About this file

This document is a Q&A sheet related to Solicitation FA4626-24-Q-0029 for Building 145 Restroom Flooring at Malmstrom AFB. The key details are:

The solicitation is for the abatement and disposal of asbestos-containing materials, removal of existing flooring, and installation of approximately 112 square yards of resilient sheet flooring and 75 linear feet of 4-inch rubber cove base in various rooms of Building 145. The PWS provides additional details on the requirements. A site visit is scheduled for April 30, 2024 at 2:00 pm, and questions are due by April 27, 2024. The existing flooring is a combination of linoleum sheet and VCT tile. The contractor will be responsible for removing the stall divider floor mounts, but the agency will remove the wall-mounted toilets. Photos of the areas are provided in Attachment 3.

View the file

Other files for this federal contract opportunity

Other files attached to Building 145 Restroom Flooring - Malmstrom AFB, newest first.
File Type Posted
Amendment 001.pdf PDF
Atch 3_B145 Bathrooms Photos.pdf PDF
COMBO_8 April 2024.pdf PDF
Atch 2_Installation Perimeter Access Control.pdf PDF
Atch 1_PWS_Bldg 145 Flooring..pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Building 145 Flooring: FA4626-24-Q-0029
Questions and Answers
Question #QuestionAnswer
1Please clarify if any materials on the walls need to be demolished. For example rubber base, tile, etc.Approximately 75 linear feet of 4” rubber cove base will have to be removed and replaced on drywall surfaces only, not the tiled surfaces. See para 3.1 and 3.3 of PWS.
2Who will be removing the existing fixtures in the restrooms for the installation of the new flooring?The toilets are wall mount, the only thing the contractor will have to deal with is the stall divider floor mounts.
3What flooring is existing in the work areas?Combination linoleum sheet flooring and VCT tile at entry.
4Can a site visit be scheduled for early next week?Yes, a site visit will be held on Tuesday, 30 April 2024 at 2:00 p.m. Please meet at Building 145, Room 305. If attending the site visit, please email viviana.castillo_ramirez@us.af.mil to request a CEAL by 2:00 pm 26 April 2024.
5Please provide photos of the areas.See Attachment 3.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

&"Times New Roman,Regular"&P of &N

Sheet2

remove draft stamp
topr may 4th 3 pm
questions due by the 27th of April
Wage Determination
Skim through TOPR

File details come from the government source that posted it. Updated .