W912BV19R0011-0004.pdf

PDF 604 KB Posted

Attached to
Building 9201 Program Office Federal contract opportunity
Solicitation number
W912BV19R0011
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Building 9201 Program Office, newest first.
File Type Posted
W912BV19R0011-0005.pdf PDF
W912BV19R0011-0003.pdf PDF
W912BV19R0011-0002.pdf PDF
__AM2_TKR_PROGRAM_OFFICE.pdf PDF
W912BV19R0011_-_Site_Visit_Attendees.pdf PDF
W912BV19R0011-0001.pdf PDF
TKR_B9201_SOLICITATION_Dwg_Vol_II_APPX_B.pdf PDF
W912BV19R0011.pdf PDF
TKR_B9201_SOLICITATION_Dwg_Vol_I_APPX_A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912BV19R0011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

TAFB B9201 PROGRAM OFFICE

Amendment 0004 hereby incorporates Attachments 3, 4 and 5 in Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria and Basis of Aw ard.

The proposal deadline remains unchanged. All other terms and conditions remain unchanged.

Contract Specialist: Julie S. Hill, 918-669-7699 or julie.s.hill@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

1 32

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV19R0011

X 9B. DATED (SEE ITEM 11)

07-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Apr-2019

CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION 00 22 11 – ATTACHMENT 1

COMPANY SPECIALIZED EXPERIENCE - CONSTRUCTION

Provide the following information to show examples of projects your company constructed within the last five (5) years indicating experience with projects of similar type and scope. Use one form per project.

1. Type of Facility Represented __________________________________________________________________

2. Your Firm’s Name _________________________________________________________________________

3. Name of Project and Contract Number _________________________________________________________

4. Location of Project _________________________________________________________________________

5. Project Contract Type _______________________________________________________________________

6. Owner ___________________________________________________________________________________

7. General Scope of Construction Project (address how this relates to this solicitation)

8. Your Role (Prime, Joint Venture, or Subcontractor) and Work Your Company Self-Performed (also include any proposed team members that were directly involved in this project, including work performed, roles and responsibilities) :

9. Provide a list of the management team and their responsibility at a minimum include Project Manager, Quality Control Representative, and Construction Superintendent. __________________________________________

10. Construction Cost __________________________________________________________________________ (For prime, total contract and subcontracted amounts; for sub total contract and your subcontract amounts)

11. Extent and Type of Work You Subcontracted Out _________________________________________________

12. Dates Construction: Began___________________ Completed______________

13. Your Performance Evaluation by Owner, if known ________________________________________________

14. Were You Terminated or Assessed Liquidated Damages? __________________________________________ (If either is “Yes”, attach an Explanation)

15. Owner’s Point of Contact for Reference (Name and Company) ______________________________________

16. Current Telephone Number of Reference POC: ___________________________________________________

SECTION 00 22 11 – ATTACHMENT 2

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR.

THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts O G A M U

b) Ability to meet quality standards specified for technical performance O G A M U

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

O G A M U

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

O G A M U

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

O G A M U

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? O G A M U

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

O G A M U

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

O G A M U

d) Overall customer satisfaction O G A M U

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

O G A M U

b) Ability to hire, apply, and retain a qualified workforce to this effort O G A M U

c) Government Property Control O G A M U

d) Knowledge/expertise demonstrated by contractor personnel O G A M U

e) Utilization of Small Business concerns O G A M U

f) Ability to simultaneously manage multiple projects with multiple disciplines

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific issues)

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk. (Please attach additional pages if necessary.)

SECTION 00 22 11 – ATTACHMENT 3

KEY PERSONNEL RESUME

Provide information, listed below, on separate sheets showing qualifications of: On Site Construction Project Manager, Quality Control Manager (CQC System Manager), Site Superintendent, and Site Safety and Health Officer. NOTE: Match the positions on this page to the list of key personnel in the narrative submission requirements and evaluation criteria.

(1) Name and Title ________________________________________________________________

(2) Project Assignment _____________________________________________________________

(3) Name of Your Firm _____________________________________________________________

(4) Years experience in the role identified ______________________________________________

(5) No. of Years: With this Firm__________ With other Firms____________

(6) Education: Degree(s)/Year/Specialization ____________________________________________

(7) Active Registration, if any: No._______, State(s) ______, First Year/ Current Year ______/______

(8) Other experience and qualifications relevant to same/similar work required under this contract:

SECTION 00 22 11 – ATTACHMENT 4

LETTER OF COMMITMENT FOR KEY PERSONNEL

TO: Contracting Officer

SUBJECT: Letter of Commitment for Proposed Contract for ____________________________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that I will fulfill the duty of (Job Title).

Sincerely, (prospective employee signs)

Date: ____________

SECTION 00 22 11 – ATTACHMENT 5

LETTER OF COMMITMENT FOR KEY SUBCONTRACTORS

(USE COMPANY LETTERHEAD)

TO: Contracting Officer

SUBJECT: Letter of Commitment for Proposed Contract for ____________________________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of key Subcontractors firm) will fulfill the duties of (state role on a project).

Sincerely, (Authorized Official)

Date: ____________

SECTION 00 22 11 – ATTACHMENT 6

SMALL BUSINESS PARTICIPATION PLAN

All offerors (both large and small businesses) are required to complete a Small Business Participation Plan.

Offerors shall propose the level of participation of small businesses (as a small business prime and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area.

Check the applicable size and categories for the PRIME offeror only -- Check all applicable boxes:

{ } Large Prime or { } Small Business Prime; also categorized as a

{ } 8(a) { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Zone (HUB Zone) Small Business { } Veteran Owned Small Business (VOSB) { } Service Disabled Veteran Owned Small Business (SDVOSB)

(a) Submit the total combined percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors):

Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.

Total Percentage planned for Large Business(es): ____ % Total Percentage planned for Small Business(es): ____ %

100%

(b) Please indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:

SDB

HUB Zone Small Business Woman Owned Small Business Service Disabled Veteran Owned SB Veteran Owned Small Business

(c) List of principle small business firms by name and/or socioeconomic category and the supplies/services to be performed:

Name of Company Identified Type of Service/Supply Small:

SDB/8(a):

Women-Owned Small:

HUB Zone Small:

Veteran Owned Small:

Service Disabled Veteran Owned Small:

(d) Extent of commitment to use each of the identified small business. Offerors should submit copies of commitment instruments.

(End of Summary of Changes)

File details come from the government source that posted it.