Bid Abstract_21B0016.pdf

PDF 204 KB Posted

Attached to
Big Goose, Little Goose, & Goose Creek, Section 1135, Sheridan, WY
Solicitation number
W9128F21B0016
Issued by

About this file

This document provides details for a federal construction solicitation. The solicitation seeks contractors to perform stream restoration work along the Big Goose, Little Goose, and Goose Creeks in Sheridan, Wyoming. The scope of work includes removing invasive vegetation, excavating and stockpiling topsoil, removing and replacing an existing concrete trail, constructing in-stream features like riffles and vanes, seeding and planting per drawings and specifications, installing drainage structures, and producing as-built drawings and a final report. A site visit is scheduled for August 11, 2021 at 1:00 PM MDT in Washington Park in Sheridan. Contractors are invited to bid on the base scope of work as well as two optional scopes involving additional construction activities. The solicitation was issued by the U.S. Army Corps of Engineers Omaha District and bids are due by September 8, 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED

29-Jul-2021

3. DATE OPENED

8-Sep-2021

DATE SIGNED

0001 Demolition 1 Job XXX 55,910.00$ XXX 220,000.00$ XXX 222,000.00$ 0002 Topsoil Stripping 1,200 CY 10.06$ 12,072.00$ 28.50$ 34,200.00$ 44.00$ 52,800.00$ 0003 Excavation 19,970 CY 5.87$ 117,223.90$ 19.00$ 379,430.00$ 11.00$ 219,670.00$ 0004 Fill 13,360 CY 5.94$ 79,358.40$ 30.00$ 400,800.00$ 9.50$ 126,920.00$ 0005 Topsoil Placement 1,540 CY 42.01$ 64,695.40$ 30.00$ 46,200.00$ 20.00$ 30,800.00$ 0006 Seeding & Mulching 4,400 SY 5.78$ 25,432.00$ 13.00$ 57,200.00$ 9.00$ 39,600.00$ 0007 Plantings 43,575 SY 0.67$ 29,195.25$ 1.50$ 65,362.50$ 0.40$ 17,430.00$ 0008 Drainage Structure No. 2 30" x 154' Class 3 RCP 1 Job XXX 40,400.00$ XXX 62,000.00$ XXX 46,900.00$ 0009 Construct Riffles in Goose Creek Channel 1,020 Ton 137.56$ 140,311.20$ 206.00$ 210,120.00$ 200.00$ 204,000.00$

0010 Construct Vane/J-Hook Rock Structures in Goose Creek Channel

600 Ton 138.01$ 82,806.00$ 285.00$ 171,000.00$ 190.00$ 114,000.00$

0011 Construct Boulder Clusters in Goose Creek Channel 160 Ton 139.59$ 22,334.40$ 491.00$ 78,560.00$ 320.00$ 51,200.00$ 0012 Construct Revetments in Goose Creek Channel 2,700 Ton 140.19$ 378,513.00$ 450.00$ 1,215,000.00$ 200.00$ 540,000.00$ 0013 Construct Boulder Clusters in Big Goose Creek Channel 50 Ton 139.59$ 6,979.50$ 325.00$ 16,250.00$ 290.00$ 14,500.00$

0014 Base Contract All Remaining Work (Excluding Items 0001- 0013)

1 Job XXX 174,030.00$ XXX 485,000.00$ XXX 703,777.00$

$1,229,261.05 $3,441,122.50 $2,383,597.00

0015 Demolition 1 Job XXX 7,770.00$ XXX 16,800.00$ XXX 2,800.00$ 0016 Topsoil Stripping 400 CY 3.41$ 1,364.00$ 30.00$ 12,000.00$ 41.00$ 16,400.00$ 0017 Excavation 500 CY 9.34$ 4,670.00$ 50.00$ 25,000.00$ 11.00$ 5,500.00$ 0018 Topsoil Placement 400 CY 6.00$ 2,400.00$ 25.00$ 10,000.00$ 9.90$ 3,960.00$ 0019 Seeding & Mulching 3,600 SY 1.43$ 5,148.00$ 13.00$ 46,800.00$ 9.00$ 32,400.00$ 0020 Plantings 39,650 SF 0.68$ 26,962.00$ 1.50$ 59,475.00$ 0.40$ 15,860.00$ 0021 Drainage Structure No. 1 12" x 52.2' Class 3 RCP 1 Job XXX 2,830.00$ XXX 40,000.00$ XXX 38,900.00$ 0022 Demolition 1 Job XXX 19,590.00$ XXX 29,000.00$ XXX 34,700.00$ 0023 Topsoil Stripping 490 CY 3.41$ 1,670.90$ 28.50$ 13,965.00$ 11.00$ 5,390.00$ 0024 Excavation 7,910 CY 9.32$ 73,721.20$ 23.50$ 185,885.00$ 29.00$ 229,390.00$ 0025 Fill 30 CY 5.94$ 178.20$ 39.00$ 1,170.00$ 41.00$ 1,230.00$ 0026 Topsoil Placement 490 CY 6.00$ 2,940.00$ 16.00$ 7,840.00$ 20.00$ 9,800.00$ 0027 Seeding & Mulching 4,400 SY 5.78$ 25,432.00$ 13.00$ 57,200.00$ 9.00$ 39,600.00$ 0028 Plantings 43,575 SF 0.67$ 29,195.25$ 1.30$ 56,647.50$ 0.40$ 17,430.00$ 0029 Construct 10' Wide Concrete Trail 570 LF 83.10$ 47,367.00$ 150.00$ 85,500.00$ 220.00$ 125,400.00$ 0030 Construct Riffles in Little Goose Creek Channel 1,040 Ton 137.83$ 143,343.20$ 195.00$ 202,800.00$ 220.00$ 228,800.00$

0031 Construct Vane/J-Hook Rock Structures in Little Goose Creek Channel

1,005 Ton 137.77$ 138,458.85$ 256.00$ 257,280.00$ 220.00$ 221,100.00$

0032 Construct Boulder Clusters in Little Goose Creek Channel 185 Ton 139.59$ 25,824.15$ 288.00$ 53,280.00$ 320.00$ 59,200.00$

0033 Option 1 Contract All Remaining Work (Excluding Items 0015-0032)

1 Job XXX 55,340.00$ XXX 150,000.00$ XXX 266,882.00$

614,204.75$ 1,310,642.50$ 1,354,742.00$

0034 Demolition 1 Job XXX 84,310.00$ XXX 67,500.00$ XXX 135,000.00$ 0035 Riprap 5,150 Ton 133.76$ 688,864.00$ 161.00$ 829,150.00$ 200.00$ 1,030,000.00$ 0036 Bedding 1,500 Ton 31.73$ 47,595.00$ 88.50$ 132,750.00$ 70.00$ 105,000.00$ 0037 Grout 500 CY 735.00$ 367,500.00$ 2,750.00$ 1,375,000.00$ 1,600.00$ 800,000.00$ 0038 Excavation 7,100 CY 11.35$ 80,585.00$ 67.50$ 479,250.00$ 14.00$ 99,400.00$ 0039 Sheetpile 4,488 Each 103.84$ 466,033.92$ 165.00$ 740,520.00$ 150.00$ 673,200.00$ 0040 Weep Drains 306 Each 497.00$ 152,082.00$ 234.00$ 71,604.00$ 210.00$ 64,260.00$

0041 Option 2 Contract All Remaining Work (Excluding Items 0034 - 0040)

1 Job XXX 42,740.00$ XXX 160,000.00$ XXX 1,286,963.55$

1,929,709.92$ 3,855,774.00$ 4,193,823.55$ 3,773,175.72$ 8,607,539.00$ 7,932,162.55$

BASIC ITEMS

ABSTRACT OF OFFERS - CONSTRUCTION

E. ESTIMATED

AMOUNT

9. OFFERS

B. REASONABLE CONTRACT

(Without Profit)

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

David W. Neal, Contracting Officer

5. PROJECT TITLE

Big Goose, Little Goose & Goose Creek, Section 1135 Sheridan, Wyoming

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type & Amount) 20%

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

D.

UNIT

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

B. BID SECURITY (Type & Amount) 20%

PAGE 1 OF 2 PAGES

A. OFFEROR

JR Civil, LLC 1780 Gabrielle Court Sheridan, WY 82801

A. OFFEROR

Western Municipal Construction, Inc.

5855 Elysian Rd.

Billings, MT 59101

NO. 1 NO. 2

1. SOLICITATION NUMBER

W918F21B0016

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F

A. HIRED LABOR

Total for Option #2 Items (0034-0041) Total for Base + Option #1 + Option #2

6. NUMBER OF AMENDMENTS ISSUED - 3 C. REASONABLE CONTRACT

(Including Profit)

Total for Basic Items (0001-0013)

OPTION #1

7A.

ITEM NO.

Total for Option #1 Items (0015-0033)

OPTION #2

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

SIGNATURE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

4. ISSUING OFFICE

US Army Corps of Engineers Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, NE 68102

D. UNIT

PRICE

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 Job XXX $120,000.00

0002 1,200 CY $30.00 $36,000.00

0003 19,970 CY $40.00 $798,800.00

0004 13,360 CY $50.00 $668,000.00

0005 1,540 CY $50.00 $77,000.00

0006 4,400 SY $6.00 $26,400.00

0007 43,575 SY $5.00 $217,875.00

0008 1 Job XXX $50,000.00 0009 1,020 Ton $200.00 $204,000.00 0010 600 Ton $200.00 $120,000.00 0011 160 Ton $250.00 $40,000.00 0012 2,700 Ton $200.00 $540,000.00 0013 50 Ton $300.00 $15,000.00 0014 1 Job XXX $2,000,000.00

$4,913,075.00

0015 1 Job XXX $125,000.00

0016 400 CY $50.00 $20,000.00

0017 500 CY $50.00 $25,000.00

0018 400 CY $30.00 $12,000.00

0019 3,600 SY $10.00 $36,000.00

0020 39,650 SF $5.00 $198,250.00

0021 1 Job XXX $25,000.00 0022 1 Job XXX $150,000.00

0023 490 CY $30.00 $14,700.00

0024 7,910 CY $30.00 $237,300.00

0025 30 CY $100.00 $3,000.00

0026 490 CY $50.00 $24,500.00

0027 4,400 SY $10.00 $44,000.00

0028 43,575 SF $5.00 $217,875.00

0029 570 LF $100.00 $57,000.00

0030 1,040 Ton $200.00 $208,000.00 0031 1,005 Ton $150.00 $150,750.00 0032 185 Ton $250.00 $46,250.00 0033 1 Job XXX $150,000.00

$1,744,625.00

0034 1 Job XXX $150,000.00 0035 5,150 Ton $200.00 $1,030,000.00 0036 1,500 Ton $40.00 $60,000.00

0037 500 CY $1,200.00 $600,000.00

0038 7,100 CY $30.00 $213,000.00

0039 4,488 Each $445.00 $1,997,160.00 0040 306 Each $200.00 $61,200.00 0041 1 Job XXX $150,000.00

$4,261,360.00 $10,919,060.00

Total for Option #2 Items (0034-0041) Total for Base + Option #1 + Option #2

A. OFFEROR

B. BID SECURITY (Type & Amount)

C. AMENDMENTS

ACKNOWLEDGED

2. PROJECT TITLE

Big Goose, Little Goose & Goose Creek, Section 1135 Sheridan, Wyoming

3. CONTRACT ITEMS

OPTION #1

OPTION #2

Total for Option #1 Items (0015-0033)

A. OFFEROR

Excel Wyoming PO Box 949 Sheridan, WY 82801

C. AMENDMENTS

ACKNOWLEDGED

INSTRUCTIONS Attach this sheet, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Use additional sheets as needed.

A. OFFEROR

NO. 4

C. AMENDMENTS

ACKNOWLEDGED - 3

Total for Basic Items (0001-0014)

NO. 5

B. BID SECURITY (Type & Amount) - 20%

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

4. OFFERS (Continued)

NO. 3

B. BID SECURITY (Type & Amount)

1. SOLICITATION NUMBER

W9128F21B0016

PAGE 2 OF 2 PAGES

BASIC ITEMS

PAGE1
PAGE2
2021-09-09T09:39:22-0500
NEAL.DAVID.W.1115489000

File details come from the government source that posted it. Updated .