A001_SF_30.pdf
PDF 3 MB Posted
- Attached to
- CA FLAP CR36(1) Hammonton-Smartsville Road
- Solicitation number
- DTFH6816B00003
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_Summary.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Q A_12-17-15.pdf | ||
| Q A.pdf | ||
| Physical_Data_-_Geotech_and_Pavement_Report.pdf | ||
| Appendix_A.pdf | ||
| DTFH6815B00020_IFB.pdf | ||
| Appendix_C.pdf | ||
| Appendix_D.pdf | ||
| Appendix_B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 75
A001 12/09/2015 CA FLAP CR36(1)
6905001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENU, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: MEGAN MAVIS
DTFH6815B00020
11/17/2015
0*
✔ * See Below
Invitation for Bid
Amendment A001:
-Replace page A-iii with new A-iii bearing a revision date of December 09, 2015. This changes the Request for Technical Information date to December 16, 2015.
-Replace page A-1 with new A-1 bearing a revision date of December 09, 2015. This changes the bid due date from 12/17/2015 to 12/29/2015 in block 13.A.
-Remove pages A-6 through A-19 and replace with pages A-6 through A-17 bearing a revision date of December 09, 2015.
-Remove Davis Bacon Wage Determination pages D-1 through D-43 and replace with pages D-1 through D-43 bearing a revision date of December 09, 2015. This replaces General Decision Number "CA150009 11/06/2015 CA9" with "CA150009 11/27/2015 CA9."
-Remove Special Contract Requirements (SCRs) pages E-46 though E-53 and replace with pages E-46 through E-55 bearing a revision date of December 09, 2015.
-Remove Appendix A Plans sheet number: A2, B3, B5, and B12 and replace with sheet number A2, B3, B5, and B12 bearing a revision date of December 09, 2015.
-Add Appendix A Plans sheet W25-W27 bearing a revision date of December 09, 2015 after sheet number W24.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
NOTICE TO BIDDERS
A-iii
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Block 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON DECEMBER 8, 2015
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
II. Post Award Information.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. To view and download a sample plan for subcontracting requirements, visit http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A001 December 09, 2015 mailto:CFLContracts@dot.gov http://www.fbo.gov/ http://www.cflhd.gov/contracting/construction/ReferenceLinks.cfm http://web.sba.gov/subnet/ megan.mavis Line megan.mavis Typewritten Text megan.mavis Typewritten Text
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6815B00020
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
11/17/15
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CA FLAP CR36(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
ATTN: MEGAN MAVIS, CONTRACT SPECIALIST
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
CONSTRUCTION OF CA FLAP CR36(1) HAMMONTON-SMARTSVILLE ROAD, IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. * Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. Denver local time on 12/17/2015 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(d)
X
A001 December 09, 2015 megan.mavis Line megan.mavis Typewritten Text 12/29/2015 megan.mavis Typewritten Text megan.mavis Typewritten Text megan.mavis Typewritten Text megan.mavis Typewritten Text megan.mavis Typewritten Text megan.mavis Typewritten Text
B I D S C H E D U L E Schedule A
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 ALL LPSM $
15206-0000
Line A0040 0.970 MILE $ $
15214-2000
Line A0060 ALL LPSM $
15215-3000
Line A0080 4 EACH $ $
15215-5000
Line A0100 1 EACH $ $
15216-2000
Line A0120 1.930 MILE $ $
15301-0000
Line A0140 ALL LPSM $
15401-0000
Line A0160 ALL LPSM $
15501-0000
Line A0180 ALL LPSM $
15705-0100
Line A0200 3,700 LNFT $ $
15705-1400
Line A0220 240 LNFT $ $
15706-0200
Line A0240 28 EACH $ $
15706-1600
Line A0260 1 EACH $ $
15802-0000
Line A0280 ALL LPSM $
20103-0000
Line A0300 16,700 SQYD $ $
20220-1000
Line A0320 8 EACH $ $
20301-0200
Line A0340 9 EACH $ $
20301-0700
REMOVAL, INDIVIDUAL TREE
REMOVAL OF BOULDER
REMOVAL OF DELINEATOR
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, RETAINING WALL
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, BOX CULVERT
SURVEY AND STAKING, GRADE FINISHING STAKES
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM
Schedule Total: ________________________
Submitted by: _________________________
A001 December 09, 2015A-6
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
Line A0360 11 EACH $ $
20301-1200
Line A0380 2 EACH $ $
20301-1900
Line A0400 4 EACH $ $
20301-2400
Line A0420 15 EACH $ $
20301-3600
Line A0440 240 EACH $ $
20302-0700
Line A0460 400 LNFT $ $
20302-1200
Line A0480 254 LNFT $ $
20303-1600
Line A0500 2,150 SQYD $ $
20303-2200
Line A0520 2,150 SQYD $ $
20401-0000
Line A0540 4,400 CUYD $ $
20402-0000
Line A0560 1,700 CUYD $ $
20441-0000
Line A0580 1,601 CUYD $ $
25101-2200
Line A0600 35 CUYD $ $
25120-2200
Line A0620 140 LNFT $ $
25501-0000
Line A0640 1,584 SQFT $ $
25701-0200
Line A0660 ALL LPSM $
25901-0000
Line A0680 700 LNFT $ $
25902-0000
Line A0700 1,375 SQFT $ $
RIPRAP DITCH, METHOD B, CLASS 2
MECHANICALLY STABILIZED EARTH WALL
CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL DESIGN
REMOVAL OF HEADWALL
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF PAVEMENT, ASPHALT, 6-INCH DEPTH
ROADWAY EXCAVATION
SUBEXCAVATION
WASTE
PLACED RIPRAP, METHOD B, CLASS 2
REMOVAL OF RAISED PAVEMENT MARKER
REMOVAL OF FENCE
REMOVAL OF GUARDRAIL
SOIL NAIL
SOIL NAIL RETAINING WALL
December 09, 2015A-7
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
25903-0000
Line A0720 2 EACH $ $
30101-2000
Line A0740 6,750 TON $ $
30402-5300
Line A0760 14,550 SQYD $ $
40101-5600
Line A0780 6,265 TON $ $
40105-3000
Line A0800 60 TON $ $
40601-0000
Line A0820 9 TON $ $
41102-1000
Line A0840 22,670 SQYD $ $
41105-0000
Line A0860 31 TON $ $
41201-0000
Line A0880 9 TON $ $
60201-0800
Line A0900 275 LNFT $ $
60210-0800
Line A0920 7 EACH $ $
60220-0350
Line A0940 24 LNFT $ $
60404-0000
Line A0960 1 EACH $ $
60409-0200
Line A0980 1 EACH $ $
60704-0000
Line A1000 1 EACH $ $
60901-2300
Line A1020 3,350 LNFT $ $
60908-1000
Line A1040 750 SQYD $ $
61701-4550
AGGREGATE BASE GRADING D
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
VERIFICATION TEST NAIL
INLET TOP, METAL FRAME AND GRATE, FLH TYPE B
CLEANING CULVERT IN PLACE
CURB, ASPHALT, 6-INCH DEPTH
PAVED DITCH, ASPHALT
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
BLOTTER
TACK COAT
24-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
4 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
CATCH BASIN
December 09, 2015A-8
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
Line A1060 550 LNFT $ $
61702-1500
Line A1080 3 EACH $ $
61702-1600
Line A1100 3 EACH $ $
61901-0100
Line A1120 100 LNFT $ $
62201-0200
Line A1140 30 HOUR $ $
62201-0550
Line A1160 30 HOUR $ $
62201-0950
Line A1180 30 HOUR $ $
62201-2850
Line A1200 30 HOUR $ $
62201-3350
Line A1220 40 HOUR $ $
62301-0000
Line A1240 40 HOUR $ $
62302-1000
Line A1260 40 HOUR $ $
62302-1100
Line A1280 40 HOUR $ $
62511-2000
Line A1300 5,500 SQYD $ $
62516-2000
Line A1320 5,500 SQYD $ $
62520-0000
Line A1340 1.1 ACRE $ $
62901-0700
Line A1360 2,600 SQYD $ $
63301-0000
Line A1380 15 EACH $ $
63308-5000
Line A1400 12 EACH $ $
TERMINAL SECTION, TYPE MGS TANGENT
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
TERMINAL SECTION, TYPE MGS FLARED
FENCE, WOVEN WIRE
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
FERTILIZER
ROLLED EROSION CONTROL PRODUCT, TYPE 2.C
SIGN SYSTEM
OBJECT MARKER, TYPE CALTRANS TYPE P
December 09, 2015A-9
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63309-0000
Line A1420 40 EACH $ $
63401-1500
Line A1440 23,750 LNFT $ $
63405-0050
Line A1460 6 EACH (CQ) $ $
63406-0400
Line A1480 500 EACH $ $
63502-0600
Line A1500 2 EACH $ $
63502-1050
Line A1520 100 EACH $ $
63502-1300
Line A1540 100 EACH $ $
63502-1400
Line A1560 20 EACH $ $
63502-1600
Line A1580 4 EACH $ $
63502-2000
Line A1600 3 EACH (CQ) $ $
63503-0700
Line A1620 10,700 LNFT $ $
63504-1000
Line A1640 350 SQFT (CQ) $ $
63506-0500
Line A1660 1,200 HOUR $ $
63506-0600
Line A1680 400 HOUR $ $
64620-0400
Line A1700 1 EACH $ $
PAVEMENT MARKINGS, SYMBOLS
RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL
DELINEATOR
PAVEMENT MARKINGS, TYPE H, SOLID
REMOVE AND RESET MAILBOX
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
A001 December 09, 2015A-10 megan.mavis Typewritten Text Schedule A Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
megan.mavis Polygon
Option X
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000
Line X0020 ALL LPSM $
15206-0000
Line X0040 0.140 MILE $ $
15215-5000
Line X0060 1 EACH $ $
15216-2000
Line X0080 0.280 MILE $ $
15301-0000
Line X0100 ALL LPSM $
15401-0000
Line X0120 ALL LPSM $
15501-0000
Line X0140 ALL LPSM $
15702-1000
Line X0160 ALL LPSM $
15705-0100
Line X0180 600 LNFT $ $
15705-1400
Line X0200 135 LNFT $ $
20103-0000
Line X0220 2,100 SQYD $ $
20301-0400
Line X0240 1 EACH $ $
20301-1900
Line X0260 1 EACH $ $
20301-2400
Line X0280 7 EACH $ $
20301-3600
Line X0300 50 EACH $ $
20401-0000
Line X0320 1,180 CUYD $ $
20441-0000
Line X0340 840 CUYD $ $
21101-1000
ROADWAY EXCAVATION
WASTE
ROADWAY OBLITERATION, METHOD 1
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, BOX CULVERT
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
REMOVAL OF PIPE CULVERT
REMOVAL OF SIGN
REMOVAL OF RAISED PAVEMENT MARKER
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
CLEARING AND GRUBBING
REMOVAL OF BRIDGE
Schedule Total: ________________________
Submitted by: _________________________
December 09, 2015A-11
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
Line X0360 200 SQYD $ $
25101-2200
Line X0380 5 CUYD $ $
25101-2300
Line X0400 25 CUYD $ $
30101-2000
Line X0420 1,800 TON $ $
30402-5300
Line X0440 1,800 SQYD $ $
40101-5600
Line X0460 1,050 TON $ $
40105-3000
Line X0480 11 TON $ $
40601-0000
Line X0500 2 TON $ $
41102-1000
Line X0520 3,700 SQYD $ $
41105-0000
Line X0540 5 TON $ $
41201-0000
Line X0560 2 TON $ $
60103-0000
Line X0580 2 EACH $ $
60201-0800
Line X0600 85 LNFT $ $
60210-0800
Line X0620 2 EACH $ $
60220-3970
Line X0640 58 LNFT $ $
60901-2300
Line X0660 55 LNFT $ $
60902-1000
Line X0680 33 LNFT $ $
60908-1000
Line X0700 15 SQYD $ $
END SECTION FOR 24-INCH PIPE CULVERT
12 FEET SPAN, 5 FEET RISE, PRECAST REINFORCED CONCRETE BOX CULVERT
CURB, ASPHALT, 6-INCH DEPTH
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
AGGREGATE BASE GRADING D
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
CONCRETE, HEADWALL
24-INCH PIPE CULVERT
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
PAVED DITCH, ASPHALT
December 09, 2015A-12
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
61701-4550
Line X0720 50 LNFT $ $
61702-1500
Line X0740 3 EACH $ $
61702-1600
Line X0760 1 EACH $ $
62302-1100
Line X0780 10 HOUR $ $
62511-2000
Line X0800 1,000 SQYD $ $
62516-2000
Line X0820 1,000 SQYD $ $
62520-0000
Line X0840 0.200 ACRE $ $
63301-0000
Line X0860 6 EACH $ $
63308-5000
Line X0880 4 EACH $ $
63309-0000
Line X0900 10 EACH $ $
63401-1500
Line X0920 4,500 LNFT $ $
63405-0050
Line X0940 2 EACH $ $
63406-0400
Line X0960 70 EACH $ $
63501-2000
Line X0980 ALL LPSM $
63502-2100
Line X1000 3 EACH $ $
63503-0400
Line X1020 425 LNFT $ $
63503-0700
Line X1040 1,600 LNFT $ $
63504-1000
TERMINAL SECTION, TYPE MGS TANGENT
TERMINAL SECTION, TYPE MGS FLARED
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
FERTILIZER
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (3-way)
TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SIGN SYSTEM
OBJECT MARKER, TYPE CALTRANS TYPE P
DELINEATOR
PAVEMENT MARKINGS, TYPE H, SOLID
PAVEMENT MARKINGS, SYMBOLS
RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
A001 December 09, 2015A-13
Polygon
Project No: CA FLAP CR36(1)
Project Name: Hammonton-Smartsville Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
Line X1060 40 SQFT $ $
63506-0500
Line X1080 450 HOUR $ $
63506-0600
Line X1100 200 HOUR $ $
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
A001 December 09, 2015A-14 megan.mavis Typewritten Text Schedule (Option) X Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
Polygon
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base
Schedule X - Option
Total - Schedules
Submitted By: ________________________________
Bid Schedule
Project No:CA FLAP CR36(1)
Project Name:Hammonton-Smartsville Road
A-15
December 09, 2015
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subpart 25.1 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-16
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
A-17
General Decision Number: CA150009 11/27/2015 CA9
Superseded General Decision Number: CA20140009
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.
BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);
DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 01/16/2015 2 01/23/2015 3 01/30/2015 4 02/13/2015 5 02/20/2015 6 03/27/2015 7 04/17/2015 8 05/01/2015 9 06/05/2015 10 06/19/2015 11 07/10/2015 12 07/17/2015 13 07/31/2015 14 08/14/2015 15 08/28/2015 16 09/25/2015 17 10/16/2015 18 11/06/2015 19 11/27/2015
ASBE0016-001 01/01/2014
AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &
D-1
SONOMA COUNTIES
AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 57.15 18.72 Area 2......................$ 44.05 18.62
ASBE0016-007 01/01/2015
AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO
& YUBA COUNTIES
AREA 2: MARIN & NAPA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
AREA 1......................$ 28.30 7.75
AREA 2......................$ 32.38 7.75
BOIL0549-002 01/01/2013
Rates Fringes
BOILERMAKER
(1) Marin & Solano Counties.$ 42.06 33.43
(2) Remaining Counties......$ 38.37 31.32
BRCA0003-001 08/01/2013
Rates Fringes
MARBLE FINISHER..................$ 28.05 14.01
BRCA0003-004 05/01/2015
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
D-2
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES
AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY
COUNTIES
Rates Fringes
BRICKLAYER
AREA 1......................$ 37.31 19.73
AREA 2......................$ 39.99 24.75
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-008 07/01/2013
Rates Fringes
TERRAZZO FINISHER................$ 33.15 13.93
TERRAZZO WORKER/SETTER...........$ 39.95 24.39
BRCA0003-010 04/01/2015
Rates Fringes
TILE FINISHER
Area 1......................$ 23.32 10.43 Area 2......................$ 23.31 12.90 Area 3......................$ 23.49 12.77 Area 4......................$ 22.99 12.25 Tile Layer Area 1......................$ 39.42 12.42 Area 2......................$ 37.31 14.19 Area 3......................$ 41.87 14.24 Area 4......................$ 38.74 14.19
AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma
BRCA0003-014 08/01/2013
Rates Fringes
MARBLE MASON.....................$ 39.30 22.48
D-3
CARP0034-001 07/01/2014
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician...........$ 39.60 30.73 Diver standby...............$ 44.56 30.73 Diver Tender................$ 43.56 30.73 Diver wet...................$ 89.12 30.73 Manifold Operator (mixed gas)........................$ 48.56 30.73 Manifold Operator (Standby).$ 43.56 30.73
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2014
Rates Fringes
Piledriver.......................$ 40.60 30.73
CARP0035-001 08/01/2015
AREA 1: MARIN, NAPA, SOLANO & SONOMA
AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO
AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,
D-4
SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 42.40 26.42 Area 3......................$ 37.02 26.42 Area 4......................$ 35.67 26.42 Drywall Stocker/Scrapper Area 1......................$ 21.20 14.60 Area 3......................$ 18.51 14.60 Area 4......................$ 17.84 14.60
CARP0035-009 07/01/2015
Marin County
Rates Fringes
CARPENTER
Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP0035-010 07/01/2014
AREA 1: Marin, Napa, Solano & Sonoma Counties
AREA 2: Monterey, San Benito and Santa Cruz
AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties
Rates Fringes
Modular Furniture Installer Area 1 Installer I................$ 23.36 18.31 Installer II...............$ 19.93 18.31 Lead Installer.............$ 26.81 18.81 Master Installer...........$ 31.03 18.81 Area 2 Installer I................$ 20.71 18.31 Installer II...............$ 17.76 18.31 Lead Installer.............$ 23.68 18.81 Master Installer...........$ 27.31 18.81 Area 3 Installer I................$ 19.76 18.31 Installer II...............$ 16.99 18.31 Lead Installer.............$ 22.56 18.81 Master Installer...........$ 29.58 18.81
D-5
CARP0046-001 07/01/2015
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 36.67 25.98 Journeyman Carpenter........$ 36.52 25.98 Millwright..................$ 39.02 27.38
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-002 07/01/2015
Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 35.32 25.98 Journeyman Carpenter........$ 35.17 25.98 Millwright..................$ 37.67 27.38
CARP0152-003 07/01/2014
Amador County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 33.27 27.53 Journeyman Carpenter........$ 33.12 27.53 Millwright..................$ 35.62 29.12
D-6
CARP0180-001 07/01/2015
Solano County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP0751-001 07/01/2015
Napa and Sonoma Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP1599-001 07/01/2015
Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 35.32 25.98 Journeyman Carpenter........$ 35.17 25.98 Millwright..................$ 37.67 27.38
ELEC0180-001 06/01/2015
NAPA AND SOLANO COUNTIES
Rates Fringes
CABLE SPLICER....................$ 50.97 3%+20.13
D-7
ELECTRICIAN......................$ 45.31 21.98
ELEC0180-003 06/01/2015
NAPA AND SOLANO COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 33.32 16.29 Technician..................$ 35.66 3%+15.30
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0340-002 12/08/2014
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,
NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES
Rates Fringes
Communications System Sound & Communications Installer...................$ 27.85 13.80 Sound & Communications Technician..................$ 33.42 13.80
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
D-8
Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.
B. FIRE ALARM SYSTEMS
Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0340-003 12/01/2013
ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES
Rates Fringes
ELECTRICIAN
Remaining area..............$ 39.06 18.54 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54
CABLE SPLICER: Receives 110% of the Electrician basic hourly
D-9 rate.
ELEC0401-005 11/01/2014
ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 37.50 15.14
ELEC0551-004 06/01/2015
MARIN AND SONOMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.20 16.97
ELEC0551-005 12/01/2014
MARIN & SONOMA COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 32.32 16.27 Technician..................$ 36.80 16.41
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0659-006 01/01/2015
DEL NORTE, MODOC and SISKIYOU COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.44 15.71
D-10
ELEC0659-008 02/01/2013
DEL NORTE, MODOC & SISKIYOU COUNTIES
Rates Fringes
Line Construction
(1) Cable Splicer...........$ 51.09 4%+13.30
(2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 45.62 4%+13.30
(3) Tree Trimmer............$ 32.07 4%+9.80
(4) Line Equipment Man......$ 45.62 4%+9.80
(5) Powdermen, Jackhammermen...............$ 34.22 4%+9.80
(6) Groundman...............$ 31.31 4%+9.80
ELEC1245-004 06/01/2015
ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 52.85 15.53
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32
(3) Groundman...............$ 32.28 14.03
(4) Powderman...............$ 47.19 14.06
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2015
Rates Fringes
ELEVATOR MECHANIC................$ 60.39 28.38
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0003-008 07/01/2013
Rates Fringes
D-11
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 40.53 27.81
(2) Dredge Dozer; Heavy duty repairman.............$ 35.57 27.81
(3) Booster Pump Operator; Deck Engineer; Deck mate;
Dredge Tender; Winch Operator...................$ 34.45 27.81
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 31.15 27.81
AREA 2:
(1) Leverman...............$ 42.53 27.81
(2) Dredge Dozer; Heavy duty repairman.............$ 37.57 27.81
(3) Booster Pump Operator; Deck Engineer; Deck mate;
Dredge Tender; Winch Operator...................$ 36.45 27.81
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 33.15 27.81
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2
AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
D-12
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
D-13
Area 2: Eastern part
ENGI0003-018 06/30/2014
"AREA 1" WAGE RATES ARE LISTED BELOW
"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 39.85 27.44
GROUP 2.....................$ 38.32 27.44
GROUP 3.....................$ 36.84 27.44
GROUP 4.....................$ 35.46 27.44
GROUP 5.....................$ 34.19 27.44
GROUP 6.....................$ 32.87 27.44
GROUP 7.....................$ 31.73 27.44
GROUP 8.....................$ 30.59 27.44
GROUP 8-A...................$ 28.38 27.44
OPERATOR: Power Equipment (Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 40.73 27.44 Oiler......................$ 33.76 27.44 Truck crane oiler..........$ 37.33 27.44
GROUP 2
Cranes.....................$ 38.97 27.44 Oiler......................$ 33.50 27.44 Truck crane oiler..........$ 37.04 27.44
GROUP 3
Cranes.....................$ 37.23 27.44 Hydraulic..................$ 32.87 27.44 Oiler......................$ 33.26 27.44 Truck Crane Oiler..........$ 36.77 27.44
GROUP 4
Cranes.....................$ 34.19 27.44 OPERATOR: Power Equipment (Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 41.07 27.44 Oiler......................$ 31.81 27.44 Truck crane oiler..........$ 34.09 27.44
GROUP 2
Lifting devices............$ 39.25 27.44 Oiler......................$ 31.54 27.44 Truck Crane Oiler..........$ 33.84 27.44
GROUP 3
Lifting devices............$ 37.57 27.44 Oiler......................$ 31.32 27.44 Truck Crane Oiler..........$ 33.55 27.44
GROUP 4
Lifting devices............$ 35.80 27.44
D-14
GROUP 5
Lifting devices............$ 34.50 27.44
GROUP 6
Lifting devices............$ 33.16 27.44 OPERATOR: Power Equipment (Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 41.70 27.44 Oiler......................$ 32.15 27.44 Truck Crane Oiler..........$ 34.38 27.44
GROUP 2
Cranes.....................$ 39.93 27.44 Oiler......................$ 31.88 27.44 Truck Crane Oiler..........$ 34.16 27.44
GROUP 3
Cranes.....................$ 38.45 27.44 Hydraulic..................$ 32.67 27.44 Oiler......................$ 31.66 27.44 Truck Crane Oiler..........$ 33.89 27.44
GROUP 4
Cranes.....................$ 36.43 27.44
GROUP 5
Cranes.....................$ 35.13 27.44 OPERATOR: Power Equipment (Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 35.95 27.44
GROUP 1-A..................$ 38.32 27.44
GROUP 2....................$ 34.59 27.44
GROUP 3....................$ 33.36 27.44
GROUP 4....................$ 32.22 27.44
GROUP 5....................$ 31.08 27.44
UNDERGROUND:
GROUP 1....................$ 35.85 27.44
GROUP 1-A..................$ 38.32 27.44
GROUP 2....................$ 34.59 27.44
GROUP 3....................$ 33.26 27.44
GROUP 4....................$ 32.12 27.44
GROUP 5....................$ 30.98 27.44
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
D-15 mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;
Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2
cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds.