FSSS Blackrock RD Parking Lot Repairs.pdf
PDF 821 KB Posted
- Attached to
- Blackrock District Parking Lot Repairs
- Solicitation number
- 1240LT26Q0009
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is Forest Service Supplemental Specifications (FSSS) for a federal construction contract (0403 GAOA 4DH Blackrock RD Parking Lot Repairs) that modifies standard FP-14 specifications through a series of deletions and additions to various sections. The specifications establish requirements for asphalt concrete pavement repairs and crack sealing work on a National Forest System road parking lot.
The work consists of two primary components: asphalt concrete pavement construction using hot or warm mix asphalt (HMA or WMA) in Type I or Type II formulations, and asphalt pavement crack sealing and filling. Type I mixes must submit state department of transportation-approved Job Mix Formulas (JMF) at least 30 days before production, conforming to volumetric, Hveem, or Marshall design parameters with moisture susceptibility requirements. Type II mixes use standard local specifications for crushed stone or gravel combined with asphalt binder. Asphalt concrete placement requires temperatures conforming to specified ranges, mechanical paving equipment with grade and slope controls, and compaction to a minimum of 91.0 percent maximum specific gravity density, verified through nuclear density gauge testing. Crack sealing work employs hot-applied sealant materials requiring specialized equipment including air lances capable of 2000°F heated compressed air, heated application wands, and indirect-heating kettles. Pavement surface acceptance is measured using 10-foot straightedge methodology with tolerances of ¼ inch maximum deviation. Sampling and testing occur at specified frequencies with split samples and 24-hour reporting timelines. Contract quantities adjust only when original design errors exceed 15 percent. The specifications reference current AASHTO, ASTM, and state transportation standards in effect at solicitation date and incorporate FAR Clause 52.246-12 inspection requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination Teton County Wyoming.pdf | ||
| Blackrock RD Parking Lot Repairs Final Drawings.pdf | ||
| Solicitation.docx | DOCX document | |
| Blackrock RD Parking Lot Repair Photos.pdf | ||
| Blackrock RD Parking Lot SOW.pdf | ||
| 1240LT26Q0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0403 GAOA 4DH Blackrock RD Parking Lot Repairs
Forest Service Supplemental Specifications (FSSS) 1
Table of Contents Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Quote¸ Award¸ and Execution of Contract
Delete Section 102
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04
104.06 Use of Roads by Contractor
105 - Control of Material
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
107 - Legal Relations and Responsibility to the Public
Delete Subsection 107.05
108 - Prosecution and Progress
Delete Section 108
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09
109.01 Measurement of Work
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts
Delete Section 155
403 – ASPHALT CONCRETE
Section 403. — ASPHALT CONCRETE
Table 403-2
414 – ASPHALT PAVEMENT CRACK SEALING AND FILLING
Section 414 — ASPHALT PAVEMENT CRACK SEALING
Forest Service Supplemental Specifications (FSSS) 2
Preface Preface_wo_04_26_2021
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest
System Roads.
Forest Service Supplemental Specifications (FSSS) 3
101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_11_9_2016
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_1_22_2020
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Forest Service Supplemental Specifications (FSSS) 4
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2)
Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective quoters.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road
Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards —
Forest Service Supplemental Specifications (FSSS) 5
The minimum size and percent soundness of trees described in Public Works contract specifications or
Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
Forest Service Supplemental Specifications (FSSS) 6
102 - Quote¸ Award¸ and Execution of Contract 102.00_National_11_9_2016
Delete Section 102 in its entirety.
Delete Section 102.
Forest Service Supplemental Specifications (FSSS) 7
103 - Scope of Work 103.00_National_11_9_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
Forest Service Supplemental Specifications (FSSS) 8
104 - Control of Work 104.00_National_11_9_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_11_9_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road
Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Forest Service Supplemental Specifications (FSSS) 9
105 - Control of Material 105.05_National_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
Forest Service Supplemental Specifications (FSSS) 10
106 - Acceptance of Work 106.01_National_7_18_2017
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for quotes.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit quote price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
Forest Service Supplemental Specifications (FSSS) 11
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the
Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_11_9_2016
Delete Subsection 106.02 and replace with the following:
Forest Service Supplemental Specifications (FSSS) 12
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
Forest Service Supplemental Specifications (FSSS) 13
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Delete Subsection 107.05.
Delete Subsection 107.05.
Forest Service Supplemental Specifications (FSSS) 14
108 - Prosecution and Progress 108.00_National_11_9_2016
Delete Section 108 in its entirety.
Delete Section 108.
Forest Service Supplemental Specifications (FSSS) 15
109 - Measurement and Payment 109.00_National_11_9_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019
Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement
Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1
Decimal Accuracy of Quantities for Final Payment
Pay Item Level of Precision
Linear Foot 1
Exception--Timber, Steel, and concrete Piles 0.1
Station 0.1
Mile 0.01
Square Foot 0.1
Square Yard 0.1
Each 1
Acre 0.01
Gallon 1
M-Gals. 0.1
Cubic Yard 1
Exception--Structure Excavation; Sheathing
Materials; Bedding, Bed Course, and Backfill
Materials; Gabions;
0.1
Exception--Concrete; Masonry 0.01
Pound 1
Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Forest Service Supplemental Specifications (FSSS) 16
Station Yard 1
Cubic Yard Mile 1
Ton Mile 1
109.02_National_11_9_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Forest Service Supplemental Specifications (FSSS) 17
155 - Schedules for Construction Contracts 155.00_National_11_9_2016
Delete Section 155 in its entirety.
Delete Section 155.
Forest Service Supplemental Specifications (FSSS) 18
403 – ASPHALT CONCRETE
Delete Section 403 in its entirety and replace with the following.
Section 403. — ASPHALT CONCRETE Description
403.01 This work consists of constructing asphalt concrete pavement using a hot or warm mix asphalt (HMA or WMA). Asphalt concrete type is designated as Type I or Type II according to Subsection 403.02.
Construction Requirements
403.02 Composition of Mix (JMF). Conform to current state department of transportation material specifications for asphalt concrete.
(a) Type I. Submit a state department of transportation JMF approved within the past 12 months for approval at least 30 days before production. For each proposed JMF, submit a production certification conforming to state department of transportation specifications and conforming to design parameter (a), (b), or (c) for the type of mix submitted and conforming to design parameter (d) in Table 403-1.
Table 403-1 Asphalt Concrete Mix Requirements
Design Parameters Specification
(a) Volumetric hot asphalt concrete pavement (AASHTO M 323, AASHTO R 35, and AASHTO T 312)
Gyratory compaction level 7, 75, 115
Volumetric properties at 0.3 to 3 million ESAL’s (AASHTO M 323) See Table 401-1
(b) Hveem (AASHTO T 246 and AASHTO T 247) Stabilometer, minimum 35
Percent air voids (1) 3.0 – 5.0
(c) Marshall (AASHTO T 245)
Stability, pounds (kilonewtons), minimum 1500 (6.67) Flow, 0.01 inches (0.25 millimeters) 8 – 16
Percent air voids (1) 3.0 – 5.0
Compaction, number of blows each end of test specimen 50
(d) Moisture susceptibility (AASHTO T 283)
0.80 Tensile strength ratio, minimum
(1) The percent of air voids are based on AASHTO T 166, AASHTO T 209 and AASHTO T 269.
(b) Type II. Provide a mix composed of crushed stone or gravel and asphalt binder mixed in an approved plant. Use an aggregate gradation and asphalt binder of a quality conforming to those normally used locally by either Federal, state or local agencies for the type of work being constructed.
Forest Service Supplemental Specifications (FSSS) 19
Submit the strength, quality, and gradation specifications for the asphalt concrete mix.
Include copies of laboratory test reports that demonstrate aggregate, asphalt binder, additive, and mix properties meet Federal, state or local government agency specifications.
For both Type I and Type II, submit the maximum specific gravity (density) of the mix as determined by AASHTO T 209.
403.03 Production Start-Up Procedures. See Subsection 153.04(b).
403.04 Mixing Plant. See Subsection 401.04.
403.05 Surface Preparation. See Subsection 401.06.
403.06 Weather Limitations. See Subsection 401.07.
403.07 Hauling. See Subsection 401.11.
403.08 Placing and Finishing. Do not use mixes produced from different plants unless the mixes are produced according to the same JMF, use material from the same sources, and are approved.
Place HMA at a temperature conforming to Table 401-2. Place WMA at temperatures conforming to Subsection 401.03. Measure temperature of the asphalt concrete mix in the hauling vehicle just before dumping into the spreader or measure it in the windrow immediately before pickup.
(a) Asphalt concrete for roadway construction. Place the mix with a paver conforming to
Subsection 401.05. Control horizontal alignment using a reference line. Automatically control the grade and slope from reference lines, a ski and slope control device, or dual skis. Use skis having a minimum length of 20 feet (6 meters).
In areas where mechanical spreading and finishing is impractical; place and finish the asphalt concrete mix according to Subsection 403.08(b).
Offset the longitudinal joint according to Subsection 401.13.
(b) Asphalt concrete for non-roadway uses. Spread and finish each course by hand raking, screeding, or by other approved methods.
403.09 Compacting. Thoroughly and uniformly compact the asphalt surface by rolling. In places inaccessible to rollers, use alternate equipment approved by the CO. Do not cause cracking, shoving or undue displacement.
Monitor the compaction process with nuclear density gauges calibrate according to the ASTM
D2950 calibration section within 6 months before use. Check the standard and reference on each day of use according to the ASTM D2950 standardization and reference check sections.
Compact to at least 91.0 percent of the maximum specific gravity (density) determined in
Subsection 403.02.
Forest Service Supplemental Specifications (FSSS) 20
No individual compaction test result shall have a density less than 89 percent of maximum specific gravity and the average of all the compaction tests results shall be greater than 91.0 percent of the maximum specific gravity.
Continue compaction until surface marks are eliminated and cracks are sealed.
403.10 Joints, Trimming Edges, and Cleanup. See Subsection 401.15.
403.11 Pavement Straightedge Measurement. Measure the pavement surface using a 10-foot
(3-meter) metal straightedge at right angles and parallel to the centerline. Defective areas are deviations between the surface and the bottom of the straightedge in excess of ¼ inches (6 millimeters) measured between two contacts of the straightedge or deviations in excess of ¼ inches (6 millimeters) measured at the end of the straightedge.
Correct defective areas according to Subsection 401.16(g)(1) through (4). Obtain approval for the method of correction.
403.12 Acceptance. See Table 403-2 for sampling, testing, and acceptance requirements.
Asphalt concrete mix properties will be evaluated under Subsection 106.04.
Asphalt binder will be evaluated under Subsection 106.03.
Construction of asphalt concrete work will be evaluated under Subsections 106.02 and 106.04.
Pavement straightedge measurement will be evaluated under Subsection 106.04.
Quality assurance compaction tests must be taken at locations provided by the CO for acceptance.
Measurement
403.13 Measure the Section 403 pay items listed in the schedule of items according to Subsection 109.02.
Payment
403.14 The accepted quantities will be paid at the contract price per unit of measurement for the Section
403 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Forest Service Supplemental Specifications (FSSS) 21
Table 403-2
Sampling, Testing, and Acceptance Requirements
Material or
Product
(Subsection)
Type of
Acceptance
(Subsection)
Charact eristic
Test Methods
Specifications
Sampling
Frequency
Point of
Sampling
Split
Sample
Reporting
Time Remarks
Production
Asphalt concrete
Type I or II (403.02(a))
Measured and tested for conforman ce (106.04)
Density ASTM D2950 (Average of up to 4 measurements per test. Rotate gauge 90 degrees for each measurement.)
10 per day at specified locations
In-place after compacting
Yes 24 hours −
Surface Straightedge Continuously, Finished No " − toleranc e measurement, after pavement
Subsection compaction surface
403.11
Placement − First load Hauling vehicle
" Upon − tempera ture and as before dumping, completion determined by or windrow of
CO
thereafter before pickup measureme nt
Process control Gradation AASHTO Contractor Cold feed or " 24 −
(153.03) at the plant
T 27 & T 11 determined hot bins hours as applicable
Moisture AASHTO " Stockpile " " − content of
T 255 aggrega tes
Density ASTM 1 per In-place after " " −
D2950 500 feet compacting
(150 meters)
Forest Service Supplemental Specifications (FSSS) 22
414 – ASPHALT PAVEMENT CRACK SEALING AND FILLING
Delete Section 414 in its entirety and replace with the following.
Section 414 — ASPHALT PAVEMENT CRACK SEALING.
Description
414.01 This work consists of cleaning, sealing, and filling cracks in asphalt pavement surfaces.
Material
414.02 Conform to the following Section and Subsection:
Asphalt concrete 403
Joint sealants and crack fillers (hot applied) 712.01(a)
Construction Requirements
414.03 Equipment. Furnish equipment with the following capabilities:
(a) Air lance. A hot compressed air lance capable of providing clean, oil-free compressed air at a volume of 100 cubic feet (2.8 cubic meters) per minute, a pressure of 120 pounds per square inch
(830 kilopascals), and a temperature of 2000 °F (1100 °C).
(b) Application wand. A wand attached to a heated hose attached to a heated material chamber that maintains material temperature within manufacturer’s tolerances. Supply proper wand tips for desired application.
(c) Heating kettle. An indirect-heating double boiler capable of constant and effective agitation.
Fill the space between the inner and outer shells with oil or other heat transfer medium. Provide an accurate and calibrated thermometer with a range from 200 to 600 °F in 5 °F graduations (90 to 320
°C in 2 °C graduations) located so the material temperature can be safely checked.
(d) Squeegee or screed. A hand-held squeegee or screed of appropriate configuration for filling cracks flush with the surface, underfilling cracks to recess below the surface, or overfilling cracks to an overband shape.
(e) Compressor. A compressor capable of producing oil- and water-free air at a minimum rate of 100 cubic feet (2.8 cubic meters) per minute with a minimum continuous line pressure of 125 pounds per square inch (860 kilopascals).
414.04 Cleaning. Prevent debris from entering waterways, travel lanes open to public traffic, or areas designated not to be disturbed. Remove dirt, dust, and other deleterious material from the crack walls and cavity using a stream of air or other approved methods.
Blow or brush dry material off the pavement surface.
414.05 Sealing and Filling. Dry the crack surfaces with the hot air lance before sealing or filling. Do not seal or fill cracks when the pavement surface temperature is below 35 °F
(2 °C) and weather conditions are rainy or foggy.
Forest Service Supplemental Specifications (FSSS)
(a) Sealing (cracks ¼ to 1 ½ inches (6 to 38 millimeters) wide). Submit a copy of and adhere to the manufacturer’s recommendations for heating and applying the hot applied crack material. Heat the material to pouring temperature in a heating kettle and continuously agitate the material.
Discard sealant when:
(1) Heated above the safe heating temperature recommended by the manufacturer;
(2) Held at pouring temperature for more than 12 hours;
(3) Reheated more than once; or
(4) Not consistent or uniform in appearance.
Warm and dry the crack surfaces using a hot-compressed air lance if the pavement temperature is lower than 50 °F (10 °C) or moisture is present. Keep the lance moving to prevent burning the pavement surface. Place and finish the material within
5 minutes after heating the pavement surface with the lance.
Use an application wand to place material in each crack from the bottom up. Insulate the wand to maintain pouring temperature while placing material. Return the wand to the heating kettle immediately after sealing each crack. Use a squeegee or screed to strike off the material.
Do not allow traffic on sealed cracks until the sealant has cured or is treated with debonding material recommended by the manufacturer and approved by the CO.
414.06 Resealing Cracks. Reseal cracks exhibiting adhesion failure, damage, incomplete filling, foreign objects in the sealant, or otherwise rejected by the CO.
414.07 Acceptance. Material for asphalt pavement crack sealing or filling will be evaluated under Subsections 106.02 and 106.03.
Asphalt pavement crack sealing and filling will be evaluated under Subsections 106.02 and 106.04.
Measurement
414.08 Measure the Section 414 pay items listed in the schedule of items according to Subsection 109.02.
Payment
414.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 414 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section. See
Subsection 109.05.
File details come from the government source that posted it. Updated .