238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
N059 Installation Of Equipment- Electrical And Electronic Equipment Components
Place of performance
Minot AFB, North Dakota 58704, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Global Strike Command, specifically the 5th Munitions Squadron at Minot Air Force Base, is soliciting bids for an air compressor installation project in Building 975. The contract requires the installation of an 80-gallon Chicago Pneumatic air compressor, including 150 linear feet of 3/4" pneumatic airline, 50 feet of main power electrical wiring, 50 feet of 208 outlet wiring, and 30 feet of condensate piping. The technical requirements are detailed in the Performance Work Statement (PWS), which specifies precise installation specifications, compliance with manufacturer guidelines, and adherence to applicable codes. The evaluation will be conducted on a pass/fail basis for technical capability, with price also being a significant factor in the award decision. Quotes are due by April 2, 2025, and must remain valid through October 1, 2025, with the understanding that current funding is not available and the government reserves the right to cancel the solicitation.

The solicitation is a 100% small business set-aside under NAICS code 238210 with a size standard of $19.0 million, targeting electrical contractors and wiring installation professionals. The place of performance is Minot Air Force Base in North Dakota, with work to be completed during normal business hours (7:30 a.m. to 4:30 p.m. CST, Monday through Friday). Contractors will need to obtain base access passes and follow strict security, environmental, and quality control requirements outlined in the PWS. The project involves installing an air compressor to provide service air to a ProFormer Cabinet System (bead blaster), with specific electrical and pneumatic installation requirements. Contractors must provide all necessary personnel, equipment, tools, materials, transportation, and supervision to complete the installation, ensuring compatibility with existing facility infrastructure and meeting all technical specifications detailed in the solicitation documents.

Notice text

6 versions

Update #6 · Latest ·

Ammendment 5 // 24 Mar 2025. Adding questions and answers from Site Survey in attachment: RFI Tracker - FA4528-25-Q-JKB01 Air Compressor

Ammendment 4 // 06 Mar 2025. Removing provisions and clauses from the Combo that no longer apply to the solicitiation.

Ammendment 3 // 05 Mar 2025.  Addition of Site Visit scheduled on 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB; and all questions are due COB 21 Mar 2025.

Ammendment 2 // 03 Mar 2025.  Addition of SCA Wage Determination.  Addition of Site Visit - date to be determined.

Ammendment 1 // 28 Feb 2025.  Addition of optional quote sheet.  Addition of avalability of funds verbage to SAM.gov description, previously on combo only.

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Site Visit scheduled for 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB.

- For Base Pass, Vendors will need to submit the Attachment: Minot AFB Base Pass Information by COB 14 Mar 25 to POCs

All questions are due COB 21 Mar 2025

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Notice to Offeror(s)/(Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

Update #5 ·

Ammendment 3 // 06 Mar 2025. Removing provisions and clauses from the Combo that no longer apply to the solicitiation.

Ammendment 3 // 05 Mar 2025.  Addition of Site Visit scheduled on 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB; and all questions are due COB 21 Mar 2025.

Ammendment 2 // 03 Mar 2025.  Addition of SCA Wage Determination.  Addition of Site Visit - date to be determined.

Ammendment 1 // 28 Feb 2025.  Addition of optional quote sheet.  Addition of avalability of funds verbage to SAM.gov description, previously on combo only.

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Site Visit scheduled for 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB.

- For Base Pass, Vendors will need to submit the Attachment: Minot AFB Base Pass Information by COB 14 Mar 25 to POCs

All questions are due COB 21 Mar 2025

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Notice to Offeror(s)/(Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

Update #4 ·

Ammendment 3 // 05 Mar 2025.  Addition of Site Visit scheduled on 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB; and all questions are due COB 21 Mar 2025.

Ammendment 2 // 03 Mar 2025.  Addition of SCA Wage Determination.  Addition of Site Visit - date to be determined.

Ammendment 1 // 28 Feb 2025.  Addition of optional quote sheet.  Addition of avalability of funds verbage to SAM.gov description, previously on combo only.

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Site Visit scheduled for 19 Mar 25 from 1300 to 1500 at Bldg 975, Minot AFB.

- For Base Pass, Vendors will need to submit the Attachment: Minot AFB Base Pass Information by COB 14 Mar 25 to POCs

All questions are due COB 21 Mar 2025

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Notice to Offeror(s)/(Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

Update #3 ·

Ammendment 2 // 3 Mar 2025.  Addition of SCA Wage Determination.  Addition of Site Visit - date to be determined.

Ammendment 1 // 28 Feb 2025.  Addition of optional quote sheet.  Addition of avalability of funds verbage to SAM.gov description, previously on combo only.

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Site Visit scheduled for TBD.

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Notice to Offeror(s)/(Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

Update #2 ·

Ammendment 1 // 28 Feb 2025.  Addition of optional quote sheet.  Addition of avalability of funds verbage to SAM.gov description, previously on combo only.

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Notice to Offeror(s)/(Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

Update #1 ·

The 5th Munitions Squadron at Minot AFB has a requirement for installing an Air Compressor and electrical wiring based upon Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

See Attachment 1 - PWS Air Compressor Installation (26 Feb 25)

Attachments

Files attached to this notice, newest first
File Type Posted
RFI Tracker - FA4528-25-Q-JKB01 Air Compressor (24 Mar 25).pdf PDF
Combo - FA4528-25-Q-JKB01 (Updated)(6 Mar 25).pdf PDF
Minot AFB Base Pass Information.xlsx XLSX spreadsheet
SCA WD 2015-5383.pdf PDF
Optional - Quote Sheet.xlsx XLSX spreadsheet
Combo - FA4528-25-Q-JKB01 (FINAL).pdf PDF
PWS - Air Compressor Installation (26 Feb 25).pdf PDF
Attachment 2 - Bead Blaster Specs.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity