Drawings Final 23May2025.pdf

PDF 7 MB Posted

Attached to
BLK NF Spearfish WC Asbestos Abatement
Solicitation number
1240LP25Q0113
Issued by

About this file

This document is a set of construction design and project documents for an Asbestos Abatement project for a Flammable Storage Building at the Spearfish Work Center in the Black Hills National Forest, managed by the USDA Forest Service, Rocky Mountain Region (R2).

The project involves removing all asbestos transite panels from walls and ceilings of an existing storage building located at the Spearfish Work Center. Key specifications include: removing conduits, lights, and other attachments necessary for asbestos removal, disposing of all asbestos-containing materials, and preparing the building for future demolition. The project documents include detailed site maps, architectural drawings, interior and exterior photographs documenting the asbestos panels, and general notes outlining the scope of work. The project is scheduled for May 2025, with design work completed by personnel including R. Zacher, A. Settle, and R. Adam from the Forest Service's engineering division.

View the file

Other files

File Type Posted
Spearfish WC Flamm Storage Specs Draft Final 15Sept2025.pdf PDF
Statement-of-Work-Spearfish Asbestos r1.docx DOCX document
Site Map.pdf PDF
_1240LP25Q0116.pdf PDF
WD 2015-5377 r29 20250708.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/14

/23

:1 6 T

FI

LL

MO

RE

-F

RE

Y C :\U

SE

RS

\T

FI

LL

MO

RE

-F

RE

Y\

BO

X\

B

UI

LD

IN

GS

S

TR

UC

TU

RE

S\

BU

IL

DI

NG

S&

FA

CI

LI

TI

ES

\73

F

AC

IL

IT

IE

S\

PR

OJ

EC

TS

\P

RO

JE

CT

S\

NO

RT

HE

RN

H

IL

LS

P

RO

JE

CT

S\

SP

EA

RF

IS

H

W C

PR

OJ

EC

TS

\S

PE

AR

FI

SH

W

C

SH

OP

R

OO

F

RE

PL

AC

EM

EN

T\

DR

AW

IN

GS

\S

PE

AR

FI

SH

W

C

RO

OF

.D

W G

R2

ROCKY MOUNTAIN REGION

FLAMMABLE

STORAGE

BUILDING

ASBESTOS

ABATEMENT

BLACK HILLS NATIONAL

FOREST

NORTHERN HILLS RANGER DISTRICT

SITE MAP

11/29/2023

B BEAM

T FILLMORE-FREY

A. SETTLE

2 65

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

ARCHIVE NO.

DRAWING SHEET NO.

United States Department of Agriculture Forest Service

R2

ROCKY MOUNTAIN REGION

FLAMMABLE

STORAGE

BUILDING

ASBESTOS

ABATEMENT

BLACK HILLS NATIONAL

FOREST

NORTHERN HILLS RANGER DISTRICT

INTERIOR PHOTOS

R. ZACHER

DRAWN

A. SETTLE

CHECKED

R. ADAM

PROJECT NO. SHEET 4 OF 5

DATE

MAY 2025

DESIGNER

Asbestos Transite panels on ceiling and wall corner, typical.

Asbestos transite panels on ceiling, typical. Lights and conduit to be removed as necessary and disposed of off-site.

Northwest corner. Southwest corner,.

Asbestos transite panels on walls and ceiling, typical. Lights, conduits, fan and heater to be removed as necessary and disposed off-site. Shelving units, furniture, and other materials wlll be removed by Government prior to Contractor’s work period.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

ARCHIVE NO.

DRAWING SHEET NO.

United States Department of Agriculture Forest Service

R2

ROCKY MOUNTAIN REGION

FLAMMABLE

STORAGE

BUILDING

ASBESTOS

ABATEMENT

BLACK HILLS NATIONAL

FOREST

NORTHERN HILLS RANGER DISTRICT

EXTERIOR PHOTOS

R. ZACHER

DRAWN

A. SETTLE

CHECKED

R. ADAM

PROJECT NO. SHEET 5 OF 5

DATE

MAY 2025

DESIGNER

Exterior of building. South (front) and west sides.

Exterior of building. South (front) and east sides.

GENERAL NOTES:

1. REMOVE ALL ASBESTOS TRANSITE PANELS COVERING WALLS AND CEILINGS.

2. BUILDING WILL BE DEMOLISHED IN FUTURE. DEMOLITION OF BUILDING IS NOT IN THIS CONTRACT.

3. CONTRACT SHALL REMOVE CONDUIT, LIGHTS, AND OTHER ATTACHMENTS AS NECESSARY FOR ASBESTOS REMOVAL AND

DISPOSE OF AS ASBESTOS-CONTAINING MATERIAL.

4. NO MATERIALS AND EQUIPMENT NEED TO BE REATTACHED.

5. GOVERNMENT WILL REMOVED PORTABLE ITEMS SUCH AS SHELVING, FURNITURE, AND DEBRIS PRIOR TO CONTRACTOR’S

WORK.

Exterior of building, North, (rear) side.

drawings 1245.pdf
Title Sheet.pdf
Site Map 2.pdf
Sheets and Views
Spearfish WC Roof-Site
3531 Spearfish WC Flamm Storage Original Plan 1977.pdf
drawings 1245
Photos 5.pdf
Slide Number 1
Photos 4.pdf
Slide Number 1

File details come from the government source that posted it. Updated .