Appendix B- 1. Master Grounds_Map.pdf

PDF 6 MB Posted

Attached to
Buckley SFB Grounds Maintenance
Solicitation number
FA254325Q0019
Issued by

About this file

The document is a grounds maintenance map for Buckley Space Force Base dated 11 Nov 2024, prepared by the 460th Civil Engineer Squadron GeoBase Office. The map details the ground maintenance requirements across 1,257.55 total acres, categorized into three distinct maintenance zones:

  1. Improved Grounds (75.21 acres): Requires comprehensive maintenance including mowing (2.5"-5"), edging, trimming, leaf removal, fertilization, debris collection, irrigation, weed/pest control, pruning, and potential lawn renovation. 2. Semi-Improved Grounds (365.4 acres): Involves mowing (4"-10"), trimming, and weed control in rock beds. 3. Unimproved Grounds (812.2 acres): Requires annual mowing to a height between 6"-24". Additional areas include 9.9 acres of rock beds, 0.24 acres of turf, and 3.6 acres of athletic fields. The map provides a detailed visual representation of the base's ground maintenance zones, building locations, installation boundaries, and specific maintenance requirements for each area.

View the file

Other files

File Type Posted
Amendment 5 - FA254325Q0019 RFI Questions - with answers.pdf PDF
Chapel SE Chapel.jpg JPG image
Chapel North.jpg JPG image
Laydown Yard 1 North Entrance.jpg JPG image
HQ 3 East Side.jpg JPG image
HQ 1 East Side.jpg JPG image
FA254325Q0019 RFI Questions - with answers.pdf PDF
Attachment 2 - Buckley Grounds Maintenace PWS 27 June 2025 with Changes.pdf PDF
FSS 1 SE Corner.jpg JPG image
HQ 1 North Side.jpg JPG image
FSS East.jpg JPG image
HQ 2 East Side.jpg JPG image
HQ West Side.jpg JPG image
Chapel 2 East.jpg JPG image
HQ 1 SW Corner.jpg JPG image
Chapel South.jpg JPG image
FSS 1 NE Corner.jpg JPG image
HQ 2 West Side.jpg JPG image
HQ East Side.jpg JPG image
FSS SW Corner.jpg JPG image
HQ SW Corner.jpg JPG image
HQ 1 West Side.jpg JPG image
FSS SE Corner.jpg JPG image
Chapel East.jpg JPG image
FSS NE Corner.jpg JPG image
Laydown Yard North Entrance.jpg JPG image
Chapel 1 East.jpg JPG image
Attachment 4 - Work Order Price List 30 June 2025.pdf PDF
Amendment 4 - RFQ COMBO - Instructions and Basis of Award 01 July 2025.pdf PDF
BUCKLEY SFB Site Visit Log.pdf PDF
FSS North.jpg JPG image
Laydown Yard.jpg JPG image
HQ NW Corner.jpg JPG image
FSS 1 North.jpg JPG image
Amendment 3 - RFQ COMBO - Instructions and Basis of Award 27 June 2025 - Tracked Changes.pdf PDF
Amendment 3 - RFQ COMBO - Instructions and Basis of Award 27 June 2025 - Clean Copy.pdf PDF
Appendix G - Irrigation As-builts 2018.pdf PDF
Amendment 1 - RFQ COMBO - Instructions and Basis of Award 13 June 2025.pdf PDF
Appendix B - 3. Grounds_Map_Edge Trim.pdf PDF
Appendix B - 4. Surface Drainage.pdf PDF
Appendix E - BSFB Asbestos 2024.pdf PDF
Appendix H - Reg 29 Lawn and Garden Equipment.pdf PDF
Attachment 3 - WD 2015-5419 Rev 28 dated 23 Dec 24.txt TXT text file
RFQ COMBO - Instructions and Basis of Award 12 June 2025.pdf PDF
Appendix F - Land Use Control Sites.pdf PDF
Attachment 4 - Work Order Price List 12 June 2025.pdf PDF
Appendix B - 2. Improvement_Map.pdf PDF
Appendix H - Lawn and Garden Guidance Final.pub.pdf PDF
Attachment 1 - FA254325Q0019 - Solicitation.pdf PDF
Attachment 2 - Buckley Grounds Maintenace PWS FINAL 11 June 2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ù!C

1525 1522

17906

914 915 916 917

21118

TBD

525 TBD

T-1012

41 40

TBD

850 851

415 414

3-3 3-1 3-2

405421 406422

420 409

404 620

426 418425

630460

TBD

485 471

350 351

423428

470465

494 490

493207

14 T-11

T-10

IMPROVED GROUNDS:

- Mow ( 2.5" - 5" )

- Edge

- Trim

- Leaf Removal

- Fertilization

- Remove Debris/Litter

- Collect Dead Animals

- Irrigation

- Weed/Pest Control

- Prune Shrubs/Hedges/Plants

- Lawn Renovation (per work order on cost reimbursable basis)

SEMI-IMPROVED GROUNDS:

- Mow ( 4" - 10" )

- Trim

- Weed Control Spray/Pull Rock Beds

UNIMPROVED GROUNDS:

- Once per year to a height not to exceed 24" but no less than 6"

AREA:

- Improved Grounds

- Semi-Improved Grounds

- Unimproved Grounds

- Rock Beds

- Turf

- Athletic Fields

ACRES

75.21 365.4 812.2

9.9 0.24 3.6

11 Nov 2024 Buckley Space Force Base Grounds Maintenance Map

Coordinate System: WGS 1984 UTM Zone 13N

This map is for reference and planning purposes only and is not meant to be used for engineering or survey work. Every reasonable effort has been made to assure the accuracy of this map and associated data.

Information safeguarding is the responsibility of the individual/agency/company requesting and taking possession of this map. Release or reproduction of this map, or any part of it is prohibited except for official use only. No public publication of this map by any means is authorized. This map must be destroyed properly. Direct any questions in regards to this policy to the Buckley AFB Geospatial Information Officer at 720-847-9309 or DSN 847-9309. Information Safeguarding requirements are per DoDD 5205.02E, DoDM 5200.01-V4, AFI 10-701, AFI 16-1404, AFI 33-332, AFI 32-10112, DoDI 8130.01, DoD Reg 5400.11, AFI 14- 132, and Executive Order 12958 (when applicable).

This map is for reference and planning purposes only and is not meant to be used for engineering or survey work. Every reasonable effort has been made to assure the accuracy of this map and associated data.

Information safeguarding is the responsibility of the individual/agency/company requesting and taking possession of this map. Release or reproduction of this map, or any part of it is prohibited except for official use only. No public publication of this map by any means is authorized. This map must be destroyed properly. Direct any questions in regards to this policy to the Buckley AFB Geospatial Information Officer at 720-847-9309 or DSN 847-9309. Information Safeguarding requirements are per DoDD 5205.02E, DoDM 5200.01-V4, AFI 10-701, AFI 16-1404, AFI 33-332, AFI 32-10112, DoDI 8130.01, DoD Reg 5400.11, AFI 14- 132, and Executive Order 12958 (when applicable).

Prepared By: Buckley Geospatial Information Office (GeoBase)

In Accordance With AFI 32-10112 and AFI 16-1404:

460th Civil Engineer Squadron GeoBase Office

660 S Aspen St (Stop 86), Building 1005 Buckley SFB, Colorado 80011

P: 720-847-9309 or 720-847-7670 Web: https://maps.af.mil

0 400 800 1,200 1,600200

Feet

0 150 300 450 60075

Meters

Legend ù!C Control Tower

}} }} Fence

Wetland

Campsite

Buildings

Pavements

Playground

Recreation Area

Installation Boundary

Storm Water Reservoir

Grounds Maintenance

Improved Turf Semi-Improved Athletic Field Rockbed Unimproved No Work

Semi_Improved

MetalShed

Improved https://maps.af.mil

File details come from the government source that posted it. Updated .