Building 145 Restroom Flooring - Malmstrom AFB
Closed Solicitation Posted
- Solicitation number
- FA4626-24-Q-0029
- Agency
-
Global Strike Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238330 Flooring Contractors
- Place of performance
- Malmstrom AFB, Montana 59402, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Global Strike Command is seeking to procure the abatement and disposal of asbestos-containing materials, as well as the removal and installation of resilient sheet flooring and rubber cove base, in the restrooms of Building 145 at Malmstrom Air Force Base in Montana. The key requirements include safely removing and disposing of asbestos-containing materials from two restrooms, and installing approximately 112 square yards of resilient sheet flooring using the direct glue-down method with welded seams, along with 75 linear feet of 4-inch rubber cove base in four rooms. The work must comply with all applicable federal and state regulations. Quotes are due by 2:00 PM MT on May 6, 2024, and must remain valid through May 31, 2024. The award will be made to the lowest priced technically acceptable offer.
This procurement is a 100% set-aside for Small Businesses under NAICS code 238330, Flooring Contractors. The period of performance is 60 days after the date of contract. No potential incumbents or current contractors are named, and no award value or budget range is provided. The place of performance is Malmstrom Air Force Base in Montana.
Notice text
This requirement is for the abatement and disposal of Category I or Category II non-friable asbestos-containing materials located in Building 145, restrooms (Rooms 324 and 325) identified in the Performance Work Statement (PWS). Additionally, this requirement requires the contractor to properly remove existing flooring and install approximately 112 square yards of resilient sheet flooring (in Room 324, Room 325, Room 210, and Room 202) using the direct glue down method of installation and to include welded seams and approximately 75 linear feet of 4” rubber cove base. These improvements will take place in Building 145 on Malmstrom AFB, MT.
Please see the attached combined solicitation/synopsis and PWS for additional requirements.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| Atch 3_B145 Bathrooms Photos.pdf | ||
| QA_23 April 2024.xlsx | XLSX spreadsheet | |
| COMBO_8 April 2024.pdf | ||
| Atch 1_PWS_Bldg 145 Flooring..pdf | ||
| Atch 2_Installation Perimeter Access Control.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Flooring Requirement Contract Solicitation | Air Mobility Command | Total Small Business | |
| MT bftc carpet replacement conference room | — | Total Small Business | |
| 163rd CE Flooring & Painting 2272 | Army National Guard | Total Small Business | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity