Building 9201 Program Office
Closed Solicitation Posted
- Solicitation number
- W912BV19R0011
- Agency
- ENDIST Tulsa US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Tinker Air Force Base Oklahoma City, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Amendment 0005 is issued to incorporate revisions into the pricing schedule notes, proposal submission requirements and specifications..
Update #5 ·
Amendment 0004 is issued to add Attachments 1 through 6 in Section 00 22 11..
Update #4 ·
Amendment 0003 is issued to extend the proposal due date from 2:00PM CST on 18 APR 2019 to 2:00PM CST on 25 APR 2019. It also incorporates additions and revisions to the specifications. .
Update #3 ·
Amendment 0002 is issued to extend extend the proposal due date from 2:00PM CST on 8 APR 2019 to 2:00PM CST on 18 April 2019. It also incorporates information pertaining to the FF & E data sheets and material referenced in Section 12 59 00, Systems Furniture.
.
Update #2 ·
Amendment 0001 is issued to update FAR Clause 52.236-27, Site Visit - Construction..
Update #1 ·
This project will be a single-phase design-bid-build construction project for the Building 9201 Program Office. The existing building was constructed in approximately 2001, and originally served as a General Motors assembly plant. After sitting vacant for approximately ten years, the building shall be renovated into the program office. The existing three-story building is approximately 875,000 gross square feet; however, the Program Office will only occupy 82,025 square feet and is limited to a portion of the ground floor. The project scope of work is primarily office space, conference rooms, server rooms, a dock/receiving area, and IT-related activities. In addition to meeting the program, security, and acoustic requirements for the project, making repairs and modifications to the existing building shall be undertaken. Modifications to the exterior of the building include new EPDM roofing system over the program office location and metal wall panel repair. Following decommissioning of the automotive assembly plant, a certain amount of material salvage occurred. However, a significant amount of demolition and deconstruction of existing materials, equipment, and framing remains. This includes but is not limited to the ovens and support framing located on the third-floor mezzanine, substantial manufacturing-specific steel apparatuses, and a variety of smaller non-structural items specific to the auto assembly plant. Although the scope of new construction is limited to a portion of the first floor, the demolition scope for phase one shall include all three floors, from column lines 22 to 33. There are multiple locations where large openings in the floors shall require infill. There are also locations where large pits in the ground floor shall be infilled and new slabs poured to create an even and smooth floor surface. There are several locations where small curbs, uneven floors, and protruding bolts can be found on the existing floor. The existing curbs, bolts, uneven locations in the slabs shall be scraped, ground, infilled, patched and leveled to a condition suitable for new flooring materials. In general, all existing materials which are not part of the structural frame, exterior envelope, exit stairs, or are not otherwise noted to be retained or reused, shall be demolished.
In accordance with DFARs 236.204, the estimated construction magnitude for this project is between $25,000,000 and $100,000,000.
The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $36.5M. It will be solicited as an unrestricted acquisition.
Estimated duration of the construction phase of this project is 665 calendar days.
No reimbursement will be made for any costs associated with submitting a proposal.
.
Attachments
| File | Type | Posted |
|---|---|---|
| W912BV19R0011-0005.pdf | ||
| W912BV19R0011-0004.pdf | ||
| W912BV19R0011-0003.pdf | ||
| W912BV19R0011-0002.pdf | ||
| __AM2_TKR_PROGRAM_OFFICE.pdf | ||
| W912BV19R0011_-_Site_Visit_Attendees.pdf | ||
| W912BV19R0011-0001.pdf | ||
| TKR_B9201_SOLICITATION_Dwg_Vol_II_APPX_B.pdf | ||
| W912BV19R0011.pdf | ||
| TKR_B9201_SOLICITATION_Dwg_Vol_I_APPX_A.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Building 9201 Program Office | Solicitation | |
| Building 9201 Program Office - Phase I | Pre-Solicitation | |
| Building 9201 Program Office - Phase I | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity