Big Goose, Little Goose, & Goose Creek, Section 1135, Sheridan, WY
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F21B0016
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Sheridan, Wyoming 82801, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks restoration construction services along Big Goose Creek, Little Goose Creek, and Goose Creek located in Sheridan, Wyoming. The U.S. Army Corps of Engineers Omaha District is procuring the removal of non-native vegetation, excavation and stockpiling of topsoil, reconstruction of an existing concrete pedestrian trail further from the channel, installation of in-stream structures, seeding and planting of native vegetation, installation of drop structures and drainage features, and production of as-built drawings and a final report. Contractors must have the capability to perform this work according to engineering, safety, and construction standards on an expedited schedule while controlling costs. Bids are due by September 8, 2021.
This procurement has been set aside for total small business concerns. The primary NAICS code is 237990 and PSC code R499 applies. The place of performance will be along the three creeks in Sheridan, Wyoming. A mandatory pre-bid site visit is scheduled for August 11, 2021 at 1:00 PM MDT in Washington Park. The estimated value of this contract ranges between $1-5 million.
Notice text
The scope of work for this project includes:
1) Remove and dispose of non-native vegetation. Ensure topsoil infested with invasive species is disposed of properly. Bring in topsoil free from invasive vegetation
2) Excavate and stockpile topsoil for reuse
3) Remove and dispose of existing concrete pedestrian trail. Excavate channel bank and re-build concrete pedestrian trail on set-back channel bank
4) Construct in-stream features such as Newbury riffles, Vanes, J-hook vanes, and boulder clusters
5) Seed and install plantings in accordance with the drawings and specs
6) Water, fertilize, and install shrub protection cages as specified
7) Install drop structures and drainage structures.
Incidental work will include (but is not limited to) pre- and post-construction surveys; all laboratory and field material testing required herein; development of haul roads and borrow areas; borrow and haul road restoration, and development of a final report and as-built drawings. The contractor shall provide necessary and authorized resources to perform this work to applicable engineering, safety, and construction standards, in the timeliest manner possible, and with optimal cost containment.
**A site visit is scheduled for Wednesday, 11 August 2021 at 1:00 PM MDT. Participants will meet at Washington Park in Sheridan, WY. See FAR Clause 52.236-27 Site Visit Alt I in the solicitation for more information.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Big Goose, Little Goose, & Goose Creek, Section 1135, Sheridan, WY | Award Notice | |
| This notice | Solicitation | |
| Ecosystem Restoration - Little Goose Creek, Big Goose Creek, and Goose Creek - Sheridan, WY Section 1135 Project | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | ENDIST Omaha | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity