This document is a Performance Work Statement (PWS) for the abatement and disposal of Category I or Category II non-friable asbestos-containing materials, and the installation of resilient sheet flooring and rubber cove base, in Building 145 on Malmstrom Air Force Base in Montana.

The PWS requires the contractor to safely remove and dispose of asbestos-containing tile, flooring mastic, and other materials from two restrooms (Rooms 324 and 325) in Building 145. Additionally, the contractor must install approximately 112 square yards of resilient sheet flooring in four rooms (324, 325, 210, and 202) using the direct glue down method, including welded seams, and provide and install approximately 75 linear feet of 4-inch rubber cove base. The work must comply with all applicable federal and state statutes and regulations. The performance period is 21 days after the notice to proceed, and the carpet must be received prior to starting the work.

View the file

Other files for this federal contract opportunity

Other files attached to Building 145 Restroom Flooring - Malmstrom AFB, newest first.
File Type Posted
Atch 3_B145 Bathrooms Photos.pdf PDF
QA_23 April 2024.xlsx XLSX spreadsheet
Amendment 001.pdf PDF
COMBO_8 April 2024.pdf PDF
Atch 2_Installation Perimeter Access Control.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 December 2023 Asbestos Removal / PWS

MALMSTROM AIR FORCE BASE l of 12

PERFORMANCE WORK

STATEMENT (PWS) FOR

ASBESTOS REMOVAL and

FLOORING INSTALLATION IN BLDG

MALMSTROM AIR FORCE BASE

MONTANA

2 of 12 MALMSTROM AIR FORCE BASE

SECTION 1

DESCRIPTION OF SERVICE

1. SUMMARY OF EXPECTATIONS

1.1. This work will include the following:

• Building 145: Remove non-friable “Category I” or “Category II” asbestos containing tile, floor mastic and flooring, followed by flooring installation.

Proper disposal and documentation are required per Federal and Montana Statutes and regulations. Performance period will be 21 days after notice to proceed and carpet has been received.

1.2. The contractor shall provide all applicable permits, items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein required to safely remove and dispose of the aforementioned items containing asbestos materials in Building 145.

1.2.1 Asbestos Removal References: The publications listed below form a part of this Performance Work Specification (PWS). All references listed in these specifications must be the current version or edition, unless specifically identified otherwise. The Contractor shall conform with all applicable Occupational Safety & Health Act (OSHA), Environmental Protection Agency (EPA), Montana Department of Environmental Quality (MDEQ), United States Air Force (USAF) and all other Federal, State and Local environmental regulatory requirements.

29 Code of Federal Regulations (CFR) Occupational Safety and Health Administration (OSHA) 1910.134, 1910.1001, and 1926.1101

40 CFR Environmental Protection Agency (EPA) Part 61 Subpart M 40 CFR EPA Part 763 Subpart E 49 CFR Department of Transportation (DOT) Part 173.216 EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual (1996) 75 MCA Montana Code Annotated (MCA) 2014 75-2-501 to 75-2-519 17 ARM Administrative Rules of Montana (ARM) 17.74.301 to 17.74.518, inclusive MAFB AMOP Malmstrom Air Force Base Asbestos Management and Operations Plan, 28 December 2016 341 SW OPLAN 32-00-1 Support Wing Operations Plan for the Green Purchasing Program AFI 32-1052 Air Force Instruction for Facility Asbestos Management

3 of 12 MALMSTROM AIR FORCE BASE

1.3. Asbestos Removal and Flooring Installation: The contractor will be responsible for:

• removing non-friable asbestos materials, flooring, etc. as specified by the Contract Officer

(CO)

• installing new flooring, cove molding, etc. as specified by the CO

Refer to the Accredited Asbestos Inspection Report dated 22 June 2022 for detailed information regarding materials involved with this PWS (note: although the rooms in this report are not specific to this PWS, the rooms covered by this PWS are similar homogeneous areas). The Category I asbestos floor tiles, mastics, etc. are non-friable. The contractor shall remove these non-friable materials in compliance with Montana and Federal statutes and regulations. If these materials are removed in a non-friable manner, asbestos abatement permitting will not be required.

IMPORTANT: Any grinding, sawing, abrading, or pulverizing of the Category I Asbestos- Containing Material (ACM) will render those materials friable and Regulated Asbestos- Containing Materials (RACM). If this occurs, the CO will issue an immediate “stop work” order and contact the 341 CES/CEIE Asbestos Program Manager regarding the way forward.

A “competent person” holding current Montana accreditation as an Asbestos Contractor / Supervisor must oversee all asbestos removal and disposal.

MDEQ considers all asbestos as “special waste”. Many landfills require that all ACM be segregated from the general demolition waste stream. They may also require that the transport driver hold a current Asbestos Contractor / Supervisor accreditation.

Non-RACM must be single-wrapped, “burrito” style, with taped seams. The name and contact information of the owner must be provided with each waste package. The contractor should contact potential disposal sites prior to bidding or disposal.

The contractor shall provide copies of all project-related documents to the CO for archiving.

The contractor shall provide copies of all shipping manifests and waste disposal records to the 341 CES/CEIE Asbestos Program Manager within 10 business days of the disposal date. The copies shall include a brief project description, affected room numbers, notes, comments, etc.

2. HOURS OF OPERATION

2.1. Normal Hours. The contractor shall perform all the routine services required under this contract during the following hours: 0700 through 1600 Monday through Friday, with the exception of Federal Holidays, or when the base is officially closed by the base commander.

2.2. Recognized Holidays. The contractor is not required to provide routine service on the following days: New Years Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. NOTE: Normally, if the holiday falls on Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday. If MAFB is closed due to: an Executive Order, Down Days, Family Days, Snow Days, Early Releases and Shut Downs observed by MAFB civilians will be excused.

2.3. No Smoking in Work Place. There will be no smoking in workplaces and entryways.

This includes all facilities on Malmstrom AFB, MT. Smoking areas are designated

4 of 12 MALMSTROM AIR FORCE BASE outdoors, away from facility entrances.

3. CONTRACTOR REQUIREMENTS

3.1. The contractor shall provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals required to abate and dispose of Category I or Category II non-friable asbestos-containing materials located in Building 145, restrooms (rooms 324 and 325) identified on attached floor plan. The contractor shall provide all labor, equipment, tools, accessories and materials to properly install approximately 112 square yards of resilient sheet flooring (in rooms 324,325,210, and 202) using the direct glue down method of installation and to include welded seams. To include approximately 75 linear feet of 4” rubber cove base, in Building 145 on Malmstrom AFB, MT.

3.2 Asbestos Removal Process

Abatement and disposal of hazardous materials in Building 145 rooms 324 and 325 will conform to Federal and Montana statutes and regulations. The work covered by this section includes the removal and disposal of non-friable asbestos tile, flooring mastic, or other materials specified by the CO. Refer to the Accredited Asbestos Inspection Report dated 22 June 2022 for detailed material descriptions, recommendations, packing and disposal procedures, etc. The contractor shall:

• will provide safe operations by utilizing appropriate procedures and equipment

• prevent rendering the non-friable ACM as friable RACM

• protect workers and occupants in the area from contact with any ACM

3.3 Resilient Sheet Flooring Installation

The contractor shall provide all material to complete the installation in accordance with standard commercial practices all seams shall be heat welded. The resilient sheet flooring shall be Mannington BioSpec SR (slip resistant) color Talpa SR67418 or equal in rooms 324,325,210, and

202. Cove base shall be 4” rubber of a complementary color and installed only on drywall surfaces not the tiled surfaces. The contractor shall provide and install aluminum bend- down type edge guard and/or rubber /vinyl transition strips for direct glue down resilient sheet flooring where required.

4. CONTRACTOR EMPLOYEES

4.1. Appearance. Personnel shall present a neat appearance and be easily recognized as contractor employees.

4.2. Conflict of Interest. The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD 5500- 7-R. Off-duty military personnel cannot work at an hourly rate of pay less than the minimum or prevailing wage. The Air Force does not permit off-duty employment in jobs temporarily vacated by a firm's striking employees. However, off-duty Air Force military personnel who were employed by a contracting firm before it became involved in a labor dispute need not be required to terminate employment solely because of the dispute.

5 of 12 MALMSTROM AIR FORCE BASE

4.4. Contract Manager. The Contractor shall appoint a Project Manager (PM) to provide daily supervision and quality control, and who shall represent the Contractor and be responsible for the performance of the work throughout the contract term. The name of this person, and an alternate(s) who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer (CO) and the Government Inspector within 5 days of NTP issuance.

4.5. Employee Training. The contractor is responsible for all internal employee training at no additional cost to the government, to include but not limited to, environmental required training.

4.6. Employee Certifications. Contractor shall have valid Contractor's license with the State of Montana. Contractor shall submit proof of compliance with this item. General Contractors are required to have license or hire Sub-Contractors with valid Contractor’s license with the State of Montana Contractors Licensing Board.

5. ENVIRONMENTAL, SAFETY, AND HEALTH

5.1. General Requirements. Establish and implement an environmental, safety, fire prevention and health program that ensure the best practices are utilized in management, operations and maintenance of site facilities and equipment, and in other activities. The program shall include procedures to comply with all applicable Federal, State and local laws.

Provide safe and healthful workplaces and conduct periodic self-inspections for hazards or deficiencies. Conduct job safety analyses for each work task not governed by TO or other definitive guidance and anytime a new work task or process is introduced to the industrial or non-industrial workplace to determine potential hazards. Comply with the highest degree of environmental protection or safety practices where any disagreements between requirements exist.

5.2. Specific Environmental Requirements

5.2.1. Existing Conditions. Identify and document any substandard environmental conditions or practices, and any existing contamination, in writing, to the CO within 30 days of contract award. The government indemnifies the contractor from preexisting contamination.

5.2.2. Point of Contact. Designate in writing to the CO within 30 days after contract award an Environmental Coordinator as the focal point for all environmental issues regarding this PWS.

5.2.3. Environmental Protection Procedures. Develop, implement and maintain Environmental Protection Procedures (EPP) in accordance with Malmstrom AFB OPLAN 32- 7042 (Hazardous Waste Management Plan)

5.3. Contractor Liability. The contractor shall be liable and responsible for all costs resulting from:

5.3.1. Hazardous Chemical Discharge. Discharge or spills resulting from contractor negligence.

5.3.2. Non-Compliance with Environmental Regulations. Failure to follow any Federal, State, or local laws or regulations.

6 of 12 MALMSTROM AIR FORCE BASE

5.4. Fines and Corrective Actions. Any fines or corrective actions assessed by any regulatory or governing agency due to the actions or omissions of the contractor in carrying out his duties.

6. SPECIFIC SAFETY AND HEALTH REQUIREMENTS

6.1. Existing Conditions. Identify and document any substandard safety, fire prevention, health conditions or practices, in writing, to the CO within 30 days of contract award.

6.2. Point of Contact. Designate in writing a Safety and Health Coordinator as the focal point for all safety and health issues to the CO and Wing Safety Office within 30 days after contract award and within 10 days as changes occur. Issues not resolvable at the local level will be handled under the administration of the CO. The contractor safety representative, within 10 days of the conversion date, will contact the Wing Safety Office for safety orientation and will attend safety meetings as needed.

6.3. Safety Inspections. Conduct safety inspections as required. The Wing Safety Office shall have the authority to conduct work site visits to ensure the contractor is using and managing Air Force facilities and equipment according to Air Force Instructions/Standards.

6.4. Hazard Reporting. The contractor shall promptly report hazards involving Air Force personnel, Facilities, and/or equipment to the QAE and Wing Safety Office.

7. MISHAP NOTIFICATION AND REPORTING. The contractor shall immediately report any and all injuries and damage involving contractor, Air Force civilian or military personnel to the QAE and the Wing Safety Office.

7.1. Cooperate fully and assist government personnel in any government investigation of the mishap, until released by the mishap investigative authority through the CO. Safety personnel shall have the right, at any time, to investigate and report all mishaps involving Air Force personnel and property. The CO and contractor Safety representative may accompany Air Force mishap investigation personnel but may not release information regarding the mishap without written approval of the AF Safety investigating official or senior installation commander.

7.2. Maintain records of contractor employee's occupational injuries, illnesses, and other related activities as required.

8. FIRE PREVENTION. Establish and implement procedures to ensure careful handling and storage of flammable and combustible products IAW National Fire Protection Association (NFPA) Standard 30 and National Fire Codes.

9. SECURITY REQUIREMENTS

9.1. Anti-Terrorism Awareness Training: In accordance with DoDI O-2000.16v1_AFI 10- 245-O, Antiterrorism (AT) Program Implementation, ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. The training will be provided by the government. The objective of the training is to provide personnel

7 of 12 MALMSTROM AIR FORCE BASE with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures.

9.2. Force Protection: Contractor personnel are required to abide by all real-world Force Protection Condition (FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

10. HOUSEKEEPING AND CUSTODIAL SERVICES. The contractor must maintain the contractor assigned areas in a clean, safe, and sanitary condition. Remove trash from all the work areas and store all flammables in an approved flammable storage container and ensure the area is left in an orderly manner at the end of the duty day.

10.1. Sanitary Facilities. The Contractor's employees may use the nearest sanitary facilities.

The location will be identified at the Pre-Performance meeting. The Contractor shall not use facilities in controlled or restricted areas IAW security requirements.

10.2. Refuse Collection. Waste generated by the Contractor in performance of the services specified with this PWS shall be disposed of by contractor off base in compliance with State and Local ordinances, including hazardous materials in which proper disposal instructions shall be complied with. The contractor shall provide the government inspector with a copy of each dump receipt at the conclusion of every disposal of hazardous waste. The contractor shall comply with all base recycling regulations. All trash, debris, and refuse caused by the job shall be removed and disposed and shall be deposited in an approved receptacle or container furnished by the Contractor. The job site shall be cleaned at the end of each workday.

11. INSURANCE REQUIREMENTS. Contractors are required to comply with applicable Federal and State worker's compensation and occupational disease statutes.

11.1. Employer's Liability. Coverage of at least $100,000 shall be required, except in States with exclusive monopolistic funds that do not permit workers' compensation to be written by private carriers.

11.2. Bodily Injury Liability. Coverage of at least $500,000 per occurrence.

11.3 Property Damage Liability. This type of insurance shall be required only in special circumstances as determined by the agency. ·

11.4. Automobile Liability (Contractor's Vehicles). Automobiles used in conjunction with performing the contract and operated in the United States shall have coverage of at least

8 of 12 MALMSTROM AIR FORCE BASE

$200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

12. ADMINISTRATIVE RECORDS. All records, documents, and associated papers provided by the government and generated during the period of this contract become government property and will remain in place upon contract termination or completion. During the period of the contract, records, documents, and associated papers shall be available for review.

13. CONDITIONS OF WORK. All efforts will be made to allow complete access of the work area to the Contractor(s) and sub-Contractor(s) and maintain the area free of traffic to personnel.

Temporary facilities constructed by the Contractor to prevent interruption of normal work activity are subject to approval by Base Engineering/Contracting Officer.

14. CONTRACTOR VEHICLES AND EQUIPMENT. The Contractor shall provide all vehicles and equipment necessary to accomplish the contract work. Power equipment shall be equipped with safety and noise limiting devices. The equipment shall be in a safe and efficient operating condition. The Contractor will not park vehicles in the project area during non-working hours. Vehicles will not be allowed on lawns or sidewalks without prior written approval. All equipment will be clearly marked with the Company's name. Seatbelts must be worn at all times while operating a vehicle on base. Additionally, the use of cellular phones without a hands-free operation is prohibited while operating a vehicle on base.

15. INSPECTION. The 341st Civil Engineering Squadron will provide the inspector to verify work quality. The inspector will be the spokesman for compliance with base standards and, if present, the specifications and drawings. Controversies between the inspector and the Contractor will be resolved by the Contracting Officer. If, for some reason, a change in the primary or alternate inspector is required, the Contractor will be notified in writing by the Contracting Officer. The Contractor shall coordinate Contractor activities with the 341st Civil Engineering Squadron.

15.1. Final Inspection. The Contractor will notify the project coordinator of his estimated work completion date at least 4 days in advance, so that a final inspection can be held by base personnel. Any deficiencies found shall be rectified by the Contractor and the Contractor shall inform the project inspector when the deficiencies have been corrected. The project coordinator will re-inspect the completed work to verify the corrections.

16. GOVERNMENT POINTS OF CONTACT. The Government Points of Contact for this contract shall be Mark Dalrymple, 341st Civil Engineering Squadron; Jared Grundhouser, 341st Civil Engineering Squadron.

SECTION 2

GOVERNMENT FURNISHED PROPERTY AND SERVICES

1. Government-Furnished Services. Government-furnished services include services provided by Government activities as well as contracted services.

9 of 12 MALMSTROM AIR FORCE BASE

1.1. Utilities. All reasonable quantities of utilities will be made available from existing utilities to the Contractor without charge. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his own expense and in such a manner satisfactory to the Contracting Officer. Removal of such connections or lines will be accomplished prior to final acceptance of the project. The Contractor shall provide any necessary portable power.

1.2. The government will provide law enforcement, fire protection, and security.

1.3. The government will provide emergency medical treatment for Contractor personnel.

Treatment will be at the Contractor’s expense.

10 of 12 MALMSTROM AIR FORCE BASE

APPENDICES

A. Floor Plan

B. Resilient Sheet Flooring Spec.

12 of 12 MALMSTROM AIR FORCE BASE

APPENDIX A. FLOOR PLAN

12 of 12 MALMSTROM AIR FORCE BASE

APPENDIX B -

MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA

4 0 6 . 7 6 1 . 3 0 1 0 t d h e n g i n e e r i n g . c o m

1 8 0 0 R i v e r D r i v e N o r t h

G r e a t F a l l s , MT 5 9 4 0 1

June 20, 2022

Mr. Jared Grundhauser Malmstrom Air Force Base

341 CES/CEIEC

Malmstrom AFB, MT 59402-7536

RE: PRE-RENOVATION ASBESTOS INSPECTION

BUILDING 145, ADC OFFICES AND RESTROOMS

TD&H ENGINEERING JOB NO. 22-022-075

Dear Mr. Grundhauser, In accordance with our Agreement for Engineering Services, TD&H Engineering, Inc.

(TD&H) performed a limited pre-renovation asbestos inspection of flooring materials within the ADC offices and restrooms on June 8, 2022. This asbestos inspection report must be kept on site during all renovation activities.

PROJECT DESCRIPTION

The building is a 34,851-square-foot, foundation type, 1-story commercial building known as Building 145. TD&H was informed that Malmstrom Air Force personnel are planning alterations that include removing the carpet within the ADC offices and sheet vinyl flooring within the restrooms. The inspection was limited to ADC office rooms 208, 208A, 209, 210, 212, 214, and restroom numbers 202, 210, 324 and 325.

ASBESTOS INSPECTION

The Administrative Rules of Montana (ARM) 17.74.354 require an asbestos inspection be completed for all building materials prior to scheduled renovation activities to determine if asbestos-containing materials (ACM) are present. ACM is defined as any material or product that contains more than 1% asbestos. The National Emissions Standards for Hazardous Air Pollutants [NESHAP – 40 Code of Federal Regulations (CFR) 61], the Occupational Safety and Health Administration (OSHA), and the ARM regulate asbestos due to the respiratory hazard that airborne asbestos fibers present. The inspection was performed by Mr. Corey League of TD&H, a Montana-accredited asbestos inspector, in accordance with the Environmental Protection Agency (EPA) – Asbestos Hazards and Emergency Response Act (AHERA) regulation 40 CFR 763. Documentation of accreditation is provided in Appendix A.

Building materials were identified, categorized, numbered, and placed into homogeneous areas (HAs) for sample collection and laboratory analysis. The number of samples collected from building materials identified during the inspection is based on the following:

June 20, 2022 PAGE NO. 2 t d h e n g i n e e r i n g . c o m

• Surfacing Materials: At least three samples for surfacing materials that are 1,000 square feet (SF) or less, at least five samples for surfacing materials that are greater than 1,000 SF but less than or equal to 5,000 SF, and at least seven samples for surfacing materials that are greater than 5,000 SF.

• Thermal System Insulation: Three samples from each HA of thermal system insulation, which may include but is not limited to boiler insulation, mudded fittings, and expanded vermiculite insulation.

• Miscellaneous Materials: Three samples from each HA of miscellaneous material, such as ceiling tile, wallboard system, cove base mastic, floor tile and mastic, concrete, roofing materials, and brick mortar.

• Materials Less Than Regulated Quantities: At least one sample from each HA of patching material, such as replacement floor tiles or patching plaster, and materials of less than 10 SF in total area, which are not subject to regulation by the {agency} but may still trigger OSHA requirements.

A total of 15 suspect building materials were identified during the inspection. Bulk samples were collected from the building in accordance with the currently recognized standard protocol developed under AHERA. Bulk samples were placed into containers and shipped to CA Labs, LLA (CA Labs) in Baton Rouge, Louisiana, for analysis using Polarized Light Microscopy (PLM) in accordance with the EPA Method 600/R-93/116. CA Labs is accredited through the National Institute of Standards and Technology’s (NIST) National Voluntary Laboratory Accreditation Program (NVLAP). The point-counting technique employed by CA Labs in the analysis of these samples has a limit of detection of approximately 0.1% by volume on samples that contained asbestos at concentrations under 1%.

Four HAs sampled during the inspection were determined by laboratory analysis to contain asbestos in quantities greater than 1%. These HAs are shown in Table 1. The analytical report provided by CA Labs is provided in Appendix B, and sample locations are shown on Figure 1 in Appendix C.

Also shown in Table 1 is a Condition Ranking as detailed in the Malmstrom Air Force Base

Asbestos Management and Operations Plan. The plan lists four rankings as provided by

Mr. Robert Richards. These are detailed below:

• Ranking 1: Asbestos is damaged and poses a health hazard.

• Ranking 2: Asbestos is damaged but does not pose an immediate health hazard.

• Ranking 3: Asbestos is in good condition, does not pose a hazard, but is vulnerable to damage or wear.

• Ranking 4: Asbestos is in good condition and does not pose a hazard under normal conditions.

June 20, 2022 PAGE NO. 3

Table 1 Asbestos-Containing Building Materials

Building 145, ADC Offices and Restrooms

Homogenous Area Description

Asbestos Content

NESHAP

Category

Condition Ranking

Location

F1.5, Yellow and Black Mastic associated with Dark Gray w/ Black Swirls Sheet Vinyl Flooring

(SVF)

3% Chrysotile

Category I

Ranking 3 Room 324

F1.6, Black Mastic Associated with

Beige SVF*

5%

Ranking 3 Room 325

F5.1, Off-White Vinyl Floor Tile*

2%

Ranking 4

ADC Offices (Rooms 208, 208A, 209, 210, 212, 214)

M8.1, Black Mastic* 4%

Ranking 4

ADC Offices (Rooms 208, 208A, 209, 210, 212, 214)

All other HAs are listed as “None Detected” and are shown in Table 2. The analytical report provided by CA Labs is provided in Appendix B. Sample identification and locations are shown in Appendix C.

Table 2 Non-Asbestos-Containing Building Materials

Building 145, ADC Offices and Restrooms

Homogenous Area (HA)

Sample Description Location-Room

F1.1 Brown Wavy Patterned SVF Room 210

F1.2 Gray w/ White & Black Specks SVF Room 210

F1.3 Beige SVF Room 202

F1.4 Light Gray Wavy Pattern SVF Room 324

F4.1* White Leveling Compound Room 325

M4.3 Blue-Gray w/ Specks Carpet/Beige Mastic

ADC Offices (Rooms 208, 208A, 209, 210, 212, 214)

N1.1 Beige Mortar associated w/ Beige 7”x7” Ceramic Wall Tile

Rooms 210, 202, 324, 325

N2.4 Dark Gray Sealant Room 210

N2.5 Bluish-Gray Sealant Rooms 324

N2.6* Beige SVF Seam Sealant Rooms 210, 202, 324, 325

June 20, 2022 PAGE NO. 4

S1.1 White Wall Texture ADC Offices (Rooms 208, 208A, 209, 210, 212, 214)

*Non-ACM white leveling compound was identified in samples F1.6A/N2.6A, F1.6C/N2.6C/F4.1A, and F5.1C/M8.1C.

Following receipt of the laboratory report, building materials containing asbestos were placed into one of the following three categories using NESHAP criteria:

• Category I: Non-friable 1 asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products – all containing more than 1% asbestos.

• Category II: All non-friable materials containing more than 1% asbestos except those found in Category I.

• Regulated Asbestos-Containing Materials (RACM): Friable materials, Category I non-friable materials that will or may be subjected to sanding, grinding, cutting, or abrading; or Category II non-friable materials that have a high probability of becoming or have become crumbled, pulverized, or reduced to powder by forces expected to act on the material in the course of demolition/renovation operations.

According to NESHAP regulation 40 CFR 61.145 (c)(1)(i) and ARM 17.74, any RACM or Category I or II ACM that may be rendered friable during demolition or renovation activities must be properly abated prior to beginning the project, which must be overseen by someone with training as a “competent person” per OSHA. NESHAP also requires that any demolition or renovation activities be free of visible dust or fugitive emissions from any regulated substances, including asbestos. All building materials should be adequately wetted to prevent release of particulate. Depending on the type of renovation planned, OSHA and state regulations may require personal air monitoring and the use of engineering controls.

It is a requirement under NESHAP regulations that at least ten working days prior to an asbestos abatement project, a written notification must be provided to the EPA. In the State of Montana, notification of asbestos abatement is sent to the Montana Department of Environmental Quality (MDEQ), Permitting and Compliance Division – Asbestos Control Program.

RECOMMENDATIONS

Asbestos Four areas of ACM were identified. The Category I materials were non-friable at the time of the inspection and, if maintained in a non-friable state, may be removed in an unregulated fashion under state and federal law. Any grinding, sawing, abrading, or pulverizing of the Category I asbestos-containing materials will render those materials friable and regulated (RACM).

1 Friable means able to be crushed or reduced to powder by hand pressure when dry, or similarly broken or pulverized mechanically.

June 20, 2022 PAGE NO. 5

Per OSHA, asbestos removal for Category I or II ACM in a non-friable “intact” condition must be overseen by a “competent person” holding current Montana accreditation as an Asbestos Contractor/Supervisor. If these materials are removed in a non-friable manner, asbestos abatement permitting will not be required. Limited air monitoring may be necessary for OSHA compliance.

The MDEQ considers all categories of asbestos-containing material to be “special waste” under Montana Solid Waste Rules. Transport of RACM waste is regulated and will require a permit. RACM waste must also be segregated from the general renovation waste for disposal in the designated asbestos disposal area at a local landfill that is licensed to accept asbestos-containing material. Many landfills require that all categories of ACM be segregated from the general demolition waste stream. RACM must be double-bagged or double-wrapped in 6-mil plastic sheeting; non-RACM may be single-wrapped. All material must be wrapped “burrito style” with taped seams. The name and contact information of the owner must be provided in each waste package. We recommend that potential landfills for clarification be contacted prior to bidding or disposal.

Malmstrom Air Force Base Asbestos Management and Operations Plan as described above also includes recommendations for performing Operations and Maintenance (O&M) for each HA identified as ACM. The recommendations as supplied by Mr. Richards are as follows:

• Ranking 1: Coordinate immediate removal or abatement.

• Ranking 2: Qualified personnel to control or encapsulate as soon as possible.

• Ranking 3: Schedule periodic re-inspection to ensure the area remains stable. This applies particularly to potentially friable asbestos, such as mechanical room TSI.

• Ranking 4: Schedule periodic re-inspection to ensure the area remains stable.

The ACM identified in this inspection received Condition 3 and 4 Rankings. The recommended O&M ranking will be Ranking 4.

LIMITATIONS

This asbestos and lead-in-paint inspection report was prepared based on information gathered during one site visit and interpretations of laboratory analytical results provided by CA Labs. The inspection report is intended to provide information concerning the various types of building materials that were considered suspect for containing asbestos and to inform you of which building materials tested positive.

Additional suspect materials may be encountered during renovation activities. If work will disturb materials in addition to those included in this report, TD&H should be contacted and may need to be present during these activities.

We appreciate this opportunity to provide these industrial hygiene-consulting services to you and look forward to assisting you through the remainder of the project. Should you have questions or need further clarification about information contained herein, please feel free to contact us at (406) 761-3010.

June 20, 2022 PAGE NO. 6

Sincerely, Corey League CHMM Matt McGee PE MTA-5902 Exp. 2022.11.04 MTA-3854 Exp. 2023.04.21 Project Manager Engineer/Principal

TD&H ENGINEERING TD&H ENGINEERING

APPENDICES: A DOCUMENTATION OF ACCREDITATION

B ASBESTOS LABORATORY REPORT

C ASBESTOS SAMPLE LOCATIONS

J:\2022\22-022 MAFB Various IH\INDUSTRIAL HYGIENE\075_Bldg 145 Floor Inspection\Working\22-022-075 Asbestos Inspection Report.doc

APPENDIX A

DOCUMENTATION OF

ACCREDITATION

has met the requirements of Montana Administrative Rule

17.74.362 and/or 17.74.363 for accreditation in the following asbestos occupation(s) through the specified expiration date(s).

HOMER C LEAGUE

H O

M E

R C

L E

A G

U E

S

T A

V E

N W

G R

E A

T F

A L

L S

M T

MTA-5902

Asbestos Inspector Project Contractor/Supervisor Project Designer

11/04/2022 02/11/2023 09/09/2022

MT DEQ Asbestos Control Program

APPENDIX B

ASBESTOS LABORATORY

REPORT

Attn:

Customer Project:

Reference #: Date: 6/15/2022

Analysis and Method

Discussion

Qualifications

Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be detectable by PLM analysis and should be analyzed by TEM bulk protocols.

A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.

Quantification of <1% will actually be reported as <=1% (allowable variance close to 1% is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.

CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. This report is not covered by the scope of AIHA accreditation. Analysis performed at CA Labs, LLC 12232 Industriplex, Suite 32 Baton Rouge, LA 70809.

1800 River Drive North

Great Falls, MT 59401

MAFB B145

CBR22064586

Summary of polarizing light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763

Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereomicroscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).

Vermiculite containing samples may have trace amounts of actinolite-tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.

Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light

TD & H Engineering Jeremiah Harris

Labs

A

C

Overview of Project Sample Material Containing Asbestos

Customer Project: MAFB B145 CA Labs Project #: CBR22064586

Yellow and Black Mastic

Tan Floor Tile

Black and Yellow Mastic

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

F5.1B/M8.1

B

F5.1B

/M8.1

B-2 Black Mastic 4% Chrysotile

F5.1A/M8.1

A

F5.1A

/M8.1

A-2 Black Mastic 4% Chrysotile

F5.1B/M8.1

B

F5.1B

/M8.1

B-1 Tan Floor Tile 2% Chrysotile

F1.6C/N2.6

C/F4.1A

F1.6C/

N2.6C/

F4.1A-

4 Black Mastic 5% Chrysotile

F5.1A/M8.1

A

F5.1A

/M8.1

A-1 Tan Floor Tile 2% Chrysotile

F1.5B F1.5B-

2 Yellow and Black Mastic 3% Chrysotile

F1.5C F1.5C-

2 Yellow and Black Mastic 3% Chrysotile

F1.5A F1.5A-

2 Yellow and Black Mastic 3% Chrysotile

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Sample # Layer

Analysts Physical Description of

Subsample

Asbestos type / calibrated visual estimate percent

List of Affected Building

Material Types

Labs

A

Overview of Project Sample Material Containing Asbestos

Customer Project: MAFB B145 CA Labs Project #: CBR22064586

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

F5.1C/M8.1

C

F5.1C

/M8.1

C-2 Black and Yellow Mastic 2% Chrysotile

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Sample # Layer

Analysts Physical Description of

Subsample

Asbestos type / calibrated visual estimate percent

List of Affected Building

Material Types

Labs

A

Polarized Light Asbestiform Materials Characterization

Customer Info: Attn: Customer Project:

6/15/2022

6/9/2022

Phone # 6/8/2022

Fax # 22-022-075

Laboratory Director

Chris Williams

1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers

2. Fire Damage no significant fiber damages effecting fibrous percentages

3. Actinolite in association with Vermiculite

4. Layer not analyzed - attached to previous positive layer and contamination is suspected

5. Not enough sample to analyze

6. Anthophyllite in association with Fibrous Talc

7. Contamination suspected from other building materials

8. Favorable scenario for water separation on vermiculite for possible analysis by another method

9. < 1% Result point counted positive

10. TEM analysis suggested

Sidney Pinkerton Senior Analyst

Analyst Alicia Stretz

20% ce 80% qu, ma

Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)

Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:

F1.2B/N2.4

B

F1.2B

/N2.4

B-1 Gray Linoleum Y None Detected

20% ce 80% qu, ma

F1.2A

/N2.4

A-2 Yellow Mastic Y None Detected 100% qu, bi

F1.2A/N2.4

A

F1.2A

/N2.4

A-1 Gray Linoleum Y None Detected

30% ce 70% qu, ma

F1.1C

/N2.4

C-2 Yellow and Gray Mastic N None Detected 100% qu, ma, bi

F1.1C/N2.4

C

F1.1C

/N2.4

C-1

Gray Linoleum with Tan Woven

Backing Y None Detected

70% qu, ma

F1.1B F1.1B-

Gray Linoleum with Tan Woven

Backing Y None Detected 30% ce 70% qu, ma

Asbestos type / calibrated visual estimate percent

Non-asbestos fiber type / percent

Non-fibrous type

/ percent

F1.1A F1.1A-

Gray Linoleum with Tan Woven

Backing Y None Detected 30% ce

406-761-3010 5 day Date Of Sampling:

406-727-2872 Purchase Order #:

Sample # Com ment

Layer

Analysts Physical Description of

Subsample

Homo-geneo us

(Y/N)

TD & H Engineering MAFB B145 CBR22064586

1800 River Drive North

Great Falls, MT 59401 Date:

Turnaround Time: Samples Received:

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Jeremiah Harris CA Labs Project #:

Labs

A

6/15/2022

6/9/2022

Phone # 6/8/2022

Fax # 22-022-075

Laboratory Director

Chris Williams

1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers

2. Fire Damage no significant fiber damages effecting fibrous percentages

3. Actinolite in association with Vermiculite

4. Layer not analyzed - attached to previous positive layer and contamination is suspected

5. Not enough sample to analyze

6. Anthophyllite in association with Fibrous Talc

7. Contamination suspected from other building materials

8. Favorable scenario for water separation on vermiculite for possible analysis by another method

9. < 1% Result point counted positive

10. TEM analysis suggested

Sidney Pinkerton Senior Analyst

Analyst Alicia Stretz

30% ce 70% qu, ma

Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)

Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:

F1.4A F1.4A-

Gray Linoleum with Tan Woven

Backing Y None Detected

30% ce 70% qu, ma

F1.3C F1.3C-

Gray Linoleum with Gray

Woven Backing Y None Detected 30% ce 70% qu, ma

F1.3B F1.3B-

Gray Linoleum with Gray

Woven Backing Y None Detected

100% qu, bi

F1.3A F1.3A-

Gray Linoleum with Gray

Woven Backing Y None Detected 30% ce 70% qu, ma

F1.2C-

2 Yellow Mastic Y None Detected

100% qu, bi

F1.2C F1.2C-

1 Gray Linoleum Y None Detected 20% ce 80% qu, ma

Asbestos type / calibrated visual estimate percent

Non-asbestos fiber type / percent

Non-fibrous type

/ percent

F1.2B

/N2.4

B-2 Yellow Mastic Y None Detected

406-761-3010 5 day Date Of Sampling:

406-727-2872 Purchase Order #:

Sample # Com ment

Layer

Analysts Physical Description of

Subsample

Homo-geneo us

(Y/N)

TD & H Engineering MAFB B145 CBR22064586

1800 River Drive North

Great Falls, MT 59401 Date:

Turnaround Time: Samples Received:

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Jeremiah Harris CA Labs Project #:

Labs

A

6/15/2022

6/9/2022

Phone # 6/8/2022

Fax # 22-022-075

Laboratory Director

Chris Williams

1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers

2. Fire Damage no significant fiber damages effecting fibrous percentages

3. Actinolite in association with Vermiculite

4. Layer not analyzed - attached to previous positive layer and contamination is suspected

5. Not enough sample to analyze

6. Anthophyllite in association with Fibrous Talc

7. Contamination suspected from other building materials

8. Favorable scenario for water separation on vermiculite for possible analysis by another method

9. < 1% Result point counted positive

10. TEM analysis suggested

Sidney Pinkerton Senior Analyst

Analyst Alicia Stretz

20% ce 80% qu, ma

Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)

Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:

F1.5C F1.5C-

1 Tan Linoleum Y None Detected

20% ce 80% qu, ma

F1.5B-

2 Yellow and Black Mastic N 3% Chrysotile 97% qu, bi

F1.5B F1.5B-

1 Tan Linoleum Y None Detected

20% ce 80% qu, ma

F1.5A-

2 Yellow and Black Mastic N 3% Chrysotile 97% qu, bi

F1.5A F1.5A-

1 Tan Linoleum Y None Detected

70% qu, ma

F1.4C F1.4C-

Gray Linoleum with Tan Woven

Backing Y None Detected 30% ce 70% qu, ma

Asbestos type / calibrated visual estimate percent

Non-asbestos fiber type / percent

Non-fibrous type

/ percent

F1.4B F1.4B-

Gray Linoleum with Tan Woven

Backing Y None Detected 30% ce

406-761-3010 5 day Date Of Sampling:

406-727-2872 Purchase Order #:

Sample # Com ment

Layer

Analysts Physical Description of

Subsample

Homo-geneo us

(Y/N)

TD & H Engineering MAFB B145 CBR22064586

1800 River Drive North

Great Falls, MT 59401 Date:

Turnaround Time: Samples Received:

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Jeremiah Harris CA Labs Project #:

Labs

A

6/15/2022

6/9/2022

Phone # 6/8/2022

Fax # 22-022-075

Laboratory Director

Chris Williams

1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers

2. Fire Damage no significant fiber damages effecting fibrous percentages

3. Actinolite in association with Vermiculite

4. Layer not analyzed - attached to previous positive layer and contamination is suspected

5. Not enough sample to analyze

6. Anthophyllite in association with Fibrous Talc

7. Contamination suspected from other building materials

8. Favorable scenario for water separation on vermiculite for possible analysis by another method

9. < 1% Result point counted positive

10. TEM analysis suggested

Sidney Pinkerton Senior Analyst

Analyst Alicia Stretz

100% qu, bi

Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)

Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br -…