.


The primary work items are soil nail wall, MSE wall, subexcavation, full depth reclamation, aggregate base, asphalt pavement, reinforced concrete box culvert, drainage improvements, signing, and pavement markings. Significant quantities for the overall project include:


Line Item Unit Est. Quantity


Subexcavation CUYD 1,700


Full Depth Reclamation SQYD 16,350


Roadway Aggregate TON 8,550


Hot Asphalt Conc. Pavem't TON 7,300


Soil Nail Wall SQFT 1375


MSE Wall SQFT 1584


Pavement Markings LF 28,000


Reinforced Concrete Box Culvert LF 58


24-inch Pipe Culvert LF 275


It is anticipated that this project will be advertised on November 17, 2015. The contract range for this project is between $2 and $4 million. Construction is expected to start in February, 2016 and take approximately 5 months to complete.

Update #1 ·

THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS NOVEMBER 17, 2015. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

PROJECT DETAILS: CA FLAP CR36(1), Hammonton-Smartsville Road

The Hammonton-Smartsville Road project is located in the center-eastern limits of Yuba County, California. This project will provide resurfacing, restoration, and rehabilitation to 0.97 miles of roadway from just west of South Golden Parkway to the Hammonton-Smartsville Road/Chuck Yeager Road intersection. There will be a bid option to extend the project 0.14 miles east to include improvements to the intersection, and replacement of the existing bridge just east of the intersection with a reinforced concrete box culvert. In either case, work will be continuous for entire length of the project, with no suspensions.


The major work elements include full-depth reclamation of the existing road to a depth of six inches, and three inches of asphalt surfacing on a twelve-inch aggregate base. Traffic is consistently heavy all year round, with a current ADT of 2726. There will be up to 15 minute delays during construction. There will be no road closures. Weather conditions typically allow construction to commence in early Spring so as to take advantage of the dry summer construction season.


The project will include drainage and safety improvements, construction of a soil nail wall for slope stabilization, and MSE wall construction.


The primary work items are soil nail wall, MSE wall, subexcavation, full depth reclamation, aggregate base, asphalt pavement, reinforced concrete box culvert, drainage improvements, signing, and pavement markings. Significant quantities for the overall project include:


Line Item Unit Est. Quantity


Subexcavation CUYD 1,700


Full Depth Reclamation SQYD 16,350


Roadway Aggregate TON 8,550


Hot Asphalt Conc. Pavem't TON 7,300


Soil Nail Wall SQFT 1375


MSE Wall SQFT 1584


Pavement Markings LF 28,000


Reinforced Concrete Box Culvert LF 58


24-inch Pipe Culvert LF 275


It is anticipated that this project will be advertised on November 17, 2015. The contract range for this project is between $2 and $4 million. Construction is expected to start in February, 2016 and take approximately 5 months to complete.

Files

File Type Posted
Bid_Tabs_Summary.pdf PDF
Bid_Opening_Summary.pdf PDF
Q A_12-17-15.pdf PDF
Q A.pdf PDF
A001_SF_30.pdf PDF
Appendix_C.pdf PDF
DTFH6815B00020_IFB.pdf PDF
Appendix_B.pdf PDF
Physical_Data_-_Geotech_and_Pavement_Report.pdf PDF
Appendix_A.pdf PDF
Appendix_D.pdf PDF
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors