Building 729 Replace Main Chiller
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA670324B0001
- Agency
- Reserve Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Marietta, Georgia 30069, United States
- Points of contact
-
- Kevin Song kevin.song@us.af.mil (678) 655-3695
- Kenneth Jacob kenneth.jacob.1@us.af.mil (678) 655-5745
- Kenneth J. Jacob kenneth.jacob.1@dobbins.af.mil (678) 655-5745
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for a fixed-price construction contract to replace the 130-ton chiller and associated equipment at Building 729 on Dobbins Air Force Base in Georgia. The project will also relocate an existing 40-ton chiller. The Department of the Air Force Reserve Command is seeking offers for this work, which includes upgrading wiring, replacing underground chilled water piping, and reconnecting controls. The period of performance is 425 calendar days, with the first 60 days for document processing and the remaining 365 days for on-site work. Key requirements include submitting a safety plan, product details, quality control plan, and as-builts.
This is a total small business set-aside contract. The solicitation number is FA670324B0001, and the NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The place of performance is Marietta, GA 30069. No incumbent contractor is named, and the government has not provided a value estimate for the contract.
Notice text
This project will repair by replacing the 130-ton chiller. Upgrade wiring from chiller to Main Distribution
Panel (MDP). Replace underground chilled water piping from chiller to mechanical room. Reconnect existing
control wiring. Install new strainers, fittings, conduit, valve boxes as necessary to make chiller fully
operational. Provide factory startup on new 130-ton chiller. Relocated existing 40-ton chiller to adjacent
concrete pad. Connect chiller to underground chilled water piping. Reconnect existing control wiring. Install
new strainers, fittings, conduit, valve boxes as necessary to make chiller fully operational.
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 1 SOW FGWB 24-0008 Replace Chiller.pdf | ||
| Attachment 2 Drawing_1.pdf | ||
| Attachment 5 01 01 00 - General Requirements_1.pdf | ||
| Attachment 6 01 33 00 - Submittal Procedures_1.pdf | ||
| Solicitation - FA670324B0001.pdf | ||
| Attachement 3 Wage Determination.pdf | ||
| Attachment 4 Financial Institution Reference Sheet_1.pdf | ||
| Attachment 7 1 56 00 - Environmental Requirements_1.pdf | ||
| Attachment 8 DARBDesignGuide Dec 2023 revision.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Building 729 Replace Main Chiller | Award Notice | |
| Building 729 Replace Main Chiller | Solicitation | |
| Building 729 Replace Main Chiller | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity