Blackrock District Parking Lot Repairs

Closed Solicitation Posted

Solicitation number
1240LT26Q0009
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Wyoming, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is soliciting sealed bids for asphalt crack sealing, slurry sealing, and pavement marking services at the Blackrock Ranger District facilities located in Wyoming. The base scope of work includes crack sealing of approximately 1,700 linear feet, slurry sealing of all asphalt pavements (18,620 square yards) at the District Office and Work Center, and installation of white permanent pavement markings including one ADA-compliant stall. Optional items include removal and replacement of concrete sidewalk and full-depth asphalt patching at two locations. Award will be made to the lowest-priced technically acceptable offeror under firm fixed-price terms. Sealed bids are due by 1500 hours local time on February 16, 2026, with contractor performance required to begin within 15 calendar days of notice to proceed and be completed within 30 calendar days. The contract specifies a performance period from June 15, 2026, through July 15, 2026, and all offers must remain valid for 90 calendar days following the bid deadline.

This solicitation is designated as a Total Small Business Set-Aside under NAICS code 238990 with a size standard of $16.50 million, and no incumbent contractor is identified. The project scope encompasses approximately 21,733 square yards of pavement across nine distinct areas at the Blackrock District Office and Work Center, with work specifications conforming to FP-14 standards and Forest Service Supplemental Specifications. Prevailing wage rates established by the Department of Labor for Teton County, Wyoming apply, ranging from $21.68 to $58.83 per hour depending on worker classification, plus applicable fringe benefits and paid sick leave requirements. Performance bonds are required, and the contractor must coordinate the work with the Contracting Officer Representative at least 21 days prior to performance and submit an approved traffic control plan. Work is located approximately 38 miles northeast of Jackson, Wyoming, within the Bridger-Teton National Forest, with utilities unavailable on-site and contractor responsibility for equipment pressure washing to prevent noxious weed introduction on National Forest System lands.

Notice text

The Blackrock Ranger District Parking Lot Repairs project includes base quote items of asphalt crack sealing (approx. 1700 LF) and slurry sealing all asphalt pavements at the Blackrock District Office and Work Center. Also included are white permanent pavement parking stall markings and one ADA style stall marking. Item quantities are outlined in the Schedule of Items and/or displayed on the drawings.  Optional quote items include removal of existing concrete sidewalk and replacement with new reinforced cement concrete and two locations needing full depth asphalt pavement patching (3” depth, Type II).  

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business
CO-rocky MTN arsnl NWR-patch hill road NAICS 237310 — No set-aside
Asphalt Repair at Carl Sandburg Historic Site NAICS 238990 Interior Business Center Total Small Business
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity