Attachment 5 01 01 00 - General Requirements_1.pdf

PDF 165 KB Posted

Attached to
Building 729 Replace Main Chiller Federal contract opportunity
Solicitation number
FA670324B0001
Issued by
Department of the Air Force Reserve Command

About this file

This document is the General Requirements section of the specifications for a federal contract opportunity to renovate Building 729 at Dobbins Air Reserve Base in Georgia. The project involves replacing a 130-ton chiller, upgrading electrical wiring, replacing underground chilled water piping, reconnecting existing controls, and relocating an existing 40-ton chiller. Key requirements include obtaining base permits, maintaining a clean tire policy, implementing erosion and sediment control, and submitting a quality control plan and as-built drawings. The contract has a solicitation number of FA670324B0001 and is being issued by the Department of the Air Force Reserve Command. The work will be required to be completed by July 22, 2024.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 01 00 Page 1

SECTION 01 01 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 PROJECT INFORMATION

1.1.1 Contract Drawings and Specifications

1.2. SUBMITTALS

Submittals shall be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES.

NOTE: The contractor shall obtain Government approval of all materials and equipment requiring submittals prior to bringing these materials and equipment onto Dobbins ARB for installation and incorporation into the work. The contractor shall follow section 01 33 00 of the basic contract in obtaining Government approval.

1.2.1. Administrative or Close-out Submittal

a. Construction Phasing (ref: paragraph 3.2.1)

b. Daily Progress reports to Contracting Officer within 2 hours of shift completion

c. Quality Control Plan, (ref: paragraph 3.17.6)

d. As-built drawings (After construction complete)

e. DD Form 1354 INTERIM – Required prior to final inspection. Coordinate requirements with COR prior to submission

1.3. GENERAL DESCRIPTION

1.3.1. Location

The project is located at Dobbins Air Reserve Base, Georgia.

1.3.2. Project Description

The project is a complete renovation ------------------------------------

1.4 GOVERNMENT INSPECTOR

The Base Civil Engineer, or his authorized representative, is designated as the representative of the Contracting Officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This clause does not authorize anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract.

1.5 ORAL STATEMENTS

No oral statement by any government official shall in any manner or degrees modify or otherwise affect the terms of this contract.

1.6 NO GOVERNMENT WAIVER

The failure of the Government in any one or more instances to insist upon strict performance to any of the terms of this contract or to exercise any option herein conferred will not be construed as a waiver or relinquishment to any extent of the right to assert or rely upon

Attachment 5 FA670324B0001 22 July 2024

SECTION 01 01 00 Page 2 such terms or option on any future occasion.

1.7 AS-BUILT RECORDS

Maintain at the jobsite 2 sets of full-size contract drawings. Any deviations from the contract drawings shall be marked legibly and accurately with a red pen. These drawings shall be available for review by the Contracting Officer at all times. Submit one marked set of prints to the Contracting Officer no later than 30 calendar days after work is deemed substantially performed or beneficial occupancy is taken.

1.8 RECORD DRAWINGS

Record drawings shall have all modifications/changes identified during construction documented on As-built drawings such that drawings capture actual installed conditions. All record drawings will be provided to the Contracting Officer in .pdf and AutoCad (.dwg) format no later than 30 calendar days after work is deemed substantially performed or beneficial occupancy is taken.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 BASE REGULATIONS

The Contractor and his employees and subcontractor shall become familiar with and obey all base regulations, including fire, traffic, airfield, safety, environmental, and security regulations. Regulations are available upon request. All personnel employed on subject contract shall keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless previously cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.

3.2 WORK SCHEDULE

The Contractor shall schedule his work to cause the least amount of interference with base operations. Work schedules shall be subject to the approval of the Contracting Officer.

Under no circumstances shall fire water system be out of service for more than 5 calendar days. Permission to interrupt any base roads and/or utility service shall be requested in writing a minimum of 10 calendar days prior to the desired date of interruption.

Interruption shall not take place without specific approval from the Contracting Officer.

3.2.1 Construction phasing

Thirty (30) days prior to commencing work; provide to the Contracting Officer, for approval, a plan, which indicates the Timeline of start to completion of each construction phase.

3.3 WORK HOURS

The normal hours of work for the performance of this contract will be from 7:30 AM to 5:00 PM except as otherwise expressly provided in this contract. The workdays will be Monday through Friday, with Federal holidays excluded. Alternate work hours require written permission of the Contracting Officer. The contractor must submit a written request for permission to work to the Contracting Officer at least 2 working days in advance of the date when the contractor desires to deviate from the normal hours and days. Permission to deviate will be predicated on complete justification for the request after due consideration to a larger work force and more equipment during normal hours, and providing the contractor defrays the additional costs to the Government including, but not limited to, inspection computed in accordance with existing Government regulations. If permission is granted by the Contracting Officer, written authority will be furnished to the contractor prior to the date the contractor desires to deviate from the normal hours or days. The Contracting Officer may also direct performance as authorized by the General Provisions by reference clause entitled

SECTION 01 01 00 Page 3

“Schedule for Construction Contract.”

3.4 OPERATIONS ON THE AIRFIELD (Not Applicable)

3.5 EXISTING WORK

The removal or altering in any way of existing work shall be carried on in such a manner as to prevent personal injury or damage to any portions of the existing work that remains.

3.6 SANITATION

Adequate sanitary conveniences of a type approved for use by persons employed on the work shall be provided. Sanitary conveniences shall be properly secluded from public observation, and maintained by the Contractor in such a manner as required or approved by the Contracting Officer. Maintain these conveniences at all times without nuisance. Upon completion of the work, the contractor shall remove the conveniences from the premises, leaving the premises clean and free from nuisance.

3.7 UTILITIES

All reasonable quantities of government provided utilities shall be made available to the contractor without charge. Any temporary telephone service shall be requested by the contractor from the local Telephone Company providing service to Dobbins ARB. The contractor shall not tamper with, connect or access any Government communication facility, equipment or cable without express written consent from the Contracting Officer. Any temporary connections or lines that may be required shall be installed, maintained, and removed by the Contractor at his expense and in a manner satisfactory to the Contracting Officer. Contractor shall remove all temporary connections and lines prior to final acceptance of the construction.

3.8 UTILITY SERVICE INTERRUPTION

The Government shall not be held responsible for interruptions of utility services and shall not be liable for Contractor delays, damages, or increased costs occasioned by any such interruption of services.

3.9 OPTIONAL REQUIREMENTS

Where a choice of materials or methods, or both, is permitted in this contract, the Contractor will be given the right to exercise the option unless otherwise required by the specification or plans.

3.10 MATERIAL APPROVAL SUBMITTAL PREPARATION

"Material and Workmanship" shall be accomplished on and in accordance with the instructions to AF Form 3000, Material Approval Submittal. Material Approval Submittals shall contain complete information for the product proposed. The information shall be in enough detail to allow the Government to determine acceptability. Information to be provided includes, but is not limited to: a description of all salient features of the product, descriptive literature and manufacturer's cut sheet (if available), plus an explanation as to precisely why and how the material or item submitted meets or exceeds all required functions, performance and quality specifications.

3.11 MATERIAL DISPOSITION

3.11.1 Material/Equipment Title

Title to materials and equipment to be demolished, except Government salvage and historical items, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to

SECTION 01 01 00 Page 4 proceed.

3.11.2 Contractor Salvage

Contractor shall salvage items and materials to the maximum extent possible. Material salvaged for the Contractor shall be stored as approved by the Contracting Officer and removed from Government property before completion of the contract. The contractor shall not sell salvaged material on the site.

3.12 CLEAN-UP

Remove and transport debris in a manner that prevents spillage on streets or adjacent areas.

Local regulations regarding hauling and disposal shall apply. The contractor shall maintain a clean and orderly work site.

3.13 SAFETY REQUIREMENTS

The contractor shall initiate and maintain programs that comply with the provisions of 29 CFR parts 1926 and 1910 of the Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractors’ personnel in the recognition, avoidance, and prevention of unsafe conditions and practices.

3.14 FIRE PROTECTION

The contractor shall be responsible for furnishing adequate and proper fire protection during all phases of work on site. Contact the base Fire Department in the event of emergency.

3.15 FACILITIES AND SERVICES

The contractor is responsible for storage of all materials. Storage areas shall be shown on the site plan and approved by the Contracting Officer.

3.16 RESTRICTIONS

3.16.1 Radio Transmitter Restrictions

The contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment, as directed. Two transmitters shall be provided by the government to the contractor for use during construction.

3.16.2 Materials Burning

Burning of trash, timber and any other debris on government property is not permitted.

3.17 REQUIRED CONTRACTOR ACTIONS

3.17.1 Base Permits

Obtain these pursuant to paragraph 3.1 of this specification. Permits are required for, but are not necessarily limited to, welding, and digging.

3.17.1.1 Government Digging Permits

The requirement for digging or excavation permits (AF Form 103) shall be applicable for Government-owned utilities such as water, gas, electrical, sewer, fiber optics, telephone cable and communication cables for radar, weather and navigational aids cable.

3.17.1.1.1 Procedures for Government Digging Permits

SECTION 01 01 00 Page 5

Contractor shall not dig or penetrate the grade anywhere on Dobbins ARB without a government approved, signed AF Form 103, Dig Permit.

It is the contractor’s responsibility to initiate and renew the dig permit as required for the construction location.

Contractor initiates the dig permit process by contacting Georgia 811. Contractor should coordinate with the Contracting Officer Representative (COR) for proper procedures.

Contractor shall mark the area on site where digging is to occur. This shall be done the same day the dig permit is initiated. Utility locator’s have 14 days to sign the initial digging permit.

Contractor shall maintain all markings during construction performance period.

Contractor will maintain a signed copy of AF Form 103, Dig Permit, on site during digging.

Once a digging permit is issued, the contractor must hand dig and locate all marked utilities within 5 feet of the area to be worked on. Contractor shall fill all holes prior to project completion.

If, during the life of the digging permit, utility markings are removed by the contractor or his subcontractor the contractor shall be responsible for replacing all markings.

3.17.1.2 UPC Digging Permits

The procedures set forth for Government-owned utilities shall not apply to utilities which are governed by the Utilities Protection Center (UPC) under the auspices of the State of Georgia. UPC utilities on Dobbins ARB include television cable, telephone cables, data cables, etc. Procedures for utilities governed by the UPC shall be followed in accordance with Georgia Utility Facility Protection Act (GUFPA). The contractor is required to obtain a UPC digging permit prior to digging on Dobbins ARB. The government is not responsible for issuing or monitoring UPC digging permits.

3.17.1.3 Utility Damage

The Contractor must immediately notify the Government technical representative and UPC in the event that utility damage occurs. If damage to utilities is due to contractor non-compliance with permit instructions or contract requirements, repairs required shall be at the contractor’s expense. Fiber optic cables, which cannot be repaired to meet the minimum allowable decibels, will be replaced at the contractor’s expense.

3.17.1.4 Welding Permits

Obtain welding permits on a daily basis from the Base Fire Department.

3.17.2 Severe Weather Protection

In the event of severe weather, the contractor shall take precautions to minimize any danger to persons, and protect the work and any nearby Government property. Precautions shall include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work.

3.17.3 Clean Tire Policy

Dobbins ARB has a clean tire policy at work sites. The purpose of this policy is to reduce or eliminate the transport of mud from the work area onto public rights-of-way by motor

SECTION 01 01 00 Page 6 vehicles leaving the site or by runoff from the site. Clean and remove mud from the wheels of vehicles prior to entrance to public rights-of-way. The site exit shall be maintained in order to prevent tracking or flow of mud onto public rights-of-way. Immediately remove all materials spilled, dropped, washed or tracked from any vehicle or site onto any roadway or into any storm drain. Compliance with the clean tire policy, by Contractor and Sub-contractor personnel, shall be the sole responsibility of the Contractor.

3.17.4 Erosion and Sediment Control

Take positive steps to minimize siltation and erosion during the work. Comply with the requirements of Section 01560, drawings and all other related specification sections. The contractor must submit a completed Erosion, Sedimentation, and Pollution Control Plan (form attached behind this specification) to the DARB COR prior to beginning work. The contractor must use GA SWCC Best Management Practices (BMPs) and these BMPs will need to be installed prior to any clearing or grubbing.

3.17.5 Environmental Requirements

The Contractor and all work to be performed on Dobbins ARB shall comply with the requirements of Section 01 56 00.

3.17.6 Quality Control Plan

The contractor shall be required to institute a comprehensive Quality Control Program in order to assure himself and the Government that all materials and workmanship are in strict accordance with the provisions of the specifications. Within 10 calendar days after receipt of Notice to Proceed, the contractor shall submit his Quality Control Program Plan to the Contracting Officer for review and approval. The plan shall contain, at a minimum, identification of procedures for quality control, the type and model of major pieces of equipment to be used on-the-job, ordering procedures for materials, and procedures to ensure adequate progress.

3.17.7 Hazardous Spill Reporting

The contractor shall report any spill of oil or hazardous substances to the Fire Department service desk at Ext. 911 from a government phone, or (678) 655-4840 from a commercial phone (24 hours per day, 7 days per week). The contractor shall take every reasonable precaution to prevent the spillage of oil or other hazardous substances.

3.18 DD FORM 1354

Completion of a DD1354 Package is required for this project. Copies of the DD1354 form and its instructions are included in the project manual. Electronic copies will be available from the COR. Follow the instructions given for executing the DD1354 and coordinate it’s submission with the COR.

3.19 Existing Furniture

The contractor is responsible for protecting the existing furniture in the building throughout the course of work. Contractor will remove and store furniture in a contractor furnished storage container during construction. Additionally, contractor shall provide boxes for packing existing building contents. Boxes need to be provided to building users to move personal items not to be stored in with furniture. The users will only box their personal items. All other items will be packed and stored by the contractor in the container provided by the contractor. Once construction is complete, the contractor is responsible for moving all furniture and boxes back into the building per the direction of the COR.

-- End of General Requirements --