Buckley SFB Grounds Maintenance

Closed Solicitation Posted

Solicitation number
FA254325Q0019
Agency
Responses due
Set-aside
HUBZone

Opportunity facts

NAICS code
561730 Landscaping Services
Place of performance
Aurora, Colorado 80011, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Space Command is seeking a contractor to provide comprehensive grounds maintenance services at Buckley Space Force Base in Colorado through solicitation FA254325Q0019. The contractor must provide all personnel, equipment, tools, and supervision necessary to maintain approximately 1,453 total acres including improved grounds (75.21 acres), semi-improved grounds (365.4 acres), and unimproved grounds (812.2 acres), along with vegetative beds, surface drainage ditches, and specialized services such as xeriscaping, tree care, and emergency response. Key requirements include maintaining grass heights between specified ranges, managing irrigation systems, implementing integrated pest management, and complying with Colorado Regulation 29 which restricts gasoline-powered equipment use from June through August. The government will use a Lowest Price Technically Acceptable (LPTA) evaluation methodology, assessing technical capability through management/staffing plans and transition plans, along with past performance citations demonstrating recent grounds maintenance experience. The quote submission deadline is 4:00 PM MST on July 9, 2025, with a mandatory site visit conducted on June 24, 2025.

This opportunity is designated as a HUBZone small business set-aside under NAICS code 561730 with a size standard of $9.5 million. The current incumbent contractor is Roberts Treescaping, LLC, though no specific contract value or budget range is disclosed in the solicitation documents. The contract structure includes a base year running from August 1, 2025, through July 31, 2026, followed by four additional one-year option periods extending through January 2031, plus a potential six-month extension. The performance will take place at Buckley Space Force Base in Aurora, Colorado, with the contractor required to provide their own office trailer and temporary facilities at their expense. The scope includes maintaining various specialized areas such as athletic fields, rock beds, and surface drainage systems, with specific annual workload estimates including 325 tree pruning events and 35 tree and stump removals.

Notice text

6 versions

Update #6 · Latest ·

AMENDMENT 5 - The purpose of Amendment 5 is to add to Questions & Answers for clarification.

AMENDMENT 4 - The purpose of Amendment 4 is to:

1) Upload/Update the RFQ COMBO document and SAM.gov to extend the due date.

2) Upload the Questions & Answers.

3) Upload Attachment 2 - PWS with tracked changes. 

4) Upload 29 photos.

5) Upload Attachment 4 - Work Order Price List - That adds Option Periods.

6) Upload Grounds Site Visit Log.

AMENDMENT 3 - The purpose of Amendment 3 is to update the RFQ COMBO document.  Both a Tracked Changes and Clean copy were uploaded.

AMENDMENT 2 - The purpose of Amendment 2 is to upload Appendix G - Irrigation As- Builts which was not orginally attached. 

AMENDMENT 1 - The purpose of Amendment 1 is to update the RFQ COMBO Site Visit date and language and to update the Question and Answer due date. Section 1.10 of the RFQ COMBO was updated as follows:

All questions regarding this solicitation shall be submitted via email no  later than 3:00pm MST on 25 June 2025 to the POCs at the email addresses provided above. Any questions shall be provided to the points of contact listed in Section 1.6. via email. A formal  site visit will be conducted on 24 June 2025 at 10:00am MST to allow prospective offerors the  opportunity to  inspect the site and assess the conditions relevant to the performance of this  requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 20 June 2025. Contractors should limit the number of attendees to 2-3 attendees. This site visit will serve as the only opportunity to view the site prior to the RFQ  closing and before contract award.

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

Update #5 ·

AMENDMENT 4 - The purpose of Amendment 4 is to:

1) Upload/Update the RFQ COMBO document and SAM.gov to extend the due date.

2) Upload the Questions & Answers.

3) Upload Attachment 2 - PWS with tracked changes. 

4) Upload 29 photos.

5) Upload Attachment 4 - Work Order Price List - That adds Option Periods.

6) Upload Grounds Site Visit Log.

AMENDMENT 3 - The purpose of Amendment 3 is to update the RFQ COMBO document.  Both a Tracked Changes and Clean copy were uploaded.

AMENDMENT 2 - The purpose of Amendment 2 is to upload Appendix G - Irrigation As- Builts which was not orginally attached. 

AMENDMENT 1 - The purpose of Amendment 1 is to update the RFQ COMBO Site Visit date and language and to update the Question and Answer due date. Section 1.10 of the RFQ COMBO was updated as follows:

All questions regarding this solicitation shall be submitted via email no  later than 3:00pm MST on 25 June 2025 to the POCs at the email addresses provided above. Any questions shall be provided to the points of contact listed in Section 1.6. via email. A formal  site visit will be conducted on 24 June 2025 at 10:00am MST to allow prospective offerors the  opportunity to  inspect the site and assess the conditions relevant to the performance of this  requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 20 June 2025. Contractors should limit the number of attendees to 2-3 attendees. This site visit will serve as the only opportunity to view the site prior to the RFQ  closing and before contract award.

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

Update #4 ·

AMENDMENT 3 - The purpose of Amendment 3 is to update the RFQ COMBO document.  Both a Tracked Changes and Clean copy were uploaded.

AMENDMENT 2 - The purpose of Amendment 2 is to upload Appendix G - Irrigation As- Builts which was not orginally attached. 

AMENDMENT 1 - The purpose of Amendment 1 is to update the RFQ COMBO Site Visit date and language and to update the Question and Answer due date. Section 1.10 of the RFQ COMBO was updated as follows:

All questions regarding this solicitation shall be submitted via email no  later than 3:00pm MST on 25 June 2025 to the POCs at the email addresses provided above. Any questions shall be provided to the points of contact listed in Section 1.6. via email. A formal  site visit will be conducted on 24 June 2025 at 10:00am MST to allow prospective offerors the  opportunity to  inspect the site and assess the conditions relevant to the performance of this  requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 20 June 2025. Contractors should limit the number of attendees to 2-3 attendees. This site visit will serve as the only opportunity to view the site prior to the RFQ  closing and before contract award.

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

Update #3 ·

AMENDMENT 2 - The purpose of Amendment 2 is to upload Appendix G - Irrigation As- Builts which was not orginally attached. 

AMENDMENT 1 - The purpose of Amendment 1 is to update the RFQ COMBO Site Visit date and language and to update the Question and Answer due date. Section 1.10 of the RFQ COMBO was updated as follows:

All questions regarding this solicitation shall be submitted via email no  later than 3:00pm MST on 25 June 2025 to the POCs at the email addresses provided above. Any questions shall be provided to the points of contact listed in Section 1.6. via email. A formal  site visit will be conducted on 24 June 2025 at 10:00am MST to allow prospective offerors the  opportunity to  inspect the site and assess the conditions relevant to the performance of this  requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 20 June 2025. Contractors should limit the number of attendees to 2-3 attendees. This site visit will serve as the only opportunity to view the site prior to the RFQ  closing and before contract award.

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

Update #2 ·

AMENDMENT 1 - The purpose of Amendment 1 is to update the RFQ COMBO Site Visit date and language and to update the Question and Answer due date. Section 1.10 of the RFQ COMBO was updated as follows:

All questions regarding this solicitation shall be submitted via email no  later than 3:00pm MST on 25 June 2025 to the POCs at the email addresses provided above. Any questions shall be provided to the points of contact listed in Section 1.6. via email. A formal  site visit will be conducted on 24 June 2025 at 10:00am MST to allow prospective offerors the  opportunity to  inspect the site and assess the conditions relevant to the performance of this  requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 20 June 2025. Contractors should limit the number of attendees to 2-3 attendees. This site visit will serve as the only opportunity to view the site prior to the RFQ  closing and before contract award.

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

Update #1 ·

The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Buckley Space Force Base (SFB) in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and Areas Maps or Site Plans are in Appendix B of the Performance Work Statement (PWS).

The contractor will provide Buckley SFB with services in accordance with the PWS, specifically to maintain improved grounds, maintain semi-improved grounds, maintain unimproved grounds, maintain vegetative, inert beds, and related areas, maintain surface drainage ditches, provide special requirements such as: emergency and special event services, xeriscaping, special cuts, and tree care.

A formal site visit will be conducted on 20 June 2025 at 10:00am MST to allow prospective offerors the opportunity to inspect the site and assess the conditions relevant to the performance of this requirement. The contractor shall provide the names of all members attending the site visit to the POCs listed in 1.6. by 3:00pm MST on 18 June 2025. This site visit will serve as the only opportunity to view the site prior to the RFQ closing and before contract award. Please contact the Contract Specialist and Contracting Officer listed as soon as possible prior to the 18 June deadline to inform of your intent to attend the site visit.  

Files

File Type Posted
Amendment 5 - FA254325Q0019 RFI Questions - with answers.pdf PDF
Attachment 4 - Work Order Price List 30 June 2025.pdf PDF
Chapel South.jpg JPG image
FA254325Q0019 RFI Questions - with answers.pdf PDF
Amendment 4 - RFQ COMBO - Instructions and Basis of Award 01 July 2025.pdf PDF
FSS 1 NE Corner.jpg JPG image
Attachment 2 - Buckley Grounds Maintenace PWS 27 June 2025 with Changes.pdf PDF
BUCKLEY SFB Site Visit Log.pdf PDF
HQ 2 West Side.jpg JPG image
FSS 1 SE Corner.jpg JPG image
FSS North.jpg JPG image
HQ East Side.jpg JPG image
HQ 1 North Side.jpg JPG image
Laydown Yard.jpg JPG image
FSS SW Corner.jpg JPG image
FSS East.jpg JPG image
HQ NW Corner.jpg JPG image
HQ SW Corner.jpg JPG image
HQ 2 East Side.jpg JPG image
FSS 1 North.jpg JPG image
HQ 1 West Side.jpg JPG image
HQ West Side.jpg JPG image
Laydown Yard South Entrance.jpg JPG image
FSS SE Corner.jpg JPG image
Chapel 2 East.jpg JPG image
Chapel SE Chapel.jpg JPG image
Chapel East.jpg JPG image
HQ 1 SW Corner.jpg JPG image
Chapel North.jpg JPG image
FSS NE Corner.jpg JPG image
Laydown Yard 1 North Entrance.jpg JPG image
Laydown Yard North Entrance.jpg JPG image
HQ 3 East Side.jpg JPG image
Chapel 1 East.jpg JPG image
HQ 1 East Side.jpg JPG image
Amendment 3 - RFQ COMBO - Instructions and Basis of Award 27 June 2025 - Clean Copy.pdf PDF
Amendment 3 - RFQ COMBO - Instructions and Basis of Award 27 June 2025 - Tracked Changes.pdf PDF
Appendix G - Irrigation As-builts 2018.pdf PDF
Amendment 1 - RFQ COMBO - Instructions and Basis of Award 13 June 2025.pdf PDF
Appendix B - 2. Improvement_Map.pdf PDF
Appendix B- 1. Master Grounds_Map.pdf PDF
Attachment 1 - FA254325Q0019 - Solicitation.pdf PDF
Appendix H - Lawn and Garden Guidance Final.pub.pdf PDF
Appendix F - Land Use Control Sites.pdf PDF
Appendix B - 3. Grounds_Map_Edge Trim.pdf PDF
Attachment 2 - Buckley Grounds Maintenace PWS FINAL 11 June 2025.pdf PDF
Attachment 4 - Work Order Price List 12 June 2025.pdf PDF
Appendix B - 4. Surface Drainage.pdf PDF
Appendix E - BSFB Asbestos 2024.pdf PDF
Appendix H - Reg 29 Lawn and Garden Equipment.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Grounds Maintenance Services Praia Da Vitoria Azores 9760- Portugal · NAICS 561730 Air Forces Europe and Africa No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity