Buckley SFB Crosswalk & Speed Hump Striping/Signage

Closed Solicitation Posted

Solicitation number
FA254325Q0050
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Aurora, Colorado 80011, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Space Command is procuring commercial construction services to install striping and signage for crosswalks and speed humps at Buckley Space Force Base in Colorado. The contractor must provide all labor, materials, equipment, transportation, and supervision necessary to perform striping, restriping, and signage work across 12 different crosswalk locations throughout the base. The work includes installing crosswalk markings, stop bars, and appropriate signage in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), using specific paint types including low-temperature acrylic waterborne paint for parking spaces and epoxy paint for handicap markings. The evaluation will be conducted on a lowest price technically acceptable basis, with no performance or payment bonds required. Site visit requests are due by September 23, 2025 at 1:00 PM MDT, questions must be submitted by 3:00 PM MST on September 25, 2025, and quotes are due by 3:30 PM MST on September 26, 2025.

This solicitation is designated as a Total Small Business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction) with a size standard of $45 million in annual receipts. No specific incumbent contractors are identified in the available documentation. While no exact contract value is provided, this is a firm-fixed-price arrangement for what appears to be a relatively modest scope of work focused on restriping and signage installation. The contractor will have 30 calendar days to begin performance after receiving the notice to proceed and must complete the work within 180 calendar days. The place of performance is Buckley Space Force Base in Aurora, Colorado, with work spanning multiple locations across the base including areas such as the Mississippi Gate Entrance, Fire Station, and various recreational and operational facilities.

Notice text

2 versions

Update #2 · Latest ·

This is a new requirement to for commercial construction services to install striping and signage to cross walks and speed humps. The Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to perform striping, restriping and signage of the crosswalks and speed humps at Buckley, Space Force Base (SFB). Please see attached Statement of Work (SOW) and Request for Quote document for further details. 

A pre-site visit will be held if requested, however due to fiscal year restraints and our timeline, we intend to provide you enough information that a site visit is not deemed necessary. Site-visit request are due by 23 Sept 2025 at 1:00pm (MDT) and must be accompanied by the attached Form 128 Access Roster. If a site vist does take place, it will occur 25 Sept 2025.

Question regarding the solicitation are due to the Contracting Officer and Contracting specialists listed as the primary and secondary points of contact by 3:00pm MST 25 Sept 2025. Please include both listed points of contact on all communication.

Quotes regarding the solicitation are due to the Contracting Officer and Contracting specialists listed as the primary and secondary points of contact by 3:30pm MST 26 Sept 2025. Please include both listed points of contact on all communication.

Q&A for FA254325Q0050:
Question: Can you clarify what the actual shutdown expectations will be, and how you’d like communications handled with base personnel during the work? As written, the traffic control components (certified supervisor, 30-day plan, etc.) would likely cost more than the striping itself, which doesn’t seem like the intent here. Are you looking for full lane closures and detailed submittals, or would more limited, short-term controls (cones/flagging) be acceptable during restriping?

Answer : Correct, that is not the intent here. The contractor provided cones and flagging to ensure the safety of the product provided to the government is acceptable. Of course, if drying paint were smeared everywhere because a car ran through it (and there were no protective devices), the Contractor would be liable – whatever they see fit.

Update #1 ·

This is a new requirement to for commercial construction services to install striping and signage to cross walks and speed humps. The Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to perform striping, restriping and signage of the crosswalks and speed humps at Buckley, Space Force Base (SFB). Please see attached Statement of Work (SOW) and Request for Quote document for further details. 

A pre-site visit will be held if requested, however due to fiscal year restraints and our timeline, we intend to provide you enough information that a site visit is not deemed necessary. Site-visit request are due by 23 Sept 2025 at 1:00pm (MDT) and must be accompanied by the attached Form 128 Access Roster. If a site vist does take place, it will occur 25 Sept 2025.

Question regarding the solicitation are due to the Contracting Officer and Contracting specialists listed as the primary and secondary points of contact by 3:00pm MST 25 Sept 2025. Please include both listed points of contact on all communication.

Quotes regarding the solicitation are due to the Contracting Officer and Contracting specialists listed as the primary and secondary points of contact by 3:30pm MST 26 Sept 2025. Please include both listed points of contact on all communication.