BLK NF Spearfish WC Asbestos Abatement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1240LP25Q0113
- Agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562910 Remediation Services
- Place of performance
- Spearfish, South Dakota 57783, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service's Rocky Mountain Region is seeking a contractor to perform asbestos abatement services at the Spearfish Work Center Flammable Storage Building in the Black Hills National Forest, South Dakota. The scope involves removing approximately 1,025 square feet of asbestos-containing building materials (ACBM), specifically transite wall and ceiling panels, from the interior of the flammable paint storage shed, along with all associated labor, materials, equipment, transportation, and disposal services. Contractors must hold South Dakota Department of Agriculture and Natural Resources (SD DANR) certifications for project supervisors and workers, and must submit technical proposals demonstrating past performance, technical capability, and required certifications along with an Asbestos Abatement Safety Plan and Quality Control Plan with third-party air monitoring. The evaluation criteria focus on technical capability (meets/does not meet standard), past performance (rated from exceptional to unsatisfactory), and price reasonableness. Proposals are due electronically to stephen.holly@usda.gov by September 29, 2025, at 10:00 AM Mountain Time, with an organized site visit scheduled for 10:00 AM on Friday, September 26, 2025.
This procurement is designated as a 100% set-aside for small businesses under NAICS code 562910 (Remediation Services). No incumbent contractors or specific award values are identified in the solicitation materials, though the project is structured as a lump sum contract with three primary components: general requirements/mobilization, asbestos material removal, and disposal of asbestos-containing materials. The performance period runs from September 30, 2025, through October 30, 2025, with a delivery completion date of December 19, 2025, and the contractor must comply with prevailing wage requirements outlined in the Department of Labor's wage determination. The work location is approximately 2 miles south of Spearfish, South Dakota, at an elevation of 4,375 feet, with the project serving as a preparatory step for the building's final decommissioning after a replacement storage facility was already installed in fiscal years 2022-2023. All work must comply with federal and state regulations including OSHA, EPA, and South Dakota environmental guidelines.
Notice text
3 versions
Update #3 · Latest ·
This is a requirement for the Contractor to be responsible for supplying all labor, materials, equipment, supplies, utilities, transportation, disposal, and applicable fees for removal of approximately 1025 square feet of Asbestos Containing Building Material (ACBM) from the interior of the Flammable Paint Storage Shed and dispose. The ACBM is identified as asbestos wall and ceiling board. Complete specifications and solicitaiton response requirements are in the attached solicitaiton, and supporting documents.
AN ORGANIZED SITE VISIT WILL BE HELD AT10AM, FRIDAY 9/26/2025.
Additional specificaitons are now attached.
Update #2 ·
This is a requirement for the Contractor to be responsible for supplying all labor, materials, equipment, supplies, utilities, transportation, disposal, and applicable fees for removal of approximately 1025 square feet of Asbestos Containing Building Material (ACBM) from the interior of the Flammable Paint Storage Shed and dispose. The ACBM is identified as asbestos wall and ceiling board. Complete specifications and solicitaiton response requirements are in the attached solicitaiton, and supporting documents.
AN ORGANIZED SITE VISIT WILL BE HELD AT10AM, FRIDAY 9/26/2025.
Update #1 ·
This is a requirement for the Contractor to be responsible for supplying all labor, materials, equipment, supplies, utilities, transportation, disposal, and applicable fees for removal of approximately 1025 square feet of Asbestos Containing Building Material (ACBM) from the interior of the Flammable Paint Storage Shed and dispose. The ACBM is identified as asbestos wall and ceiling board. Complete specifications and solicitaiton response requirements are in the attached solicitaiton, and supporting documents.
Files
| File | Type | Posted |
|---|---|---|
| Spearfish WC Flamm Storage Specs Draft Final 15Sept2025.pdf | ||
| _1240LP25Q0116.pdf | ||
| Drawings Final 23May2025.pdf | ||
| WD 2015-5377 r29 20250708.pdf | ||
| Statement-of-Work-Spearfish Asbestos r1.docx | DOCX document | |
| Site Map.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| BLK NF Spearfish WC Asbestos Abatement | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Bunkhouse Asbestos Mitigation | Forest Service | Total Small Business | |
| F108--620-26-206 Asbestos Abatement | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Fenn Ranger Station roofing replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity