This document is a Requests for Information (RFIs) tracker for Project FA4528-25-Q-JKB01 Air Compressor, associated with the 5th Munitions Squadron at Minot Air Force Base. The RFI document contains 15 detailed questions and responses related to the air compressor installation, covering technical specifications and installation requirements. Key details include confirmation of American-made product requirements, electrical specifications such as wire size, disconnect switch details, and air line installation parameters.
The RFIs address specific technical aspects of the project, including placement of the air compressor in the maintenance room, pipe sizing (150' of 3/4" pipe and 30' of 1/4" pipe), electrical disconnect labeling, and mounting requirements. Responses indicate flexibility in some areas, such as wire size, conduit size, and pipe material, with the primary constraints being code compliance and avoiding interference with existing infrastructure. All RFIs were received between 19-20 March 2025 and answered on 24 March 2025, suggesting a coordinated and timely information exchange to clarify project specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - FA4528-25-Q-JKB01 (Updated)(6 Mar 25).pdf | ||
| Minot AFB Base Pass Information.xlsx | XLSX spreadsheet | |
| SCA WD 2015-5383.pdf | ||
| Optional - Quote Sheet.xlsx | XLSX spreadsheet | |
| Combo - FA4528-25-Q-JKB01 (FINAL).pdf | ||
| PWS - Air Compressor Installation (26 Feb 25).pdf | ||
| Attachment 2 - Bead Blaster Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Date Recv'd Date Sent to MUNS RFI Response Date Answered
1 20-Mar-25 24-Mar-25 Is there a specific wire size required for this installation? No (whatever is required for the circuit). 24-Mar-25
2 20-Mar-25 24-Mar-25 Are American-made products mandatory? Yes 24-Mar-25
3 20-Mar-25 24-Mar-25 The specifications call for a 30-amp fused disconnect, but no fuse size was provided. Should we supply a specific fuse size?
30-amp fuse used for eletrical disconnect/safety switch near air compressor or size required from manufacturer specifications.
24-Mar-25
4 20-Mar-25 24-Mar-25
We observed that compression fittings were used throughout the existing electrical installation. Will compression fittings be required for this project as well?
No 24-Mar-25
5 20-Mar-25 24-Mar-25 Are throated connectors or insulation bushings required for the connectors? No 24-Mar-25
6 20-Mar-25 24-Mar-25 Is there a minimum conduit size mandated for this installation? No 24-Mar-25
7 20-Mar-25 24-Mar-25 Has the exact location for the air compressor been specified, or is that to be determined?
In the maitenance room with the other compressor. 24-Mar-25
8 20-Mar-25 24-Mar-25 Should the disconnect be labeled to indicate where the unit is fed from? Yes 24-Mar-25
9 20-Mar-25 24-Mar-25 If labeling is required, will label tape be acceptable, or do you require an engraved tag? Label tape is acceptable. 24-Mar-25
10 19-Mar-25 24-Mar-25 Does the gov't supplied air compressor need to be installed on a new concrete pad? If so please provide details for concrete pad.
No just needs to be level and secured, without interfering with existing infrastructure. (Shims provided).
24-Mar-25
11 19-Mar-25 24-Mar-25 What size air line does it need to be and can it be ran in black iron pipe or does it have to be sch. 80 pipe?
150' of 3/4" pipe and 30' of 1/4" pipe. Can be any material as long as it is up to code. 24-Mar-25
12 19-Mar-25 24-Mar-25 Where at in the mechanical room is the air compressor going to be placed?
On the left side of the other compressor underneath emergancy exit sign so we can use the same drain point.
24-Mar-25
13 19-Mar-25 24-Mar-25 Does it matter where the new lines are ran or can we run them anywhere and attach to anything that is currently there? Such as existing uni-strut?
Lines can be ran and attached to existing uni-strutcture. 24-Mar-25
Requests For Information (RFIs)
Intial Set of RFIs
Project: FA4528-25-Q-JKB01 Air Compressor
RFI # Date Recv'd Date Sent to MUNS RFI Response Date Answered
Requests For Information (RFIs)
Project: FA4528-25-Q-JKB01 Air Compressor
14 19-Mar-25 24-Mar-25 What size is the air line that we are tie-ing into? 3/4" or 1 1/4" 24-Mar-25
15 19-Mar-25 24-Mar-25 Does the new air line need to be painted? No 24-Mar-25